Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-640

TSR Integration->Add Employee->Payroll Schedule is not considering "Bi-Weekly", "53 Weekly" values as a valid input.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Module:
      TSR
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q1

      Description

      1. Launch the Postman app.
      2. Select “Post” request from dropdwon.
      3. Select authorization type as “Basic Auth”.
      4. Enter valid User ID and Password.
      5. Enter below URL:
      http://10.0.2.120/api/employee/addEmployeeTour
      6. Pass the require parameter using body. (Mentioned PayrollSchedule as Bi-Weekly or 53 Weekly)
      7. Click on "Send" button.

      Actual Result:
      Below validation message gets display:
      Parameter payrollSchedule can contain alphabets only
      Expected Result:
      Employee should be get added without any error.
      Refer attached screenshot for more details.

      Cc: Saurabh Sablaka, Prasad Pise

        Attachments

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Field Original Value New Value
            Link This issue relates to NF-180 [ NF-180 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Attachment PayrollSchedule.JPG [ 42852 ]
            Hide
            rupesh.mandal Rupesh Mandal (Inactive) added a comment -

            PayrollSchedule can contain now hyphen and alphanumeric characters

            Show
            rupesh.mandal Rupesh Mandal (Inactive) added a comment - PayrollSchedule can contain now hyphen and alphanumeric characters
            rupesh.mandal Rupesh Mandal (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            rupesh.mandal Rupesh Mandal (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            rupesh.mandal Rupesh Mandal (Inactive) made changes -
            Code Reviewed By Saurabh Sablaka [ 11909 ]
            rupesh.mandal Rupesh Mandal (Inactive) made changes -
            Code Review Date 22/Mar/2017
            rupesh.mandal Rupesh Mandal (Inactive) made changes -
            Assignee Rupesh Mandal [ rupesh.mandal ] Kunal Kedari [ kunal.kedari ]
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            We have verified fix on Local (wt-stage) , now Payroll Schedule is considering "Bi-Weekly", "53 Weekly" values as a valid input.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - We have verified fix on Local (wt-stage) , now Payroll Schedule is considering "Bi-Weekly", "53 Weekly" values as a valid input.
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Unresolved [ 10200 ]
            Status Stage Testing [ 10201 ] Reopen in Stage [ 10023 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Assignee Kunal Kedari [ kunal.kedari ] Rupesh Mandal [ rupesh.mandal ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Re-open(10216)
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Hi Rupesh Mandal,

            While verifying fix on Stage we have observed Payroll Schedule is not considering "Bi Weekly" as a valid input.

            Cc: Saurabh Sablaka, Prasad Pise

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Hi Rupesh Mandal , While verifying fix on Stage we have observed Payroll Schedule is not considering "Bi Weekly" as a valid input. Cc: Saurabh Sablaka , Prasad Pise
            Hide
            saurabh.sablaka Saurabh Sablaka (Inactive) added a comment -

            This is fixed, please verify on Stage

            Show
            saurabh.sablaka Saurabh Sablaka (Inactive) added a comment - This is fixed, please verify on Stage
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Assignee Rupesh Mandal [ rupesh.mandal ] Saurabh Sablaka [ saurabh.sablaka ]
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Status Reopen in Stage [ 10023 ] In Development [ 10007 ]
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Assignee Saurabh Sablaka [ saurabh.sablaka ] Kunal Kedari [ kunal.kedari ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Stage, "Bi Weekly" is considered as a valid input. Marking fix as "Production Deployment On Hold"

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Stage, "Bi Weekly" is considered as a valid input. Marking fix as "Production Deployment On Hold"
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Re-open(10216) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Unresolved [ 10200 ] Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Transition Time In Source Status Execution Times
            Rupesh Mandal (Inactive) made transition -
            Open In Development
            14h 58m 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing Reopened in Stage
            4s 1
            Saurabh Sablaka (Inactive) made transition -
            Reopened in Stage In Development
            3h 36m 1
            Saurabh Sablaka (Inactive) made transition -
            In Development In LB Testing
            1d 2h 11m 2
            Saurabh Sablaka (Inactive) made transition -
            In LB Testing Stage Testing
            1d 1h 40m 2
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            93d 17h 22m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            7s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            2h 21m 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date: