Uploaded image for project: 'Project Simple'
  1. Project Simple
  2. ST-288

LB | SA Utility | Rate Recal | Incorrect Plan Name is displayed

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Component/s: BenAdmin
    • Labels:
      None
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Level:
      Partner
    • Module:
      BenAdmin - Customization
    • Reported by:
      Harbinger

      Description

      Environment: LB
      Login: Partner
      SA Utility

      Issue: Wrong Plan is displayed in Plan Design drop down after selecting Rate.

      Steps:
      SA Utility > Rate Recal > Select Rate > Plan Design drop down > Wrong Plan is displayed.

      Ideally the Rate which is mapped to the plan should appear.

      If consider attached screen capture scenario.

      For Plan Anthem HDHP Plan rate mapped is 2017 Anthem HDHP PPo 90/10
      But on SA utility plan displayed is Anthem Blue Vision, which is incorrect.

        Attachments

        1. LB_PlanName.jpg
          233 kB
          Priya Dhamande
        2. PlandesignPopulate.png
          172 kB
          Vaishali Poojari

          Issue Links

            Activity

              People

              Assignee:
              priya.dhamande Priya Dhamande (Inactive)
              Reporter:
              priya.dhamande Priya Dhamande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0.25h Original Estimate - 0.25h
                  0.25h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1h
                  1h