Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-749

I-9 Approval Status >> Status Incomplete is not getting changed to DHS Tentative Non confirmation / SSA TNC

    Details

    • Type: Bug
    • Status: Rejected
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Environment:
      Stage
    • Module:
      OnBoard
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Q1

      Description

      on Company long for hspl, while doing case 3 with employee Elaine Goodell, US Citizen, SSN 000000007, US Passport : 441209794 below issues observed :

      1) while doing step part B, code 29 is not getting saved into database. Due to this, Status Incomplete is not getting changed to DHS Tentative Nonconfirmation. Similarly, this issue is also observed with code 27 with other employee while doing case 7.
      2) while doing step part B, on Form I-9 employment Eligibility Verification popup, on Save button, no validation / confirmation message displayed.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Rajendra Joshi (Inactive) made transition -
            Open In Development
            13d 2h 35m 1
            Rajendra Joshi (Inactive) made transition -
            Stage Testing Reopened in Stage
            6s 1
            Niteen Surwase (Inactive) made transition -
            Reopened in Stage In Development
            5d 16h 35m 1
            Niteen Surwase (Inactive) made transition -
            In Development In LB Testing
            7s 2
            Rakesh Roy (Inactive) made transition -
            In LB Testing Stage Testing
            1d 43m 2
            Rakesh Roy (Inactive) made transition -
            Stage Testing In Production Testing
            302d 2h 10m 1
            Rakesh Roy (Inactive) made transition -
            In Production Testing Production Complete
            7m 12s 1
            Rakesh Roy (Inactive) made transition -
            Production Complete Closed
            2m 17s 1
            Sachin Hingole (Inactive) made transition -
            Closed Reopen in Production
            69d 15h 44m 1
            Sachin Hingole (Inactive) made transition -
            Reopen in Production In Development
            2m 2s 1
            Sachin Hingole (Inactive) made transition -
            In Development Rejected
            1m 26s 1

              People

              Assignee:
              mahendra.mungase Mahendra Mungase (Inactive)
              Reporter:
              rajendraj Rajendra Joshi (Inactive)
              Developer:
              Niteen Surwase (Inactive)
              QA:
              Rajendra Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 20h Original Estimate - 20h
                  20h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 38.5h
                  38.5h