Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-11079

SSO>Chubb Selerix>Functional>Remove the plan links from Selerix welcome page for which employee opted not to enroll

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      Stage
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Level:
      Employee
    • Module:
      BenAdmin - SSO
    • Reported by:
      Harbinger
    • Browser:
      IE 11

      Description

      Environment - Stage
      Company - Nexion

      1] Login to application as a employee.
      2] Employee gets OE mode after login.
      3] Navigate to "Selerix Life BenefitType" page, click on Enroll button.
      4] Employee redirects to Selerix Home page.
      5] Observe the links displaying in top right corner.

      Actual Result:
      Other links which employee opted not to enroll are displaying, using which employee can enroll.
      Expected Result:
      Other links which employee opted not to enroll are displaying, using which employee can enroll.

      Refer attached screenshot for more details.
      Cc: Prasad Pise, Jaideep Vinchurkar, Aditya Vishwakarma

        Attachments

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            santosh.balid Santosh Balid (Inactive) made changes -
            Field Original Value New Value
            Status Open [ 1 ] In Development [ 10007 ]
            Hide
            santosh.balid Santosh Balid (Inactive) added a comment -

            Selerix/CHUBB Team needs to look into it.

            Show
            santosh.balid Santosh Balid (Inactive) added a comment - Selerix/CHUBB Team needs to look into it.
            santosh.balid Santosh Balid (Inactive) logged work - 18/Sep/17 01:47 PM
            • Time Spent:
              1h
               
              <No comment>
            santosh.balid Santosh Balid (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 1h [ 3600 ]
            Worklog Id 79337 [ 79337 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            santosh.balid Santosh Balid (Inactive) added a comment -

            This is configurable, with communication to selerix, this is fixed.

            Show
            santosh.balid Santosh Balid (Inactive) added a comment - This is configurable, with communication to selerix, this is fixed.
            santosh.balid Santosh Balid (Inactive) made changes -
            Assignee Santosh Balid [ santosh.balid ] Kunal Kedari [ kunal.kedari ]
            Resolution System Behaviour [ 10100 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            santosh.balid Santosh Balid (Inactive) made changes -
            Link This issue relates to WT-9614 [ WT-9614 ]
            prasadp Prasad Pise (Inactive) made changes -
            Resolution System Behaviour [ 10100 ] Fixed [ 1 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            satyap Satya made changes -
            Environment_New Stage [ 18443 ]
            Transition Time In Source Status Execution Times
            Santosh Balid (Inactive) made transition -
            Open In Development
            23h 15m 1
            Santosh Balid (Inactive) made transition -
            In Development In LB Testing
            4d 4h 7m 1
            Santosh Balid (Inactive) made transition -
            In LB Testing Stage Testing
            32s 1
            Santosh Balid (Inactive) made transition -
            Stage Testing In Production Testing
            3s 1
            Santosh Balid (Inactive) made transition -
            In Production Testing Production Complete
            57s 1
            Prasad Pise (Inactive) made transition -
            Production Complete Closed
            7d 1h 7m 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              Developer:
              Santosh Balid (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1h
                  1h