Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-24

OnBoard - I-9 issues mentioned in I-9 standalone enhancement

    Details

    • Type: Enhancement
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: I9 Stand Alone
    • Labels:
      None
    • Module:
      I9 Stand Alone
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q1
    • Sprint:
      NF Sprint 2
    • Severity:
      Medium

      Description

      1] UI Disturbs in I-9 Form through partner login - Section 2
      2] For SA Login at employee level- Tour Progress widget is displayed even without going inside OnBoard Module. It should be visisble only when admin is inside OnBoard module
      3] 4 fields in Alien Registration number should be resized
      4] Design of List B & C document to be aligned
      5] Localization issue on E-verify case status
      6] Validation to be put for List A or (B And C) part as per new design
      7] Sequence of Documents in List A to be refined

        Attachments

        1. 1.png
          1.png
          218 kB
        2. 2.png
          2.png
          172 kB
        3. 3.png
          3.png
          255 kB
        4. 4.png
          4.png
          264 kB
        5. 5.png
          5.png
          271 kB
        6. 6.png
          6.png
          233 kB
        7. 7.png
          7.png
          233 kB
        8. 8.png
          8.png
          194 kB
        9. Everify status issue.png
          Everify status issue.png
          30 kB
        10. I-9 standalone issues.xlsx
          10 kB

          Issue Links

            Activity

            Hide
            sachin.hingole Sachin Hingole (Inactive) added a comment -

            Hi Rajendra Joshi,

            Please check issues mentioned in this JRIA,
            Make sure, you are maintaining TC status in TestLink too.

            Thanks,
            Sachin HIngole

            Show
            sachin.hingole Sachin Hingole (Inactive) added a comment - Hi Rajendra Joshi , Please check issues mentioned in this JRIA, Make sure, you are maintaining TC status in TestLink too. Thanks, Sachin HIngole
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified on LB using company city of lake worth. Below issues observed :

            Issues observed while managing employees:
            1. E-verify graphics and logo are overlapping the line. Those should be moved up. PFA 1.png
            2. All fields are displayed onLoad, for section I. Here, related fields should be displayed after selecting options only. PFA 2.png
            3. Field 'Reason for Return' is displayed for every employee. PFA 3.png
            4. In section 2, under 'Issuing Authority' field, error message 'Please enter valid Zip Code' is displayed. PFA 4.png
            5. Though mandatory fields are empty in section I, error message '...Can not be blank' not displayed for Last Name, First Name, Date of Birth fields on save button. PFA 5.png
            6. Error messages remains even after changing values from dropdown. PFA 6.png
            7. In section 2, under 'Card Number' field, error message 'Form I-94 Admission Number Invalid' is displayed. PFA 7.png

            Issues observed in employee login:
            8. Instruction text is missing for second option 'A noncitizen national of the United States (See instructions)'. PFA 8.png

            Suggestion:
            9. In employee login, Provide instruction text for all Radio options on user rollover/click, as it is given in PDF. This will be useful for employees.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified on LB using company city of lake worth. Below issues observed : Issues observed while managing employees: 1. E-verify graphics and logo are overlapping the line. Those should be moved up. PFA 1.png 2. All fields are displayed onLoad, for section I. Here, related fields should be displayed after selecting options only. PFA 2.png 3. Field 'Reason for Return' is displayed for every employee. PFA 3.png 4. In section 2, under 'Issuing Authority' field, error message 'Please enter valid Zip Code' is displayed. PFA 4.png 5. Though mandatory fields are empty in section I, error message '...Can not be blank' not displayed for Last Name, First Name, Date of Birth fields on save button. PFA 5.png 6. Error messages remains even after changing values from dropdown. PFA 6.png 7. In section 2, under 'Card Number' field, error message 'Form I-94 Admission Number Invalid' is displayed. PFA 7.png Issues observed in employee login: 8. Instruction text is missing for second option 'A noncitizen national of the United States (See instructions)'. PFA 8.png Suggestion: 9. In employee login, Provide instruction text for all Radio options on user rollover/click, as it is given in PDF. This will be useful for employees.
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            CC : Sachin Hingole Rakesh Roy

            Hi Rajendra Joshi

            In this JIRA , points mentioned needs to be checked as discussed with Sachin Hingole

            Thanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - CC : Sachin Hingole Rakesh Roy Hi Rajendra Joshi In this JIRA , points mentioned needs to be checked as discussed with Sachin Hingole Thanks, Swapnil P.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited

            As per discussion with SachinH, opened JIRA WT-7663 for UI issues.
            From this JIRA, #2 and #3 are resolved. But, #1 and #4 are not resolved. Issues related to these points are are mentioned in JIRA WT-7663.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited As per discussion with SachinH, opened JIRA WT-7663 for UI issues. From this JIRA, #2 and #3 are resolved. But, #1 and #4 are not resolved. Issues related to these points are are mentioned in JIRA WT-7663 .
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            After discussion with SachinH, marking this onHold till the JIRA WT-7663 is fixed.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - After discussion with SachinH, marking this onHold till the JIRA WT-7663 is fixed.
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            CC : Sachin Hingole

            Hi Rajendra Joshi

            Can you please check #5, #6, #7 from description. Also, you can refer attached excel for completed points.

            THanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - CC : Sachin Hingole Hi Rajendra Joshi Can you please check #5, #6, #7 from description. Also, you can refer attached excel for completed points. THanks, Swapnil P.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified #5 on LB using company city of lake worth. Opened JIRA WT-7733.

            While testing #6, observed differences in PDF and the I-9 form in WT. As per Swapnil, these differences will be resolved after tomorrows patch so testing onhold now for #6 & #7. These would be tested after tomorrows patch.
            Swapnil PandhareSachin Hingole

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified #5 on LB using company city of lake worth. Opened JIRA WT-7733 . While testing #6, observed differences in PDF and the I-9 form in WT. As per Swapnil, these differences will be resolved after tomorrows patch so testing onhold now for #6 & #7. These would be tested after tomorrows patch. Swapnil Pandhare Sachin Hingole
            Hide
            niteen.surwase Niteen Surwase (Inactive) added a comment -

            Hi Rajendra Joshi

            Please note that, all above points from this Ticket has been completed on Local and it'll be on LB by tomorrow

            Cc; Swapnil Pandhare, Satya

            Thanks,
            Niteen S.

            Show
            niteen.surwase Niteen Surwase (Inactive) added a comment - Hi Rajendra Joshi Please note that, all above points from this Ticket has been completed on Local and it'll be on LB by tomorrow Cc; Swapnil Pandhare , Satya Thanks, Niteen S.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified on LB using company city of lake worth. Opened JIRA WT-7903 for newly observed issues.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified on LB using company city of lake worth. Opened JIRA WT-7903 for newly observed issues.
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            CC : Sachin Hingole

            Hi Rajendra Joshi

            Can you please let us know what is current status on mentioned points in this JIRA description?

            Thanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - CC : Sachin Hingole Hi Rajendra Joshi Can you please let us know what is current status on mentioned points in this JIRA description? Thanks, Swapnil P.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Hi @swapnil,
            In my above comments I have already mentioned that WT-7903 is opened for #6 and #7. Other Points are working as expected.
            With Best Regards
            Rajendra Joshi
            CC:Sachin Hingole

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Hi @swapnil, In my above comments I have already mentioned that WT-7903 is opened for #6 and #7. Other Points are working as expected. With Best Regards Rajendra Joshi CC: Sachin Hingole
            Hide
            sachin.hingole Sachin Hingole (Inactive) added a comment -

            Hi Niteen Surwase,

            Please assign back to Rajendra once open issues are fixed and deployed on LB.

            Thanks,
            Sachin Hingole

            Rakesh Roy Swapnil Pandhare Rajendra Joshi Hrishikesh Deshpande

            Show
            sachin.hingole Sachin Hingole (Inactive) added a comment - Hi Niteen Surwase , Please assign back to Rajendra once open issues are fixed and deployed on LB. Thanks, Sachin Hingole Rakesh Roy Swapnil Pandhare Rajendra Joshi Hrishikesh Deshpande
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Hi Niteen Surwase,

            Please mention the fixed points. Change the deployment status. And confirm the issue type. It was bug before and now its enhancement.

            With Best Regards
            Rajendra Joshi

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Hi Niteen Surwase , Please mention the fixed points. Change the deployment status. And confirm the issue type. It was bug before and now its enhancement. With Best Regards Rajendra Joshi
            Hide
            Deborah.Mascot@ebsbenefits.com Deborah Mascot (Inactive) added a comment -

            So is the I-9 working now in production?

            Show
            Deborah.Mascot@ebsbenefits.com Deborah Mascot (Inactive) added a comment - So is the I-9 working now in production?
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified on Production using company EBS Exchange. All above points are verified and working as expected.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified on Production using company EBS Exchange. All above points are verified and working as expected.

              People

              Assignee:
              rajendraj Rajendra Joshi (Inactive)
              Reporter:
              sachin.hingole Sachin Hingole (Inactive)
              Developer:
              Niteen Surwase (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              7 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 16h Original Estimate - 16h
                  16h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 36.5h
                  36.5h