Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-11046

SSO>Chubb Selerix>Functional>Nothing happens after clicking on "Enroll" button

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      Stage
    • Bug Type:
      Functional
    • Bug Severity:
      Blocker
    • Level:
      Employee
    • Module:
      BenAdmin - SSO
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      Environment - Stage
      Company - Nexion

      1] Login to application as a employee using IE11 browser.
      (Employee Details - thspl00008/Test@12345)
      2] Employee gets OE mode after login.
      3] Navigate to "Selerix Life BenefitType" page, click on Enroll button.

      Actual Result:
      Nothing happens after clicking on Enroll button.
      Expected Result:
      Employee should be get redirect to "Selerix SSO" portal.

      Cc: Jaideep Vinchurkar, Prasad Pise

        Attachments

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            santosh.balid Santosh Balid (Inactive) made changes -
            Field Original Value New Value
            Status Open [ 1 ] In Development [ 10007 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            Hide
            santosh.balid Santosh Balid (Inactive) added a comment -

            Kunal Kedari : This has been resolved yesterday itself, you have confirmed same through email as well. Please attach that email to this ticket and close it if it is no more reproducible.

            Show
            santosh.balid Santosh Balid (Inactive) added a comment - Kunal Kedari : This has been resolved yesterday itself, you have confirmed same through email as well. Please attach that email to this ticket and close it if it is no more reproducible.
            santosh.balid Santosh Balid (Inactive) made changes -
            Assignee Santosh Balid [ santosh.balid ] Kunal Kedari [ kunal.kedari ]
            santosh.balid Santosh Balid (Inactive) logged work - 13/Sep/17 06:51 AM
            • Time Spent:
              1.5h
               
              <No comment>
            santosh.balid Santosh Balid (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 1.5h [ 5400 ]
            Worklog Id 78400 [ 78400 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            We have verified the fix on Stage and Production, Working as expected, hence closing.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - We have verified the fix on Stage and Production, Working as expected, hence closing.
            santosh.balid Santosh Balid (Inactive) made changes -
            Link This issue relates to WT-9614 [ WT-9614 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            satyap Satya made changes -
            Environment_New Stage [ 18443 ]
            Transition Time In Source Status Execution Times
            Santosh Balid (Inactive) made transition -
            Open In Development
            23h 51m 1
            Santosh Balid (Inactive) made transition -
            In Development In LB Testing
            16s 1
            Santosh Balid (Inactive) made transition -
            In LB Testing Stage Testing
            8s 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            11d 22h 30m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            7s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            2s 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              Developer:
              Santosh Balid (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1.5h
                  1.5h