Uploaded image for project: 'Workterra BenAdmin'
  1. Workterra BenAdmin
  2. WB-758

Charly's email broadcast - multiple batch processing issue with attachment

    Details

    • Environment:
      Production
    • Categories:
      EDS - Email Communication
    • Company:
      Charleys Concrete
    • Reported by:
      Harbinger

      Description

      Emails failing for multiple batches with attachments

      CC : Satya Gaurav Sodani

        Attachments

          Issue Links

            Activity

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 21/Nov/17 04:53 PM
            • Time Spent:
              6h
               

              Analysis, Code fix , Discussion

            swapnil.pandhare Swapnil Pandhare (Inactive) created issue -
            jayshree.nagpure Jayshree Nagpure (Inactive) made changes -
            Field Original Value New Value
            Assignee Swapnil Pandhare [ swapnil.pandhare ] Jayshree Nagpure [ jayshree.nagpure ]
            jayshree.nagpure Jayshree Nagpure (Inactive) made changes -
            Assignee Jayshree Nagpure [ jayshree.nagpure ] Swapnil Pandhare [ swapnil.pandhare ]
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            Hi Satya

            Please find 3Cs below :

            Concern : Email broadcast failed if file attachment is there.

            Cause : In email broadcast , batches are created for sending emails. For sending emails, generic function is used(SendEmailNotification) which deletes attachments after sending email. This function is used for email categories. For first batch, emails are sent successfully with attachment. In case of email broadcast, after sending email for first batch, attachments are deleted . For subsequent batches, it doesn’t get attachment and subsequent batches are failed.

            Correction : We have added a condition that it should not delete attachment in case of email broadcast after first batch.

            Thanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - Hi Satya Please find 3Cs below : Concern : Email broadcast failed if file attachment is there. Cause : In email broadcast , batches are created for sending emails. For sending emails, generic function is used(SendEmailNotification) which deletes attachments after sending email. This function is used for email categories. For first batch, emails are sent successfully with attachment. In case of email broadcast, after sending email for first batch, attachments are deleted . For subsequent batches, it doesn’t get attachment and subsequent batches are failed. Correction : We have added a condition that it should not delete attachment in case of email broadcast after first batch. Thanks, Swapnil P.
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Description
            Emails failing for multiple batches with attachments

            CC : [~satyap]
            Emails failing for multiple batches with attachments

            CC : [~satyap] [~gaurav.sodani]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Remaining Estimate 16h [ 57600 ] 10h [ 36000 ]
            Time Spent 6h [ 21600 ]
            Worklog Id 92255 [ 92255 ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Sprint WT Sprint 41 - Bugs [ 95 ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Dev Due Date 22/Nov/2017 06/Dec/2017
            Dev Estimates 24
            Developer Jyotibala Pardeshi [ jyotibala ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Assignee Swapnil Pandhare [ swapnil.pandhare ] Jyotibala Pardeshi [ jyotibala ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Labels Email_Notifications
            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Approval status Need approval for development [ 18452 ]
            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Dev Due Date 06/Dec/2017 07/Dec/2017
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Sprint WT Sprint 41 - Bugs [ 95 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Deployment Approval Need approval for development [ 18452 ]
            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204)
            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Assignee Jyotibala Pardeshi [ jyotibala ] Swapnil Pandhare [ swapnil.pandhare ]
            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Developer Jyotibala Pardeshi [ jyotibala ] Swapnil Pandhare [ swapnil.pandhare ]
            satyap Satya made changes -
            Summary Charly's email broadcast Charly's email broadcast - multiple batch processing issue with attachment
            satyap Satya made changes -
            Categories Parent values: EDS(18481)Level 1 values: Email Communication(18485)
            Component/s BenAdmin [ 10000 ]
            Key WT-12273 WB-758
            Project WORKTERRA [ 10000 ] Workterra BenAdmin [ 11501 ]
            Workflow WT_Defects [ 58292 ] 2203 WB: Bugs Project Management Workflow [ 67683 ]
            satyap Satya made changes -
            Sprint WB - Sprint 46 [ 104 ]
            satyap Satya made changes -
            Rank Ranked lower
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Assignee Swapnil Pandhare [ swapnil.pandhare ] Pratap Patil [ pratap.patil ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Dev Due Date 07/Dec/2017 06/Apr/2018
            pratap.patil Pratap Patil (Inactive) made changes -
            Developer Swapnil Pandhare [ swapnil.pandhare ] Pratap Patil [ pratap.patil ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            QA Sanjana Jadhav [ sanjana.jadhav ]
            QA Estimates 16
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 04/Apr/18 05:29 AM
            • Time Spent:
              1.5h
               

