Type:
Enhancement
-
Status: Closed
-
Priority:
Medium
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: Integrations
-
Labels:None
-
Module:Bullhorn
-
Reported by:Client
-
Item State:Production Complete - Closed
-
Sprint:Bullhorn - 10 Apr 2017
-
Severity:Medium
- relates to
-
NF-946 Bullhorn Integration->Page to list tour and assign from 3rd party ATS portal
-
- Closed
-
-
NF-1287 Bullhorn Integration->I-9 status changed for one tour is getting reflected in other tour details as well.
-
- Closed
-
-
NF-1289 Bullhorn Integration->I-9 verification steps is displaying for two times after completing the assigned tours.
-
- Closed
-
-
NF-1345 Bullhorn Integration->Completion percentage should not be 100% if new steps are added after completion of tour.
-
- Closed
-
-
NF-1480 Bullhorn Integration->System eligible tour status should also be reflect on tour status page.
-
- Closed
-
-
NF-1826 Bullhorn Integration->Tour completion percentage is getting changed after traversing tour back and forth
-
- Closed
-
-
NF-1828 Bullhorn Integration->Tour completion status is get changed to 100% though employee not finished with last step.
-
- Closed
-
-
NF-1861 Bullhorn Integration->Change the message displaying while assigning same tour again.
-
- Closed
-
-
- Time Spent:
- 6h
-
Scripts for listing tour status with status of each tour step.
Implementation for view and controller.
Web api method to display tour step status
-
- Time Spent:
- 2h
-
Consuming api method through controller
-
- Time Spent:
- 3h
-
Testing scripts and view,Modified methods
-
- Time Spent:
- 6h
-
debugging MVC grid issue.
Script modification
-
- Time Spent:
- 3h
-
Allow option to add & call MVC controller / views from WebAPI project
-
- Time Spent:
- 7h
-
Logic changes for displaying view
-
- Time Spent:
- 7h
-
View changes.
Script modification.
Combine views within one and testing.
-
- Time Spent:
- 6h
-
Integration of code
Testing flow
Discussion
-
- Time Spent:
- 2.25h
-
Code review
Discussion with Seema
-
- Time Spent:
- 4h
-
Applying CSS to view and flow testing
-
- Time Spent:
- 1h
-
Helped Seema Gaikwad for the tour steps logic.
-
- Time Spent:
- 4.5h
-
CSS modifications
Suggested changes done and testing
-
- Time Spent:
- 1.5h
-
Suggested changes done.
Partial view creation.
Script modification.
-
- Time Spent:
- 0.5h
-
LB and UI refresh checkin
-
- Time Spent:
- 2h
-
Analysis and test case writing
-
- Time Spent:
- 2h
-
Testing and fix verification on Local
-
- Time Spent:
- 1.5h
-
Test case updation and testing