Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-1287

Bullhorn Integration->I-9 status changed for one tour is getting reflected in other tour details as well.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Module:
      Bullhorn
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      1] Access the tour details page using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      2] Assign Onboard and Onboard Second tour. (These both tours have I-9 form as a step)
      3] Login as a employee, traverse Onboard tour, fill I-9 form details and submit it.
      4] Again access the tour details UI using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      5] Observe I-9 status for both tours.

      Actual Result:
      I-9 status reflected in both tours, though the second tour is not started. Refer attached screenshot for more details.
      Also in DB status of tour is getting changes to "In Progress" due to above scenario, but it is not getting reflected on UI, on UI status is showing as "Not Started".

      Cc: Saurabh Sablaka, Prasad Pise

        Attachments

        1. I-9_Status.JPG
          I-9_Status.JPG
          56 kB
        2. I9Statues.png
          I9Statues.png
          189 kB
        3. I9Status.png
          I9Status.png
          188 kB
        4. Pass_Stage.jpg
          Pass_Stage.jpg
          130 kB

          Issue Links

            Activity

            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Hi Kunal Kedari,

            After completing first tour I9 verification status not reflected in second tour

            CC:Saurabh Sablaka

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Hi Kunal Kedari , After completing first tour I9 verification status not reflected in second tour CC: Saurabh Sablaka
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Modified Files
            /branches/LB/DatabaseObjects/MasterCompanyDB/04_StoredProcedures/
            ob.OES_SP_GetTourStepsStatus.sql

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Modified Files /branches/LB/DatabaseObjects/MasterCompanyDB/04_StoredProcedures/ ob.OES_SP_GetTourStepsStatus.sql
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Local (wt-stage), now I-9 status from first tour is not get reflected in second tour. We can deploy fix to Stage.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Local (wt-stage), now I-9 status from first tour is not get reflected in second tour. We can deploy fix to Stage.
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified change on Stage I-9 status of one tour is not reflecting in second.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified change on Stage I-9 status of one tour is not reflecting in second.
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            As we are deploying all Bullhorn changes to Production in next week for time being marking this issue as "Production Deployment on Hold"

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - As we are deploying all Bullhorn changes to Production in next week for time being marking this issue as "Production Deployment on Hold"
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified change on Production , I-9 status of one tour is not reflecting in second. Closing the ticket.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified change on Production , I-9 status of one tour is not reflecting in second. Closing the ticket.

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 8h
                  8h
                  Remaining:
                  Time Spent - 7.25h Remaining Estimate - 0.75h
                  0.75h
                  Logged:
                  Time Spent - 7.25h Remaining Estimate - 0.75h
                  7.25h