              Analysis
              Test case writing
              Internal discussion

            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Hi,

            Please refer attached test cases:
            WT_Sprint-46_WB_758_Sanjanajadhav.xls

            Thanks,
            Sanjana Jadhav

            CC: Prasad Pise Rakesh Roy Pratap Patil

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Hi, Please refer attached test cases: WT_Sprint-46_WB_758_Sanjanajadhav.xls Thanks, Sanjana Jadhav CC: Prasad Pise Rakesh Roy Pratap Patil
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Remaining Estimate 10h [ 36000 ] 8.5h [ 30600 ]
            Time Spent 6h [ 21600 ] 7.5h [ 27000 ]
            Worklog Id 111373 [ 111373 ]
            pratap.patil Pratap Patil (Inactive) logged work - 04/Apr/18 06:40 AM
            • Time Spent:
              8h
               

              Code Correction and uni testing 

            pratap.patil Pratap Patil (Inactive) logged work - 05/Apr/18 06:40 AM
            • Time Spent:
              8h
               

              Code Correction and uni testing 

            prasadp Prasad Pise (Inactive) logged work - 05/Apr/18 06:53 PM
            • Time Spent:
              0.5h
               

              Test Cases Review

            pratap.patil Pratap Patil (Inactive) made changes -
            Dev Due Date 06/Apr/2018 09/Apr/2018
            Prashant.samal Prashant Samal (Inactive) made changes -
            Workflow 2203 WB: Bugs Project Management Workflow [ 67683 ] 0604 Issues Management Workflow [ 68200 ]
            pratap.patil Pratap Patil (Inactive) logged work - 06/Apr/18 06:28 AM
            • Time Spent:
              4h
               
              • Code correction and unit testing.
            Hide
            prasadp Prasad Pise (Inactive) added a comment -

            HI Sanjana Jadhav

            Test Cases Review Comments

            Please add test cases for multiple batch scenarios, like verification of email with attachment for Batch 1, Batch 2, ....

             

            CC Rakesh Roy Hrishikesh Deshpande Sachin Hingole

            Show
            prasadp Prasad Pise (Inactive) added a comment - HI Sanjana Jadhav Test Cases Review Comments Please add test cases for multiple batch scenarios, like verification of email with attachment for Batch 1, Batch 2, ....   CC Rakesh Roy Hrishikesh Deshpande Sachin Hingole
            prasadp Prasad Pise (Inactive) made changes -
            Remaining Estimate 8.5h [ 30600 ] 8h [ 28800 ]
            Time Spent 7.5h [ 27000 ] 8h [ 28800 ]
            Worklog Id 111652 [ 111652 ]
            pratap.patil Pratap Patil (Inactive) logged work - 09/Apr/18 06:27 AM
            • Time Spent:
              4h
               

              Test case testing . 

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 10/Apr/18 01:42 AM
            • Time Spent:
              1h
               

              Code review and discussion

            pratap.patil Pratap Patil (Inactive) made changes -
            Link This issue duplicates WB-672 [ WB-672 ]
            pratap.patil Pratap Patil (Inactive) logged work - 10/Apr/18 02:31 AM
            • Time Spent:
              5h
               
              • Code Correction (for WB-672 scenario)
              • Unit Testing .
            pratap.patil Pratap Patil (Inactive) made changes -
            Code Reviewed By Swapnil Pandhare [ 11900 ]
            Dev Due Date 09/Apr/2018 10/Apr/2018
            ashwin.wankhede Ashwin Wankhede (Inactive) made changes -
            Assignee Pratap Patil [ pratap.patil ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            Status In Development [ 10007 ] LB Deployed [ 11600 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Hrishikesh Deshpande [ hrishikesh.deshpande ] Sanjana Jadhav [ sanjana.jadhav ]
            Status LB Deployed [ 11600 ] In LB Testing [ 10200 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Remaining Estimate 8h [ 28800 ] 4h [ 14400 ]
            Time Spent 8h [ 28800 ] 12h [ 43200 ]
            Worklog Id 111940 [ 111940 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Remaining Estimate 4h [ 14400 ] 0h [ 0 ]
            Time Spent 12h [ 43200 ] 16h [ 57600 ]
            Worklog Id 111941 [ 111941 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Attachment server error.png [ 76150 ]
            Attachment error log.txt [ 76149 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Hi Pratap Patil

