Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-1287

Bullhorn Integration->I-9 status changed for one tour is getting reflected in other tour details as well.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Module:
      Bullhorn
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      1] Access the tour details page using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      2] Assign Onboard and Onboard Second tour. (These both tours have I-9 form as a step)
      3] Login as a employee, traverse Onboard tour, fill I-9 form details and submit it.
      4] Again access the tour details UI using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      5] Observe I-9 status for both tours.

      Actual Result:
      I-9 status reflected in both tours, though the second tour is not started. Refer attached screenshot for more details.
      Also in DB status of tour is getting changes to "In Progress" due to above scenario, but it is not getting reflected on UI, on UI status is showing as "Not Started".

      Cc: Saurabh Sablaka, Prasad Pise

        Attachments

        1. I-9_Status.JPG
          I-9_Status.JPG
          56 kB
        2. I9Statues.png
          I9Statues.png
          189 kB
        3. I9Status.png
          I9Status.png
          188 kB
        4. Pass_Stage.jpg
          Pass_Stage.jpg
          130 kB

          Issue Links

            Activity

            kunal.kedari Kunal Kedari (Inactive) created issue -
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Field Original Value New Value
            Assignee Ramya Tantry [ ramya.tantry ] Seema Gaikwad [ seema.gaikwad ]
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 04/May/17 11:33 AM - edited
            • Time Spent:
              3h
               

              Script modification
              Unit Testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 8h [ 28800 ]
            Original Estimate 8h [ 28800 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 8h [ 28800 ] 6h [ 21600 ]
            Time Spent 2h [ 7200 ]
            Worklog Id 43139 [ 43139 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Attachment I9Statues.png [ 47012 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 6h [ 21600 ] 5h [ 18000 ]
            Time Spent 2h [ 7200 ] 3h [ 10800 ]
            Worklog Id 43139 [ 43139 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Code Reviewed By Ramya Tantry [ 13001 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Code Review Date 05/May/2017
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Attachment I9Statues.png [ 47012 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Attachment I9Statues.png [ 47076 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Attachment I9Status.png [ 47077 ]
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Hi Kunal Kedari,

            After completing first tour I9 verification status not reflected in second tour

            CC:Saurabh Sablaka

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Hi Kunal Kedari , After completing first tour I9 verification status not reflected in second tour CC: Saurabh Sablaka
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 05/May/17 11:29 AM
            • Time Spent:
              1.5h
               

              Fixed issue.
              Testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 5h [ 18000 ] 3.5h [ 12600 ]
            Time Spent 3h [ 10800 ] 4.5h [ 16200 ]
            Worklog Id 43370 [ 43370 ]
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment -

            Modified Files
            /branches/LB/DatabaseObjects/MasterCompanyDB/04_StoredProcedures/
            ob.OES_SP_GetTourStepsStatus.sql

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - Modified Files /branches/LB/DatabaseObjects/MasterCompanyDB/04_StoredProcedures/ ob.OES_SP_GetTourStepsStatus.sql
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Assignee Seema Gaikwad [ seema.gaikwad ] Kunal Kedari [ kunal.kedari ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Local (wt-stage), now I-9 status from first tour is not get reflected in second tour. We can deploy fix to Stage.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Local (wt-stage), now I-9 status from first tour is not get reflected in second tour. We can deploy fix to Stage.
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Attachment Pass_Stage.jpg [ 47933 ]
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified change on Stage I-9 status of one tour is not reflecting in second.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified change on Stage I-9 status of one tour is not reflecting in second.
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            As we are deploying all Bullhorn changes to Production in next week for time being marking this issue as "Production Deployment on Hold"

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - As we are deploying all Bullhorn changes to Production in next week for time being marking this issue as "Production Deployment on Hold"
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            seema.gaikwad Seema Gaikwad (Inactive) logged work - 15/May/17 11:21 AM - edited
            • Time Spent:
              2h
               

              LB testing

            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 3.5h [ 12600 ] 2h [ 7200 ]
            Time Spent 4.5h [ 16200 ] 6h [ 21600 ]
            Worklog Id 45724 [ 45724 ]
            seema.gaikwad Seema Gaikwad (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 1.5h [ 5400 ]
            Time Spent 6h [ 21600 ] 6.5h [ 23400 ]
            Worklog Id 45724 [ 45724 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Link This issue relates to NF-948 [ NF-948 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            kunal.kedari Kunal Kedari (Inactive) logged work - 22/Jun/17 05:19 PM
            • Time Spent:
              0.75h
               

              Testing on Production

            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified change on Production , I-9 status of one tour is not reflecting in second. Closing the ticket.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified change on Production , I-9 status of one tour is not reflecting in second. Closing the ticket.
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            kunal.kedari Kunal Kedari (Inactive) made changes -
            Remaining Estimate 1.5h [ 5400 ] 0.75h [ 2700 ]
            Time Spent 6.5h [ 23400 ] 7.25h [ 26100 ]
            Worklog Id 59038 [ 59038 ]
            Transition Time In Source Status Execution Times
            Seema Gaikwad (Inactive) made transition -
            Open In Development
            22h 26m 1
            Kunal Kedari (Inactive) made transition -
            In Development In LB Testing
            4d 16m 1
            Kunal Kedari (Inactive) made transition -
            In LB Testing Stage Testing
            3d 6h 51m 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            41d 17h 20m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            5s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            3s 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 8h
                  8h
                  Remaining:
                  Time Spent - 7.25h Remaining Estimate - 0.75h
                  0.75h
                  Logged:
                  Time Spent - 7.25h Remaining Estimate - 0.75h
                  7.25h