Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-24

OnBoard - I-9 issues mentioned in I-9 standalone enhancement

    Details

    • Type: Enhancement
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: I9 Stand Alone
    • Labels:
      None
    • Module:
      I9 Stand Alone
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q1
    • Sprint:
      NF Sprint 2
    • Severity:
      Medium

      Description

      1] UI Disturbs in I-9 Form through partner login - Section 2
      2] For SA Login at employee level- Tour Progress widget is displayed even without going inside OnBoard Module. It should be visisble only when admin is inside OnBoard module
      3] 4 fields in Alien Registration number should be resized
      4] Design of List B & C document to be aligned
      5] Localization issue on E-verify case status
      6] Validation to be put for List A or (B And C) part as per new design
      7] Sequence of Documents in List A to be refined

        Attachments

        1. 1.png
          1.png
          218 kB
        2. 2.png
          2.png
          172 kB
        3. 3.png
          3.png
          255 kB
        4. 4.png
          4.png
          264 kB
        5. 5.png
          5.png
          271 kB
        6. 6.png
          6.png
          233 kB
        7. 7.png
          7.png
          233 kB
        8. 8.png
          8.png
          194 kB
        9. Everify status issue.png
          Everify status issue.png
          30 kB
        10. I-9 standalone issues.xlsx
          10 kB

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Niteen Surwase (Inactive) made transition -
            Open In Development
            4d 1h 28m 1
            Sachin Hingole (Inactive) made transition -
            In LB Testing Reopen in Local
            52d 18h 19m 1
            Niteen Surwase (Inactive) made transition -
            Reopen in Local In Development
            41d 22h 17m 1
            Niteen Surwase (Inactive) made transition -
            In Development In LB Testing
            4h 44m 2
            Swapnil Pandhare (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            41s 1
            Swapnil Pandhare (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            2s 1
            Swapnil Pandhare (Inactive) made transition -
            Approved for Stage Stage Testing
            2s 1
            Rajendra Joshi (Inactive) made transition -
            Stage Testing Pending for Production Approval
            3d 23h 35m 1
            Rajendra Joshi (Inactive) made transition -
            Pending for Production Approval Approved for production
            6s 1
            Rajendra Joshi (Inactive) made transition -
            Approved for production In Production Testing
            3s 1
            Rajendra Joshi (Inactive) made transition -
            In Production Testing Production Complete
            4h 15m 1

              People

              Assignee:
              rajendraj Rajendra Joshi (Inactive)
              Reporter:
              sachin.hingole Sachin Hingole (Inactive)
              Developer:
              Niteen Surwase (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              7 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 16h Original Estimate - 16h
                  16h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 36.5h
                  36.5h