Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-5893

SBM - Rejection Report - Scheduled this report - no record pulled

    Details

    • Type: Bug
    • Status: Resolution Setting
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Labels:
    • Environment:
      Others
    • Bug Severity:
      Medium
    • Module:
      BenAdmin - Report
    • Reported by:
      Support
    • Company:
      SBM
    • Item State:
      Production Complete - Closed
    • Sprint:
      WT- Sprint 43

      Description

      The Client requested a Rejection Report be forwarded to them by 1st of each month, to capture transaction from prior month.

      I created the SBM Rejection Report, under Static Reports. The first scheduled report ran 10/1/2017. When reviewing the "downloaded report"; it appeared to have downloaded a file but no file was in the "zipped file". When I manually ran the report, got 6 records.

      Please advise why the scheduled report did not attach a file and capture the 6 records obtain from manually running this report?
      This is what I get, please see below:

      Yashau
      Please ref: CT-2670

        Attachments

          Issue Links

            Activity

            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) created issue -
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Field Original Value New Value
            Link This issue clones WT-11705 [ WT-11705 ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Link This issue is blocked by WT-11389 [ WT-11389 ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Component/s UI Refresh [ 10902 ]
            Component/s BenAdmin [ 10000 ]
            Environment_Old Production [ 10005 ]
            Key WT-13326 NF-5893
            Project WORKTERRA [ 10000 ] New Features 2017 [ 11000 ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Link This issue is blocked by WT-11389 [ WT-11389 ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Assignee Venkatesh Pujari [ venkatesh.pujari ] Parmeshwar Jumbad [ parmeshwar.jumbade ]
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            Hide
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) added a comment -

            Please refer WT-11705 for all details like 3C's, Affected Areas, Tested Scenarios, etc.

            CC: Amruta Lohiya Gaurav Sodani

            Show
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) added a comment - Please refer WT-11705 for all details like 3C's, Affected Areas, Tested Scenarios, etc. CC: Amruta Lohiya Gaurav Sodani
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Labels Standard_Report Sprint_43
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Summary CLONE - SBM - Rejection Report - Scheduled this report - no record pulled SBM - Rejection Report - Scheduled this report - no record pulled
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            parmeshwar.jumbad Parmeshwar Jumbad (Inactive) made changes -
            Assignee Parmeshwar Jumbad [ parmeshwar.jumbade ] Sachin Hingole [ sachin.hingole ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Assignee Sachin Hingole [ sachin.hingole ] Venkatesh Pujari [ venkatesh.pujari ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            Hide
            venkatesh.pujari Venkatesh Pujari (Inactive) added a comment -

            Hi [~parmeshwar.jumbade],

            Tested this fix on CodeMap on For QA KinderCare company . Below are the scenarios tested :-
            1. Verified report save functionality (i.e. Add/Edit) for Standard,Dynamic and Static Reports
            2. Verified report clone functionality for for Standard,Dynamic and Static Reports
            3. Checked report save (i.e. Add/Edit) with & without different special characters in report name for Standard,Dynamic and Static Reports
            4. Checked report clone functionality with & without different special characters in report name for Standard,Dynamic and Static Reports

            Please note that schedule functionality is not tested on Codemap as it is not configured. We will test schedule functionality on Preprod.

            Sachin Hingole,Khandu Kshirsagar

            Thanks,
            Venkatesh

            Show
            venkatesh.pujari Venkatesh Pujari (Inactive) added a comment - Hi [~parmeshwar.jumbade] , Tested this fix on CodeMap on For QA KinderCare company . Below are the scenarios tested :- 1. Verified report save functionality (i.e. Add/Edit) for Standard,Dynamic and Static Reports 2. Verified report clone functionality for for Standard,Dynamic and Static Reports 3. Checked report save (i.e. Add/Edit) with & without different special characters in report name for Standard,Dynamic and Static Reports 4. Checked report clone functionality with & without different special characters in report name for Standard,Dynamic and Static Reports Please note that schedule functionality is not tested on Codemap as it is not configured. We will test schedule functionality on Preprod. Sachin Hingole , Khandu Kshirsagar Thanks, Venkatesh
            venkatesh.pujari Venkatesh Pujari (Inactive) logged work - 09/Feb/18 12:15 PM
            • Time Spent:
              4h
               

              Testing on Codemap

            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Environment Production [ 18442 ] Others [ 18445 ]
            Original Estimate 0h [ 0 ] 4h [ 14400 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Time Spent 4h [ 14400 ]
            Worklog Id 104016 [ 104016 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            Hide
            venkatesh.pujari Venkatesh Pujari (Inactive) added a comment -

            Hi [~parmeshwar.jumbade],

            Tested this fix on Production on City of Bellevue for hspl company . Below are the scenarios tested :-
            1. Verified report save functionality (i.e. Add/Edit) for Standard,Dynamic and Static Reports
            2. Verified report clone functionality for for Standard,Dynamic and Static Reports
            3. Checked report save (i.e. Add/Edit) with & without different special characters in report name for Standard,Dynamic and Static Reports
            4. Checked report clone functionality with & without different special characters in report name for Standard,Dynamic and Static Reports

            Sachin Hingole

            Thanks,
            Venkatesh

            Show
            venkatesh.pujari Venkatesh Pujari (Inactive) added a comment - Hi [~parmeshwar.jumbade] , Tested this fix on Production on City of Bellevue for hspl company . Below are the scenarios tested :- 1. Verified report save functionality (i.e. Add/Edit) for Standard,Dynamic and Static Reports 2. Verified report clone functionality for for Standard,Dynamic and Static Reports 3. Checked report save (i.e. Add/Edit) with & without different special characters in report name for Standard,Dynamic and Static Reports 4. Checked report clone functionality with & without different special characters in report name for Standard,Dynamic and Static Reports Sachin Hingole Thanks, Venkatesh
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) made changes -
            Time Spent 4h [ 14400 ] 5h [ 18000 ]
            Worklog Id 107046 [ 107046 ]
            venkatesh.pujari Venkatesh Pujari (Inactive) logged work - 05/Mar/18 06:57 PM
            • Time Spent:
              1h
               
              <No comment>
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status Closed [ 6 ] Resolution Setting [ 11616 ]
            Transition Time In Source Status Execution Times
            Parmeshwar Jumbad (Inactive) made transition -
            Open In Development
            1m 9s 1
            Sachin Hingole (Inactive) made transition -
            In Development In LB Testing
            2h 48m 1
            Venkatesh Pujari (Inactive) made transition -
            In LB Testing Stage Testing
            4d 1h 20m 1
            Venkatesh Pujari (Inactive) made transition -
            Stage Testing In Production Testing
            19d 20h 7m 1
            Venkatesh Pujari (Inactive) made transition -
            In Production Testing Production Complete
            41m 4s 1
            Venkatesh Pujari (Inactive) made transition -
            Production Complete Closed
            4s 1
            Sachin Hingole (Inactive) made transition -
            Closed Resolution Setting
            51d 19h 17m 1

              People

              Assignee:
              venkatesh.pujari Venkatesh Pujari (Inactive)
              Reporter:
              parmeshwar.jumbad Parmeshwar Jumbad (Inactive)
              Developer:
              Harshada Borole (Inactive)
              QA:
              Venkatesh Pujari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Production Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 4h Original Estimate - 4h
                  4h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 5h
                  5h