Uploaded image for project: 'Document Management System'
  1. Document Management System
  2. DMS-748

DMS | Review and Sign | Reference documents grid data

    Details

    • Type: New Feature
    • Status: Done
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: Carry Over - Fall
    • Labels:
      None

      Description

      Environment: PreProd

      Review and Sign > the reference documents send through send mails should populate in reference grid

      Steps:
      1. Admin login > Send Forms
      2. Select Document > Add Action document and Reference documents both
      3. Preview > Send
      4. Candidate Login > review Forms
      5. Action document should populate in Action documents grid and
      6. Reference documents grid

      Actual: Currently, populating in Action documents grid
      Expected: Should populate in Reference grid

      Swapnil Pandhare Samir Jayshree Nagpure

        Attachments

        1. Screenshot (716).png
          154 kB
          Priya Dhamande
        2. Screenshot 2019-02-13 at 3.25.28 PM.png
          125 kB
          Mohd Belal
        3. Review and Sign Page_Post Comment_Tagoption.png
          201 kB
          Aruna Raheja
        4. Review and Sign Page (1).png
          175 kB
          Aruna Raheja
        5. Review and Sign Page_Post Comment.png
          198 kB
          Aruna Raheja
        6. ActionVsReference.png
          93 kB
          Swapnil Pandhare
        7. Screenshot (12).png
          204 kB
          Priya Dhamande
        8. Testcases -DMS-748.xls
          16 kB
          Priya Dhamande

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Priya Dhamande (Inactive) made transition -
            To Do To Do
            18h 42m 1
            Ramya Tantry (Inactive) made transition -
            To Do In Progress
            34d 3h 36m 3
            Komal Barde (Inactive) made transition -
            Code Review In Progress
            11d 19h 48m 1
            Komal Barde (Inactive) made transition -
            In Progress On Hold
            37m 51s 1
            Komal Barde (Inactive) made transition -
            On Hold In Progress
            3d 7h 34m 1
            Komal Barde (Inactive) made transition -
            In Progress Code Review
            1d 23h 46m 2
            Raj Hawaldar (Inactive) made transition -
            Code Review In QA Testing
            3d 18h 38m 1
            Priya Dhamande (Inactive) made transition -
            In QA Testing In Progress
            1d 1h 9m 2
            Komal Barde (Inactive) made transition -
            In Progress To Do
            25d 20h 44m 4
            Komal Barde (Inactive) made transition -
            To Do In QA Testing
            6d 2h 23m 2
            Priya Dhamande (Inactive) made transition -
            In QA Testing Done
            2d 7h 37m 1

              People

              Assignee:
              Robert.Malony Robert Malony (Inactive)
              Reporter:
              priya.dhamande Priya Dhamande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              8 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 30h Original Estimate - 30h
                  30h
                  Remaining:
                  Time Spent - 33h 5m Remaining Estimate - 4.5h
                  4.5h
                  Logged:
                  Time Spent - 33h 5m Remaining Estimate - 4.5h
                  33h 5m