  2. NF-1345

Bullhorn Integration->Completion percentage should not be 100% if new steps are added after completion of tour.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Bug Type:
      Functional
    • Module:
      Bullhorn
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      1] Access the tour details page using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      2] Assign a tour from the drop down.
      3] Take this tour and complete it.
      4] Completion percentage is displaying as 100%.
      5] Now added few new steps to the tour.
      6] Such steps get reflected on the page and showing status as pending.

      Actual Result:
      Though the status of newly added steps is pending % of completion is 100%

      Refer attached screenshot for more details.

      Cc: Saurabh Sablaka, Prasad Pise

        Attachments

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Field Original Value New Value
            Status Open [ 1 ] In Development [ 10007 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206)
            Remaining Estimate 12h [ 43200 ]
            Original Estimate 12h [ 43200 ]
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 08/May/17 11:45 AM
            • Time Spent:
              8.25h
               

              Debugging issue
              Discussion
              Fixed issue
              Unit Testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 12h [ 43200 ] 3.75h [ 13500 ]
            Time Spent 8.25h [ 29700 ]
            Worklog Id 44062 [ 44062 ]
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Hi Kunal Kedari
            After completion of tour if new steps are added to that tour then this tour steps(pending) are not displaying on page cause employee can't get that tour for completion.

            We just showing completed steps of tour if already completed tour with 100%,No, pending steps are shown.

            CC:Saurabh Sablaka

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Hi Kunal Kedari After completion of tour if new steps are added to that tour then this tour steps(pending) are not displaying on page cause employee can't get that tour for completion. We just showing completed steps of tour if already completed tour with 100%,No, pending steps are shown. CC: Saurabh Sablaka
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Modified Files
            App\BusinessLogic\OnBoarding\ManageTour.cs
            Database Objects\MasterCompanyDB\04_Stored Procedures\ob.OES_SP_GetTourStepsStatus.sql

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Modified Files App\BusinessLogic\OnBoarding\ManageTour.cs Database Objects\MasterCompanyDB\04_Stored Procedures\ob.OES_SP_GetTourStepsStatus.sql
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Code Review Date 09/May/2017
            Code Reviewed By Saurabh Sablaka [ 11909 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Assignee Seema Gaikwad [ seema.gaikwad ] Kunal Kedari [ kunal.kedari ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 10/May/17 12:14 PM
            • Time Spent:
              1h
               

              Testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 3.75h [ 13500 ] 2.75h [ 9900 ]
            Time Spent 8.25h [ 29700 ] 9.25h [ 33300 ]
            Worklog Id 44399 [ 44399 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            kunal.kedari Kunal Kedari (Inactive) logged work - 12/May/17 05:09 PM
            • Time Spent:
              0.5h
               

              Testing on LB

            kunal.kedari Kunal Kedari (Inactive) logged work - 15/May/17 08:37 AM
            • Time Spent:
              0.5h
               

              Testing on Stage

            seema.gaikwad Seema Gaikwad (Inactive) logged work - 15/May/17 11:21 AM - edited
            • Time Spent:
              1.5h
               

              LB testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 2.75h [ 9900 ] 1.75h [ 6300 ]
            Time Spent 9.25h [ 33300 ] 10.25h [ 36900 ]
            Worklog Id 45725 [ 45725 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 1.75h [ 6300 ] 1.25h [ 4500 ]
            Time Spent 10.25h [ 36900 ] 10.75h [ 38700 ]
            Worklog Id 45725 [ 45725 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified the fix on Local (wt-stage) , now if new steps added to existing one after completion of tour , then that step is not displaying on tour status page. We can move fix to Stage.

            cc: Saurabh Sablaka, Prasad Pise

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified the fix on Local (wt-stage) , now if new steps added to existing one after completion of tour , then that step is not displaying on tour status page. We can move fix to Stage. cc: Saurabh Sablaka , Prasad Pise
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Stage, as we are deploying Bullhorn changes to Production in one go, marking it as "Production Deployment on Hold"

            Cc: Saurabh Sablaka, Prasad Pise

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Stage, as we are deploying Bullhorn changes to Production in one go, marking it as "Production Deployment on Hold" Cc: Saurabh Sablaka , Prasad Pise
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Remaining Estimate 1.25h [ 4500 ] 0.75h [ 2700 ]
            Time Spent 10.75h [ 38700 ] 11.25h [ 40500 ]
            Worklog Id 47451 [ 47451 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Remaining Estimate 0.75h [ 2700 ] 0.25h [ 900 ]
            Time Spent 11.25h [ 40500 ] 11.75h [ 42300 ]
            Worklog Id 47591 [ 47591 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Link This issue relates to NF-948 [ NF-948 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified the fix on Production, if new steps added to existing one after completion of tour , then that step is not displaying on tour status page. Closing the ticket.

            Cc: Prasad Pise, Saurabh Sablaka

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified the fix on Production, if new steps added to existing one after completion of tour , then that step is not displaying on tour status page. Closing the ticket. Cc: Prasad Pise , Saurabh Sablaka
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            kunal.kedari Kunal Kedari (Inactive) logged work - 23/Jun/17 05:25 PM
            • Time Spent:
              0.5h
               

              Testing on Production

            kunal.kedari Kunal Kedari (Inactive) made changes -
            Remaining Estimate 0.25h [ 900 ] 0h [ 0 ]
            Time Spent 11.75h [ 42300 ] 12.25h [ 44100 ]
            Worklog Id 59048 [ 59048 ]
            Transition Time In Source Status Execution Times
            Seema Gaikwad (Inactive) made transition -
            Open In Development
            2d 15h 33m 1
            Seema Gaikwad (Inactive) made transition -
            In Development In LB Testing
            2d 4h 15m 1
            Kunal Kedari (Inactive) made transition -
            In LB Testing Stage Testing
            7d 4h 59m 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            36d 15h 1m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            14s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            2s 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 12h Original Estimate - 12h
                  12h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 12.25h
                  12.25h