Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-5760

All static reports and Manual Import/Export date picker is not showing

    Details

    • Type: Bug
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Bug Fixed
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      Pre Production
    • Bug Severity:
      Medium
    • Module:
      BenAdmin
    • Reported by:
      Harbinger
    • Company:
      All Clients/Multiple Clients
    • Item State:
      Stage QA - Ready for Production
    • UAT For:
      UI Refresh

      Description

      All Static Reports (From student verification report to EE upload document report ) and Manual Import/Export date picker option is not showing
      (Refer screen shots below)

      From EE login >> cannot select date on EE timesheet report.

      -------------------------------------------
      CC: Mandar Kulkarni, Satya, Rakesh Roy, Hrishikesh Deshpande, Sachin Hingole, Prasad Patil

        Attachments

        1. EE timesheet report.PNG
          EE timesheet report.PNG
          11 kB
        2. import-export.png
          import-export.png
          33 kB
        3. static report.jpg
          static report.jpg
          102 kB

          Issue Links

            Activity

            sumeet.kolge Sumeet.Kolge (Inactive) created issue -
            rakeshr Rakesh Roy (Inactive) made changes -
            Field Original Value New Value
            Assignee Nidhi Kaul [ nidhi.kaul ] Vijayendra Shinde [ ID10506 ]
            sumeet.kolge Sumeet.Kolge (Inactive) made changes -
            Description All Static Reports (From student verification report to EE upload document report ) and Manual Import/Export date picker option is not showing
            (Refer screen shots below)
             !static report.jpg|thumbnail!
             !import-export.png|thumbnail!

            -------------------------------------------
            CC: [~mandark], [~satyap], [~rakeshr], [~hrishikesh.deshpande], [~sachin.hingole], [~prasad.patil]
            All Static Reports (From student verification report to EE upload document report ) and Manual Import/Export date picker option is not showing
            (Refer screen shots below)
             !static report.jpg|thumbnail!
             !import-export.png|thumbnail!


            From EE login >> cannot select date on EE timesheet report.


            -------------------------------------------
            CC: [~mandark], [~satyap], [~rakeshr], [~hrishikesh.deshpande], [~sachin.hingole], [~prasad.patil]
            sumeet.kolge Sumeet.Kolge (Inactive) made changes -
            Attachment EE timesheet report.PNG [ 72032 ]
            sumeet.kolge Sumeet.Kolge (Inactive) made changes -
            Description All Static Reports (From student verification report to EE upload document report ) and Manual Import/Export date picker option is not showing
            (Refer screen shots below)
             !static report.jpg|thumbnail!
             !import-export.png|thumbnail!


            From EE login >> cannot select date on EE timesheet report.


            -------------------------------------------
            CC: [~mandark], [~satyap], [~rakeshr], [~hrishikesh.deshpande], [~sachin.hingole], [~prasad.patil]
            All Static Reports (From student verification report to EE upload document report ) and Manual Import/Export date picker option is not showing
            (Refer screen shots below)
             !static report.jpg|thumbnail!
             !import-export.png|thumbnail!


            From EE login >> cannot select date on EE timesheet report.
             !EE timesheet report.PNG|thumbnail!

            -------------------------------------------
            CC: [~mandark], [~satyap], [~rakeshr], [~hrishikesh.deshpande], [~sachin.hingole], [~prasad.patil]
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 22/Jan/18 02:36 PM
            • Time Spent:
              0.5h
               
              • Verify on Pre producation
              • Discussion with Sonali
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Assignee Vijayendra Shinde [ ID10506 ] Sonali Farakate [ sonali.farakate ]
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Link This issue duplicates NF-5751 [ NF-5751 ]
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Link This issue duplicates NF-5762 [ NF-5762 ]
            Hide
            sonali.farakate Sonali Farakate (Inactive) added a comment -

            This issue is already fixed. Please verify.

            Show
            sonali.farakate Sonali Farakate (Inactive) added a comment - This issue is already fixed. Please verify.
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Assignee Sonali Farakate [ sonali.farakate ] Sumeet.Kolge [ sumeet.kolge ]
            sonali.farakate Sonali Farakate (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 0.5h [ 1800 ]
            Worklog Id 101459 [ 101459 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Time Spent 0.5h [ 1800 ] 1h [ 3600 ]
            Worklog Id 101460 [ 101460 ]
            Hide
            prasad.patil Prasad Patil (Inactive) added a comment -

            Hi,

            Verified on Preprod. Working Fine as Expected.
            Thank you,
            -------------------------
            CC: Mandar Kulkarni, Prashant Samal, Sumeet.Kolge

            Show
            prasad.patil Prasad Patil (Inactive) added a comment - Hi, Verified on Preprod. Working Fine as Expected. Thank you, ------------------------- CC: Mandar Kulkarni , Prashant Samal , Sumeet.Kolge
            prasad.patil Prasad Patil (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            prasad.patil Prasad Patil (Inactive) logged work - 23/Jan/18 12:23 PM
            • Time Spent:
              0.5h
               

              Verifying issue on Preprod.

            prasad.patil Prasad Patil (Inactive) made changes -
            Time Spent 1h [ 3600 ] 1.5h [ 5400 ]
            Worklog Id 101610 [ 101610 ]
            sonali.farakate Sonali Farakate (Inactive) logged work - 23/Jan/18 04:30 PM
            • Time Spent:
              0.5h
               

              Verification

            prasad.patil Prasad Patil (Inactive) made changes -
            Assignee Sumeet.Kolge [ sumeet.kolge ] Sachin Hingole [ sachin.hingole ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Link This issue relates to NF-5728 [ NF-5728 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            Transition Time In Source Status Execution Times
            Sonali Farakate (Inactive) made transition -
            Open In Development
            3d 20h 4m 1
            Prasad Patil (Inactive) made transition -
            In Development In LB Testing
            1h 15m 1
            Prasad Patil (Inactive) made transition -
            In LB Testing Stage Testing
            3s 1
            Sachin Hingole (Inactive) made transition -
            Stage Testing In Production Testing
            59d 2h 33m 1
            Sachin Hingole (Inactive) made transition -
            In Production Testing Production Complete
            4m 24s 1

              People

              Assignee:
              sachin.hingole Sachin Hingole (Inactive)
              Reporter:
              sumeet.kolge Sumeet.Kolge (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1.5h
                  1.5h