Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-532

Issues with 'E-Verify Case Status' report.

    Details

    • Type: Bug
    • Status: Rejected
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Environment:
      Stage
    • Module:
      OnBoard
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q2

      Description

      In Partner login, below issues are observed with 'E-Verify Case Status' report.:

      1. All records are not displayed. Fields are empty.
      2. Column name is incorrect. Below title is observed
      'Could not find any resources appropriate for the specified culture or the neutral culture. Make sure "ReportsLocalization.Resources.resources" was correctly embedded or linked into assembly "ReportsLocalization" at compile time, or that all the satellite assemblies required are loadable and fully signed.' PFA screen shot

        Attachments

          Issue Links

            Activity

            rajendraj Rajendra Joshi (Inactive) created issue -
            rajendraj Rajendra Joshi (Inactive) made changes -
            Field Original Value New Value
            Link This issue is blocked by NF-42 [ NF-42 ]
            niteen.surwase Niteen Surwase (Inactive) logged work - 16/Mar/17 01:04 PM
            • Time Spent:
              0.5h
               

              Analysis and discussion with Rajendra

            niteen.surwase Niteen Surwase (Inactive) made changes -
            Remaining Estimate 1h [ 3600 ] 0.5h [ 1800 ]
            Time Spent 0.5h [ 1800 ]
            Worklog Id 31810 [ 31810 ]
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            Hi Shubhangi Jadhav ,

            Please check this on monday.

            Thanks,
            Swapnil P.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - Hi Shubhangi Jadhav , Please check this on monday. Thanks, Swapnil P.
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Assignee Niteen Surwase [ niteen.surwase ] Shubhangi Jadhav [ shubhangi.jadhav ]
            shubhangi.jadhav Shubhangi Jadhav (Inactive) logged work - 27/Mar/17 12:36 PM
            • Time Spent:
              5h
               

              analysis
              debugging
              internal discussion

            shubhangi.jadhav Shubhangi Jadhav (Inactive) made changes -
            Remaining Estimate 0.5h [ 1800 ] 0h [ 0 ]
            Time Spent 0.5h [ 1800 ] 5.5h [ 19800 ]
            Worklog Id 33976 [ 33976 ]
            surender.kumar surender kumar (Inactive) logged work - 27/Mar/17 01:01 PM
            • Time Spent:
              3h
               

              Analysis
              Discussion

            Hide
            surender.kumar surender kumar (Inactive) added a comment - - edited

            Hi Shubhangi Jadhav,

            This issue is because of RDL inconsistent on Stage and LB branch.
            We have to make consistent in all branches.
            Please Refer WT-7545.

            Regards,
            Surender Kumar

            cc: Prasanna Karlekar, Aditya Vishwakarma

            Show
            surender.kumar surender kumar (Inactive) added a comment - - edited Hi Shubhangi Jadhav , This issue is because of RDL inconsistent on Stage and LB branch. We have to make consistent in all branches. Please Refer WT-7545 . Regards, Surender Kumar cc: Prasanna Karlekar , Aditya Vishwakarma
            surender.kumar surender kumar (Inactive) made changes -
            Time Spent 5.5h [ 19800 ] 8.5h [ 30600 ]
            Worklog Id 33993 [ 33993 ]
            prasanna Prasanna Karlekar (Inactive) logged work - 27/Mar/17 10:00 PM
            • Time Spent:
              1h
               

              Discussion on label not getting displayed on E-Verify Report
              Pair Programming - Issue debug and analysis

            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Item State Parent values: Stage QA(10202) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            surender.kumar surender kumar (Inactive) made changes -
            Code Reviewed By Prasanna Karlekar [ 11907 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            prasanna Prasanna Karlekar (Inactive) logged work - 30/Mar/17 07:00 PM
            • Time Spent:
              0.25h
               

              Discussion on RDL error

            prasanna Prasanna Karlekar (Inactive) made changes -
            Time Spent 8.5h [ 30600 ] 8.75h [ 31500 ]
            Worklog Id 35278 [ 35278 ]
            prasanna Prasanna Karlekar (Inactive) made changes -
            Time Spent 8.75h [ 31500 ] 9.75h [ 35100 ]
            Worklog Id 35387 [ 35387 ]
            shubhangi.jadhav Shubhangi Jadhav (Inactive) made changes -
            Assignee Shubhangi Jadhav [ shubhangi.jadhav ] Rajendra Joshi [ rajendraj ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Attachment Stage done.png [ 44533 ]
            rajendraj Rajendra Joshi (Inactive) logged work - 06/Apr/17 07:29 AM
            • Time Spent:
              1.25h
               
