Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-5632

All Accounts - UAT - Lapse in Company Selection Dropdown

    Details

    • Type: Bug
    • Status: Rejected
    • Priority: Low
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Labels:
      None
    • Environment:
      Pre Production
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Module:
      BenAdmin
    • Reported by:
      Client
    • Company:
      All Clients/Multiple Clients
    • Item State:
      Stage QA - Production Deployment on Hold
    • UAT For:
      UI Refresh

      Description

      Credentials Used:
      Account: All accounts
      User ID: dianawg
      Password: Password@1

      Issue:
      I logged in as Partner and clicked on the 'Select Company' function on the top left corner to trigger the dropdown. It show the loading prompt for a while, then there was a lapse of around 10 seconds before the dropdown is shown (even though I did not click anything else). You can see the reproduction here

      How it should work:
      Once the loading prompt goes away, the listing should show. As such, it should be a case where we either extend the duration of the prompt, or (preferred) improve the loading speed to shorten loading time.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Pratap Patil (Inactive) made transition -
            Open In Development
            1d 6h 45m 1
            Sachin Hingole (Inactive) made transition -
            In Development In LB Testing
            17h 9m 1
            Venkatesh Pujari (Inactive) made transition -
            In LB Testing Stage Testing
            1d 2h 35m 1
            Smita Pawar (Inactive) made transition -
            Stage Testing In Production Testing
            59d 3h 51m 1
            Smita Pawar (Inactive) made transition -
            In Production Testing Production Complete
            2m 42s 1
            Smita Pawar (Inactive) made transition -
            Production Complete Closed
            6s 1
            Sachin Hingole (Inactive) made transition -
            Closed Reopen in Production
            42d 13h 9m 1
            Sachin Hingole (Inactive) made transition -
            Reopen in Production In Development
            5s 1
            Sachin Hingole (Inactive) made transition -
            In Development Rejected
            10s 1

              People

              Assignee:
              sachin.hingole Sachin Hingole (Inactive)
              Reporter:
              diana Diana Wong (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 3h
                  3h
                  Remaining:
                  Time Spent - 2h 20m Remaining Estimate - 40m
                  40m
                  Logged:
                  Time Spent - 2h 20m Remaining Estimate - 40m
                  2h 20m