Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-227

TSR Integration->Get Tours->Error message is displaying if tour does not have any step.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Module:
      TSR
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q1

      Description

      Prerequisite:
      Tour should not have any step.

      Steps:
      1. Launch the Postman app.
      2. Select “Get” request from dropdwon.
      3. Select authorization type as “Basic Auth”.
      4. Enter Valid User ID and Password.
      5. Enter below URL:
      URL= http://wt-stage/api/Tours/GetTours?company=12480&tourType=ABC
      6. Click on Send button.
      7. Observe JSON output.

      Actual Result:
      "An error has occurred" message is displaying.
      Expected Result:
      Proper message should be display.

      Cc: Prasad Pise, Saurabh Sablaka

        Attachments

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Field Original Value New Value
            Link This issue relates to NF-55 [ NF-55 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Local (wt-stage) environment, now tour step is not displaying in JSON format if tour does not have any step. We can deploy fix to Stage.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Local (wt-stage) environment, now tour step is not displaying in JSON format if tour does not have any step. We can deploy fix to Stage.
            sushodhan.vaishampayan Sushodhan Vaishampayan (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ]
            Original Estimate 2h [ 7200 ]
            sushodhan.vaishampayan Sushodhan Vaishampayan (Inactive) logged work - 23/Feb/17 04:03 PM
            • Time Spent:
              2h
               

              Solving the issue

            sushodhan.vaishampayan Sushodhan Vaishampayan (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 0h [ 0 ]
            Time Spent 2h [ 7200 ]
            Worklog Id 27445 [ 27445 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Stage environment, now tour step is not displaying in JSON format if tour does not have any step. Marking it as production deployment on hold.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Stage environment, now tour step is not displaying in JSON format if tour does not have any step. Marking it as production deployment on hold.
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Assignee Sushodhan Vaishampayan [ sushodhan.vaishampayan ] Kunal Kedari [ kunal.kedari ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Issue Importance Q1 [ 14900 ]
            prasadp Prasad Pise (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Production environment, working as expected. Closing the issue.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Production environment, working as expected. Closing the issue.
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Transition Time In Source Status Execution Times
            Kunal Kedari (Inactive) made transition -
            Open In Development
            23h 57m 1
            Kunal Kedari (Inactive) made transition -
            In Development In LB Testing
            12s 1
            Kunal Kedari (Inactive) made transition -
            In LB Testing Stage Testing
            4d 21h 13m 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            58d 4h 44m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            34s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            2s 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 2h
                  2h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 2h
                  2h