Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-532

Issues with 'E-Verify Case Status' report.

    Details

    • Type: Bug
    • Status: Rejected
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Environment:
      Stage
    • Module:
      OnBoard
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      In Partner login, below issues are observed with 'E-Verify Case Status' report.:

      1. All records are not displayed. Fields are empty.
      2. Column name is incorrect. Below title is observed
      'Could not find any resources appropriate for the specified culture or the neutral culture. Make sure "ReportsLocalization.Resources.resources" was correctly embedded or linked into assembly "ReportsLocalization" at compile time, or that all the satellite assemblies required are loadable and fully signed.' PFA screen shot

        Attachments

          Issue Links

            Activity

            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            Hi Shubhangi Jadhav ,

            Please check this on monday.

            Thanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - Hi Shubhangi Jadhav , Please check this on monday. Thanks, Swapnil P.
            Hide
            surender.kumar surender kumar (Inactive) added a comment - - edited

            Hi Shubhangi Jadhav,

            This issue is because of RDL inconsistent on Stage and LB branch.
            We have to make consistent in all branches.
            Please Refer WT-7545.

            Regards,
            Surender Kumar

            cc: Prasanna Karlekar, Aditya Vishwakarma

            Show
            surender.kumar surender kumar (Inactive) added a comment - - edited Hi Shubhangi Jadhav , This issue is because of RDL inconsistent on Stage and LB branch. We have to make consistent in all branches. Please Refer WT-7545 . Regards, Surender Kumar cc: Prasanna Karlekar , Aditya Vishwakarma
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified on Stage using company Long for HSPL. Above issues are resolved now.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified on Stage using company Long for HSPL. Above issues are resolved now.
            Hide
            surender.kumar surender kumar (Inactive) added a comment -

            3C:

            Concern :
            Error on E-Verify Case Status Report
            Could not find any resources appropriate for the specified culture or the neutral culture.

            Cause:
            As NF-23 is deployed only up to LB. That's why RDL was not updated on Stage.

            Correction:
            Updated RDL on Stage.

            Show
            surender.kumar surender kumar (Inactive) added a comment - 3C: Concern : Error on E-Verify Case Status Report Could not find any resources appropriate for the specified culture or the neutral culture. Cause: As NF-23 is deployed only up to LB. That's why RDL was not updated on Stage. Correction: Updated RDL on Stage.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited

            Not able to verify on production due to E-verification functionality not functioning. We require employee records with various statuses to verify report functionality. Hence, marking as on-hold.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited Not able to verify on production due to E-verification functionality not functioning. We require employee records with various statuses to verify report functionality. Hence, marking as on-hold.
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            closed

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - closed

              People

              Assignee:
              mahendra.mungase Mahendra Mungase (Inactive)
              Reporter:
              rajendraj Rajendra Joshi (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 1h Original Estimate - 1h
                  1h
                  Remaining:
                  Time Spent - 12h Remaining Estimate - 0.75h
                  0.75h
                  Logged:
                  Time Spent - 12h Remaining Estimate - 0.75h
                  12h