Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-1289

Bullhorn Integration->I-9 verification steps is displaying for two times after completing the assigned tours.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Bug Type:
      Functional
    • Module:
      Bullhorn
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      1] Access the tour details page using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      2] Assign Onboard and Onboard Second tour. (These both tours have I-9 form as a step)
      3] Login as a employee, traverse both tours, fill I-9 form details and submit it.
      4] Again access the tour details UI using below URL:
      https://10.0.2.120/api/app/TourListing/ListTours?requestFrom=wRnQ7Y%2fZWlCOXjmz9IS4jw%3d%3d&userName=%2bsj2KXYNrgm8O4Va%2bHPUTQ%3d%3d&password=T6NiPfpN8kLQSGDeUamNAw%3d%3d&corporationID=9587&entityType=Placement&entityID=3
      5] Observe I-9 status for both tours.

      Actual Result:
      I-9 status is displaying for two times. (Refer attached screenshot for more details)

      Cc; Saurabh Sablaka, Prasad Pise, Ramya Tantry

        Attachments

        1. I-9 Status.JPG
          110 kB
          Kunal Kedari
        2. LBReopen_16May2017.jpg
          157 kB
          Kunal Kedari
        3. MultipleSteps.JPG
          80 kB
          Kunal Kedari
        4. SameStepMultipleTimes.JPG
          87 kB
          Kunal Kedari

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Seema Gaikwad (Inactive) made transition -
            Open In Development
            6d 1h 46m 1
            Kunal Kedari (Inactive) made transition -
            In LB Testing Reopen in Local
            6d 3h 15m 1
            Seema Gaikwad (Inactive) made transition -
            Reopen in Local In Development
            17h 41m 1
            Kunal Kedari (Inactive) made transition -
            In Development In LB Testing
            13d 3m 2
            Kunal Kedari (Inactive) made transition -
            In LB Testing Stage Testing
            3s 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            23d 23h 12m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            7s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            7d 1h 46m 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 15h Original Estimate - 15h
                  15h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 18.5h
                  18.5h