Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-4742

Vision plan was not eligible even after enrolled in contingent Medical and Dental plan

    Details

    • Type: Bug
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Bug Fixed
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Labels:
      None
    • Environment:
      Others
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Harbinger
    • Company:
      Ashgrove
    • Item State:
      Stage QA - Production Deployment on Hold
    • Browser:
      Google Chrome

      Description

      Pre - requisite - 1.Vision Plan
      2.Contingent Eligibility Rule - For Medical Benefit type
      3.Additional Eligibility - Enrolled into Dental

      Step:-
      1.Login with EE credential
      2.OE start
      3.Navigate to Enroll Now page
      4.Enrolled into Medical and Dental

      Actual - Vision plan was not eligible for EE

      Expected - Vision plan should get enable

        Attachments

          Issue Links

            Activity

            mahendra.mungase Mahendra Mungase (Inactive) created issue -
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Field Original Value New Value
            Link This issue is caused by NF-4352 [ NF-4352 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Attachment Vision_Contingency.jpg [ 64439 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Attachment Vision_Contingency_1.jpg [ 64440 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Attachment Vision_Additioneligibility.jpg [ 64441 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Description Pre - requisite - 1.Vision Plan
                                     2.Contingent Eligibility Rule - For Medical Benefit type
                                     3.Additional Eligibility - Enrolled into Dental


            Step:-
            1.Login with EE credential
            2.OE start
            3.Navigate to Enroll Now page
            4.Enrolled into Medical and Dental

            Actual - Vision plan was not eligible for EE

            Expected - Vision plan should get enable
             !Vision_Contingency.jpg|thumbnail!

             !Vision_Contingency_1.jpg|thumbnail!

             !Vision_Additioneligibility.jpg|thumbnail!





            Pre - requisite - 1.Vision Plan
                                     2.Contingent Eligibility Rule - For Medical Benefit type
                                     3.Additional Eligibility - Enrolled into Dental


            Step:-
            1.Login with EE credential
            2.OE start
            3.Navigate to Enroll Now page
            4.Enrolled into Medical and Dental

            Actual - Vision plan was not eligible for EE

            Expected - Vision plan should get enable
            Hide
            mahendra.mungase Mahendra Mungase (Inactive) added a comment -

            User ID: jloper0593/Test_123456

            For QA-El Camino Hospital-Azure

            Show
            mahendra.mungase Mahendra Mungase (Inactive) added a comment - User ID: jloper0593/Test_123456 For QA-El Camino Hospital-Azure
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Please check on Azure

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Please check on Azure
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan J Khandave [ rohan.khandave ] Mahendra Mungase [ mahendra.mungase ]
            Hide
            mahendra.mungase Mahendra Mungase (Inactive) added a comment -

            We have verified it on Code Map and Observed that it does not exit.

            Thanks,
            Mahendra

            Show
            mahendra.mungase Mahendra Mungase (Inactive) added a comment - We have verified it on Code Map and Observed that it does not exit. Thanks, Mahendra
            mahendra.mungase Mahendra Mungase (Inactive) logged work - 14/Nov/17 04:32 AM
            • Time Spent:
              0.5h
               

              Bug regression

            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Company Ashgrove [ 18413 ]
            Environment Others [ 18445 ]
            Remaining Estimate 2h [ 7200 ]
            Original Estimate 2h [ 7200 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 1.5h [ 5400 ]
            Time Spent 0.5h [ 1800 ]
            Worklog Id 93086 [ 93086 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Stage Testing [ 10201 ] In Production Testing [ 10202 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status In Production Testing [ 10202 ] Production Complete [ 10028 ]
            Transition Time In Source Status Execution Times
            Rohan J Khandave (Inactive) made transition -
            Open In Development
            5h 9m 1
            Rohan J Khandave (Inactive) made transition -
            In Development In LB Testing
            4d 6h 17m 1
            Sachin Hingole (Inactive) made transition -
            In LB Testing Stage Testing
            90d 17h 3m 1
            Sachin Hingole (Inactive) made transition -
            Stage Testing In Production Testing
            99d 5h 14m 1
            Sachin Hingole (Inactive) made transition -
            In Production Testing Production Complete
            4m 52s 1

              People

              Assignee:
              mahendra.mungase Mahendra Mungase (Inactive)
              Reporter:
              mahendra.mungase Mahendra Mungase (Inactive)
              Developer:
              Rohan J Khandave (Inactive)
              QA:
              Mahendra Mungase (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 2h
                  2h
                  Remaining:
                  Time Spent - 0.5h Remaining Estimate - 1.5h
                  1.5h
                  Logged:
                  Time Spent - 0.5h Remaining Estimate - 1.5h
                  0.5h