Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-2830

TSR Integration->Manage Onboard Status->Already assigned tours are displaying in Assign Tour drop down after changing employee status.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Environment:
      QA
    • Bug Type:
      Functional
    • Level:
      Admin
    • Module:
      TSR
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2
    • Browser:
      Google Chrome

      Description

      1] Login the application as a admin/partner. (LB wt-stage environment)
      2] Navigate to Onboard->Manage Onboard Status page.
      3] Try to assign tour to employee for which "Available tours are already assigned to the employee." message is displaying.
      4] Now change the status of that employee. (e.g. change status from Active to COBRA or Active to Terminated)
      5] Observed the tour available for assignment of that employee on Manage OnBoard Status page.

      Actual Result:
      Already assigned tours also displaying.
      Expected Result:
      Already assigned and system eligible tours should not be display.
      Refer attached screenshot for more details.

      Cc: Saurabh Sablaka, Prasad Pise, Ramya Tantry

        Attachments

          Issue Links

            Activity

            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited

            Modified Files
            App/BusinessLogic/OnBoarding/ManageTour.cs
            Shared Library/WORKTERRALocalization/WORKTERRAResource.Designer.cs
            Shared Library/WORKTERRALocalization/WORKTERRAResource.en-GB.resx
            Shared Library/WORKTERRALocalization/WORKTERRAResource.es-mx.resx
            Shared Library/WORKTERRALocalization/WORKTERRAResource.fr-CA.resx
            Shared Library/WORKTERRALocalization/WORKTERRAResource.resx

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited Modified Files App/BusinessLogic/OnBoarding/ManageTour.cs Shared Library/WORKTERRALocalization/WORKTERRAResource.Designer.cs Shared Library/WORKTERRALocalization/WORKTERRAResource.en-GB.resx Shared Library/WORKTERRALocalization/WORKTERRAResource.es-mx.resx Shared Library/WORKTERRALocalization/WORKTERRAResource.fr-CA.resx Shared Library/WORKTERRALocalization/WORKTERRAResource.resx
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited

            Hi Kunal Kedari

            After changing employee status already assign and system eligible tours are not shown for assignment.
            For employee status cobra,retired,terminated and deceased only offboard tour is shown for assignment.
            Popup message is changed to -> No tours are available for assignment.

            CC:Saurabh Sablaka Ramya Tantry

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited Hi Kunal Kedari After changing employee status already assign and system eligible tours are not shown for assignment. For employee status cobra,retired,terminated and deceased only offboard tour is shown for assignment. Popup message is changed to -> No tours are available for assignment. CC: Saurabh Sablaka Ramya Tantry
            Hide
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited

            Cause : Already assigned tours are displaying in Assign Tour drop down after changing employee status.
            Correction : Tour displaying for assignment BL logic changed.
            Popup message changed

            Show
            seema.gaikwad Seema Gaikwad (Inactive) added a comment - - edited Cause : Already assigned tours are displaying in Assign Tour drop down after changing employee status. Correction : Tour displaying for assignment BL logic changed. Popup message changed
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            We have verified the fix on Local (wt-stage), already assigned tours are not displaying in "Assign Tours" drop down after changing employee status. We can deploy fix on Stage.

            Cc: Saurabh Sablaka, Prasad Pise

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - We have verified the fix on Local (wt-stage), already assigned tours are not displaying in "Assign Tours" drop down after changing employee status. We can deploy fix on Stage. Cc: Saurabh Sablaka , Prasad Pise
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            We have verified the fix on Stage, already assigned tours are not displaying in "Assign Tours" drop down after changing employee status. We can deploy fix on Production.

            Cc: Prasad Pise, Saurabh Sablaka

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - We have verified the fix on Stage, already assigned tours are not displaying in "Assign Tours" drop down after changing employee status. We can deploy fix on Production. Cc: Prasad Pise , Saurabh Sablaka
            Hide
            kunal.kedari Kunal Kedari (Inactive) added a comment -

            Verified fix on Production, already assigned tours are not displaying in Assign Tour drop down after changing employee status. Closing the ticket.

            Show
            kunal.kedari Kunal Kedari (Inactive) added a comment - Verified fix on Production, already assigned tours are not displaying in Assign Tour drop down after changing employee status. Closing the ticket.

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              Developer:
              Seema Gaikwad (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 10h Original Estimate - 10h
                  10h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 15.25h
                  15.25h