Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-2830

TSR Integration->Manage Onboard Status->Already assigned tours are displaying in Assign Tour drop down after changing employee status.

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Integrations
    • Labels:
      None
    • Environment:
      QA
    • Bug Type:
      Functional
    • Level:
      Admin
    • Module:
      TSR
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2
    • Browser:
      Google Chrome

      Description

      1] Login the application as a admin/partner. (LB wt-stage environment)
      2] Navigate to Onboard->Manage Onboard Status page.
      3] Try to assign tour to employee for which "Available tours are already assigned to the employee." message is displaying.
      4] Now change the status of that employee. (e.g. change status from Active to COBRA or Active to Terminated)
      5] Observed the tour available for assignment of that employee on Manage OnBoard Status page.

      Actual Result:
      Already assigned tours also displaying.
      Expected Result:
      Already assigned and system eligible tours should not be display.
      Refer attached screenshot for more details.

      Cc: Saurabh Sablaka, Prasad Pise, Ramya Tantry

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Seema Gaikwad (Inactive) made transition -
            Open In Development
            3d 10m 1
            Kunal Kedari (Inactive) made transition -
            In Development In LB Testing
            9d 22h 5m 1
            Kunal Kedari (Inactive) made transition -
            In LB Testing Stage Testing
            11d 2h 59m 1
            Kunal Kedari (Inactive) made transition -
            Stage Testing In Production Testing
            1d 16m 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            6s 1
            Kunal Kedari (Inactive) made transition -
            Production Complete Closed
            3s 1

              People

              Assignee:
              kunal.kedari Kunal Kedari (Inactive)
              Reporter:
              kunal.kedari Kunal Kedari (Inactive)
              Developer:
              Seema Gaikwad (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 10h Original Estimate - 10h
                  10h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 15.25h
                  15.25h