              <No comment>
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment -

            Verified on Stage using company Long for HSPL. Above issues are resolved now.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - Verified on Stage using company Long for HSPL. Above issues are resolved now.
            rajendraj Rajendra Joshi (Inactive) made changes -
            Time Spent 9.75h [ 35100 ] 11h [ 39600 ]
            Worklog Id 36452 [ 36452 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            rajendraj Rajendra Joshi (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Issue Importance Q1 [ 14900 ] Q2 [ 14901 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            Hide
            surender.kumar surender kumar (Inactive) added a comment -

            3C:

            Concern :
            Error on E-Verify Case Status Report
            Could not find any resources appropriate for the specified culture or the neutral culture.

            Cause:
            As NF-23 is deployed only up to LB. That's why RDL was not updated on Stage.

            Correction:
            Updated RDL on Stage.

            Show
            surender.kumar surender kumar (Inactive) added a comment - 3C: Concern : Error on E-Verify Case Status Report Could not find any resources appropriate for the specified culture or the neutral culture. Cause: As NF-23 is deployed only up to LB. That's why RDL was not updated on Stage. Correction: Updated RDL on Stage.
            Hide
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited

            Not able to verify on production due to E-verification functionality not functioning. We require employee records with various statuses to verify report functionality. Hence, marking as on-hold.

            Show
            rajendraj Rajendra Joshi (Inactive) added a comment - - edited Not able to verify on production due to E-verification functionality not functioning. We require employee records with various statuses to verify report functionality. Hence, marking as on-hold.
            rajendraj Rajendra Joshi (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: On Hold(10219)
            rajendraj Rajendra Joshi (Inactive) logged work - 04/May/17 10:57 AM - edited
            • Time Spent:
              1h
               
              <No comment>
            rajendraj Rajendra Joshi (Inactive) made changes -
            Time Spent 11h [ 39600 ] 11.5h [ 41400 ]
            Worklog Id 43128 [ 43128 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Assignee Rajendra Joshi [ rajendraj ] Mahendra Mungase [ mahendra.mungase ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Time Spent 11.5h [ 41400 ] 12.75h [ 45900 ]
            Worklog Id 43128 [ 43128 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Remaining Estimate 0h [ 0 ] 0.75h [ 2700 ]
            Time Spent 12.75h [ 45900 ] 12h [ 43200 ]
            Worklog Id 43128 [ 43128 ]
            rajendraj Rajendra Joshi (Inactive) made changes -
            Environment Stage [ 10004 ]
            satyap Satya made changes -
            Environment_New Stage [ 18443 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: On Hold(10219) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            closed

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - closed
            rakeshr Rakesh Roy (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status In Development [ 10007 ] Rejected [ 10004 ]
            Transition Time In Source Status Execution Times
            Swapnil Pandhare (Inactive) made transition -
            Open In Development
            13d 19h 55m 1
            Swapnil Pandhare (Inactive) made transition -
            In Development In LB Testing
            17s 1
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Stage Testing
            7d 52m 1
            Rakesh Roy (Inactive) made transition -
            Stage Testing In Production Testing
            32d 4h 56m 1
            Rakesh Roy (Inactive) made transition -
            In Production Testing Production Complete
            282d 19h 27m 1
            Rakesh Roy (Inactive) made transition -
            Production Complete Closed
            2m 17s 1
            Sachin Hingole (Inactive) made transition -
            Closed Reopen in Production
            69d 15h 44m 1
            Sachin Hingole (Inactive) made transition -
            Reopen in Production In Development
            1m 55s 1
            Sachin Hingole (Inactive) made transition -
            In Development Rejected
            1m 28s 1

              People

              Assignee:
              mahendra.mungase Mahendra Mungase (Inactive)
              Reporter:
              rajendraj Rajendra Joshi (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 1h Original Estimate - 1h
                  1h
                  Remaining:
                  Time Spent - 12h Remaining Estimate - 0.75h
                  0.75h
                  Logged:
                  Time Spent - 12h Remaining Estimate - 0.75h
                  12h