            Verified on LB.
            Company: For QA-CHMC-Azure

            Verified all attached test cases.Following scenarios failed:
            Do not select login status and enter all other mandatory fields
            Click on send
            Actual result: Getting server error
            PFA,
            error log.txt
            Hence reopening this issue

            Thanks,
            Sanjana Jadhav

            CC: Prasad Pise Sachin Hingole Rakesh Roy

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Hi Pratap Patil Verified on LB. Company: For QA-CHMC-Azure Verified all attached test cases.Following scenarios failed: Do not select login status and enter all other mandatory fields Click on send Actual result: Getting server error PFA, error log.txt Hence reopening this issue Thanks, Sanjana Jadhav CC: Prasad Pise Sachin Hingole Rakesh Roy
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Assignee Sanjana Jadhav [ sanjana.jadhav ] Pratap Patil [ pratap.patil ]
            Status In LB Testing [ 10200 ] REOPENED IN LB [ 11602 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 11/Apr/18 01:27 AM
            • Time Spent:
              2h
               

              Testing
              Internal discussion

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 16h [ 57600 ] 18h [ 64800 ]
            Worklog Id 112043 [ 112043 ]
            pratap.patil Pratap Patil (Inactive) logged work - 11/Apr/18 06:43 AM - edited
            • Time Spent:
              7h
               

              Code correction and unit testing for WB-672

            Hide
            pratap.patil Pratap Patil (Inactive) added a comment -

            Hi Sanjana Jadhav ,

            Login Status will be selected by default . Scenario of deselecting the Login status was not mentioned in test cases , so this Jira can not be reopened. Please create different Jira for failed scenario. 

            Thanks,
            Pratap Patil

             

            CC: Swapnil Pandhare 

            Show
            pratap.patil Pratap Patil (Inactive) added a comment - Hi Sanjana Jadhav , Login Status will be selected by default . Scenario of deselecting the Login status was not mentioned in test cases , so this Jira can not be reopened. Please create different Jira for failed scenario.  Thanks, Pratap Patil   CC: Swapnil Pandhare  
            pratap.patil Pratap Patil (Inactive) made changes -
            Assignee Pratap Patil [ pratap.patil ] Sanjana Jadhav [ sanjana.jadhav ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Link This issue relates to WB-867 [ WB-867 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status REOPENED IN LB [ 11602 ] In Development [ 10007 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            As per discussion, this issue can not be reopened as failed scenario was not mentioned in test cases.
            Hence created another jira for failed scenario. Please refer jira ID WB-867 for same.
            Hence marking this jira status as ready for Pre production.

            Thanks,
            Sanjana Jadhav

            CC: Prasad Pise Sachin Hingole Rakesh Roy

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - As per discussion, this issue can not be reopened as failed scenario was not mentioned in test cases. Hence created another jira for failed scenario. Please refer jira ID WB-867 for same. Hence marking this jira status as ready for Pre production. Thanks, Sanjana Jadhav CC: Prasad Pise Sachin Hingole Rakesh Roy
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status In Development [ 10007 ] LB Deployed [ 11600 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status LB Deployed [ 11600 ] In LB Testing [ 10200 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 18h [ 64800 ] 18.5h [ 66600 ]
            Worklog Id 112142 [ 112142 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status In LB Testing [ 10200 ] Ready for Pre-Prod [ 11615 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 18.5h [ 66600 ] 18.8h [ 67680 ]
            Worklog Id 112142 [ 112142 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 12/Apr/18 11:01 PM - edited
            • Time Spent:
              0.8h
               

              Log issue
              Jira update
              Internal discussion
              Test case execution

            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Status Ready for Pre-Prod [ 11615 ] Pre-Prod Deployed [ 11601 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Pre-Prod Deployed [ 11601 ] IN Pre-prod Testing [ 11500 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Verified on Pre production.
            Company: Barrow For HSPL
            Verified all attached test cases.Working as expected.

