Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-2018

Tour Completion Report >> Report Title text background UI disturbed

    Details

    • Type: Bug
    • Status: Resolution Setting
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Environment:
      QA
    • Bug Type:
      UI
    • Level:
      Admin, Partner
    • Module:
      OnBoard
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2
    • Browser:
      IE 11, Google Chrome, Mozilla Firefox

      Description

      Report Title text background width is not corrected after adding new column 'Job Position'. Please increase the width. PFA screen shot

      This issue is observed in Report Popup which is displayed on 'View Report' button. And it is also observed in Excel saved from this report. PFA screen shot

        Attachments

        1. LB-done.png
          LB-done.png
          214 kB
        2. LB-fixed.png
          LB-fixed.png
          171 kB
        3. UI disturbed.png
          UI disturbed.png
          269 kB
        4. UI disturbed 2.png
          UI disturbed 2.png
          143 kB

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Harshada Borole (Inactive) made transition -
            Open In Development
            1d 5h 10m 1
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Reopen in Local
            51m 39s 1
            Rajendra Joshi (Inactive) made transition -
            Reopen in Local In Development
            8d 23h 20m 1
            Rajendra Joshi (Inactive) made transition -
            Stage Testing Reopened in Stage
            15m 39s 1
            Rajendra Joshi (Inactive) made transition -
            Reopened in Stage In Development
            23d 18h 5m 1
            Rajendra Joshi (Inactive) made transition -
            In Development In LB Testing
            5d 16h 20m 3
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Stage Testing
            46d 6h 1m 2
            Rakesh Roy (Inactive) made transition -
            Stage Testing In Production Testing
            181d 1h 58m 1
            Rakesh Roy (Inactive) made transition -
            In Production Testing Production Complete
            7m 14s 1
            Rakesh Roy (Inactive) made transition -
            Production Complete Closed
            2m 14s 1
            Sachin Hingole (Inactive) made transition -
            Closed Resolution Setting
            69d 19h 16m 1

              People

              Assignee:
              rajendraj Rajendra Joshi (Inactive)
              Reporter:
              rajendraj Rajendra Joshi (Inactive)
              Developer:
              Harshada Borole (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Pre-Prod Due Date:
                Production Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0h
                  0h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 3h 20m
                  3h 20m