Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-63

Add, save, and submit check-in for individual

    XMLWordPrintable

    Details

    • Type: Enhancement
    • Status: Reopened in Stage
    • Priority: High
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Performance Management
    • Labels:
      None
    • Module:
      Performance Management
    • Reported by:
      Client
    • Item State:
      Development - Ready for Local Testing
    • Issue Importance:
      Q1

      Description

      a. The employee or supervisor can only create a new check-in if there is not one currently pending submission by either the individual or the supervisor.
      b. The check-in shall consist of a particular check-in date, a composite rating calculated based on the current weights of the employee's specified metrics for both the employee and the supervisor, and comments for both the employee and the supervisor.
      c. The employee or supervisor can save a check-in to enable editing at a later time.
      d. The employee or supervisor can only edit a check-in before it is submitted and is not allowed to make changes once it is submitted.
      e. The supervisor or employee cannot see the other's pending check-in information unless it has been submitted.
      f. A check-in is considered complete once both the employee and supervisor have submitted their ratings and comments.

        Attachments

        1. Check-in.xls
          23 kB
          Swapnil Eksambekar

          Issue Links

            Activity

              People

              Assignee:
              matthew.dominioni Matthew Dominioni (Inactive)
              Reporter:
              rakeshr Rakesh Roy (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:

                  Time Tracking

                  Estimated:
                  Original Estimate - 40h
                  40h
                  Remaining:
                  Time Spent - 27.5h Remaining Estimate - 12.5h
                  12.5h
                  Logged:
                  Time Spent - 27.5h Remaining Estimate - 12.5h
                  27.5h