Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-865

I9 section 3 >> Validation messages not displayed though no data entered in fields.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Module:
      OnBoard
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      Validation messages should be displayed for below fields on Save button while these are empty:

      1. Last Name and First Name
      2. Date of rehire. (While List A and List B document not selected)
      3. Document Number and Expiration Date in List A and List B. (While Document Title is selected)
      4. Name of Employer and Authorized Representative

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Swapnil Pandhare (Inactive) made transition -
            Open Resolved
            3d 17h 9m 1
            Swapnil Pandhare (Inactive) made transition -
            Resolved Reopen
            4h 45m 1
            Swapnil Pandhare (Inactive) made transition -
            Reopen In Development
            31s 1
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Reopen in Local
            5h 27m 1
            Shubhangi Jadhav (Inactive) made transition -
            Reopen in Local In Development
            7d 18h 52m 1
            Rajendra Joshi (Inactive) made transition -
            In Development In LB Testing
            7d 13m 2
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Stage Testing
            12d 20h 14m 1
            Rajendra Joshi (Inactive) made transition -
            Stage Testing In Production Testing
            2d 6h 13m 1
            Rajendra Joshi (Inactive) made transition -
            In Production Testing Production Complete
            3d 23h 28m 1
            Rajendra Joshi (Inactive) made transition -
            Production Complete Closed
            54s 1

              People

              Assignee:
              rajendraj Rajendra Joshi (Inactive)
              Reporter:
              rajendraj Rajendra Joshi (Inactive)
              Developer:
              Shubhangi Jadhav (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0h
                  0h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 19h 25m
                  19h 25m