Confirmation Statement - Does not show future enrollment even though there are future enrollments added for employee

    Details

    • Type: Bug
    • Status: Rejected
    • Priority: Medium
    • Resolution: System Behaviour
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Labels:
      None
    • Environment:
      Pre Production
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Level:
      Employee
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Harbinger
    • Company:
      FDU
    • Item State:
      Development - In Progress
    • Browser:
      IE 11, Google Chrome

      Description

      Log in as employee to preprod using below credentials.
      User Name : tehs01021990
      Password : Password@1/2
      Company : FDU for HSPL
      Save and continue till confirmation statement and observe the plans

      Actual result - Does not show future plans
      expected result - even though future enrollment is enabled on format confirmation statement, it does not show future enrollments.

      NOTE -
      1. curtain menu is not displaying future plans too.
      2. This behavior is same on production too.

        Attachments

          Issue Links

            Activity

            Hide
            ramesh.shinde Ramesh Shinde (Inactive) added a comment -

            Hi Sachin Hingole,

            As per Amruta's input "In our system all summary’s always populate by particular effective date. So when work flow is from 1/1/2018, only active election on 1/1/2018 will come on current and future summary. 2/1/2018 should not come", so rejecting this JIRA.

            Thanks,
            Ramesh Shinde

            CC:Vijayendra Shinde Amruta Lohiya

            Show
            ramesh.shinde Ramesh Shinde (Inactive) added a comment - Hi Sachin Hingole , As per Amruta's input "In our system all summary’s always populate by particular effective date. So when work flow is from 1/1/2018, only active election on 1/1/2018 will come on current and future summary. 2/1/2018 should not come", so rejecting this JIRA. Thanks, Ramesh Shinde CC: Vijayendra Shinde Amruta Lohiya
            Hide
            nidhi.kaul Nidhi Kaul (Inactive) added a comment -

            Ramesh Shinde
            What is the dev due date on this one?

            Show
            nidhi.kaul Nidhi Kaul (Inactive) added a comment - Ramesh Shinde What is the dev due date on this one?
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Please check.

            CC – Vijayendra Shinde

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Please check. CC – Vijayendra Shinde

              People

              Assignee:
              ramesh.shinde Ramesh Shinde (Inactive)
              Reporter:
              sachin.hingole Sachin Hingole (Inactive)
              Developer:
              Rohan J Khandave (Inactive)
              QA:
              Mahendra Mungase (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 7.5h
                  7.5h