            Thanks,
            Sanjana Jadhav

            CC: Prasad Pise Sachin Hingole Rakesh Roy

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Verified on Pre production. Company: Barrow For HSPL Verified all attached test cases.Working as expected. Thanks, Sanjana Jadhav CC: Prasad Pise Sachin Hingole Rakesh Roy
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 19/Apr/18 04:29 AM
            • Time Spent:
              2h
               

              Pre production testing

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 18.8h [ 67680 ] 20.8h [ 74880 ]
            Worklog Id 112950 [ 112950 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status IN Pre-prod Testing [ 11500 ] Ready for Production [ 10024 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Status Ready for Production [ 10024 ] Production Deployed [ 10025 ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Time Spent 20.8h [ 74880 ] 21.8h [ 78480 ]
            Worklog Id 113246 [ 113246 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Production Deployed [ 10025 ] In Production Testing [ 10202 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - - edited

            Verified on Production.
            Company: Parkview Medical Center For HSPL
            Verified all attached test cases.Working as expected.Hence closing this issue.

            Thanks,
            Sanjana Jadhav

            CC: Prasad Pise Sachin Hingole Rakesh Roy

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - - edited Verified on Production. Company: Parkview Medical Center For HSPL Verified all attached test cases.Working as expected.Hence closing this issue. Thanks, Sanjana Jadhav CC: Prasad Pise Sachin Hingole Rakesh Roy
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 23/Apr/18 03:12 AM
            • Time Spent:
              1.3h
               

              Production testing
              Jira update
              Update in test link

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 21.8h [ 78480 ] 23.1h [ 83160 ]
            Worklog Id 113281 [ 113281 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status In Production Testing [ 10202 ] In Production Review [ 11501 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status In Production Review [ 11501 ] Closed [ 6 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Time Spent 23.1h [ 83160 ] 28.1h [ 101160 ]
            Worklog Id 113734 [ 113734 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Time Spent 28.1h [ 101160 ] 36.1h [ 129960 ]
            Worklog Id 113876 [ 113876 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Time Spent 36.1h [ 129960 ] 44.1h [ 158760 ]
            Worklog Id 113877 [ 113877 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Time Spent 44.1h [ 158760 ] 51.1h [ 183960 ]
            Worklog Id 113878 [ 113878 ]
            pratap.patil Pratap Patil (Inactive) made changes -
            Worklog Id 113878 [ 113878 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Root Cause Design Error [ 19001 ]
            Transition Time In Source Status Execution Times
            Jyotibala Pardeshi (Inactive) made transition -
            Open In Development
            11d 22h 51m 1
            Sanjana Jadhav (Inactive) made transition -
            In LB Testing REOPENED IN LB
            19h 9m 1
            Sanjana Jadhav (Inactive) made transition -
            REOPENED IN LB In Development
            22h 30m 1
            Sanjana Jadhav (Inactive) made transition -
            In Development LB Deployed
            126d 21h 38m 2
            Sanjana Jadhav (Inactive) made transition -
            LB Deployed In LB Testing
            1h 31m 2
            Sanjana Jadhav (Inactive) made transition -
            In LB Testing Ready for Pre-Prod
            56s 1
            Khandu Kshirsagar (Inactive) made transition -
            Ready for Pre-Prod Pre-Prod Deployed
            6d 1h 43m 1
            Sanjana Jadhav (Inactive) made transition -
            Pre-Prod Deployed IN Pre-prod Testing
            21h 32m 1
            Sanjana Jadhav (Inactive) made transition -
            IN Pre-prod Testing Ready for Production
            6h 11m 1
            Khandu Kshirsagar (Inactive) made transition -
            Ready for Production Production Deployed
            3d 18h 1
            Sanjana Jadhav (Inactive) made transition -
            Production Deployed In Production Testing
            4h 4m 1
            Sanjana Jadhav (Inactive) made transition -
            In Production Testing In Production Review
            38m 47s 1
            Sanjana Jadhav (Inactive) made transition -
            In Production Review Closed
            7s 1

              People

              Assignee:
              sanjana.jadhav Sanjana Jadhav (Inactive)
              Reporter:
              swapnil.pandhare Swapnil Pandhare (Inactive)
              Developer:
              Pratap Patil (Inactive)
              QA:
              Sanjana Jadhav (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 16h Original Estimate - 16h
                  16h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 51.1h
                  51.1h