Uploaded image for project: 'Project Simple'
  1. Project Simple
  2. ST-289

LB | SA Utility | Extend and Rate Recal | Multiple Rate selection but Plan Selection is not multiple so only one Plan specific rate is getting recalculated

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Component/s: BenAdmin
    • Labels:
      None
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Level:
      Partner
    • Module:
      BenAdmin - Customization
    • Reported by:
      Harbinger

      Description

      Environment: LB
      Company: Caiso for hspl
      Login: Partner

      Issue: Even Rates are selected multiple, Plan selection is single. So, even multiple plans are selected only one plan related Rate is getting Recalculated.

      Steps:
      Partner login > SA utility > Rate Recal > Extend and Recal > Select multiple Plans (like Medical, dental, Vision) > Now select only Medical Plan

      In this case even multiple plans can be selected but Rae will be recalculated for onlyMedical Plan

      Hrishikesh Deshpande

        Attachments

          Issue Links

            Activity

            Hide
            vaishali.poojari Vaishali Poojari (Inactive) added a comment -

            Hi Priya Dhamande,

            As per discussion with Amruta, If only one plan is selected from the Plan design dropdown, then rates for the selected plan will be recalculated.This is as per existing functionality.
            However, if multiple rates are selected and no plan is selected, then all the selected rates will be recalculated.

            cc: Amruta Lohiya,Hrishikesh Deshpande

            Show
            vaishali.poojari Vaishali Poojari (Inactive) added a comment - Hi Priya Dhamande , As per discussion with Amruta, If only one plan is selected from the Plan design dropdown, then rates for the selected plan will be recalculated.This is as per existing functionality. However, if multiple rates are selected and no plan is selected, then all the selected rates will be recalculated. cc: Amruta Lohiya , Hrishikesh Deshpande
            Hide
            priya.dhamande Priya Dhamande (Inactive) added a comment -

            Hi Vaishali Poojari,

            As per discussion, we are considering Plan Design only for displaying the Plans for Rate selected. Partner can skip the Plan selection if multiple Rates are selected. So, closing jira on LB itself, considering this as system behavior.

            Thanks

            Amruta Lohiya Hrishikesh Deshpande

            Show
            priya.dhamande Priya Dhamande (Inactive) added a comment - Hi Vaishali Poojari , As per discussion, we are considering Plan Design only for displaying the Plans for Rate selected. Partner can skip the Plan selection if multiple Rates are selected. So, closing jira on LB itself, considering this as system behavior. Thanks Amruta Lohiya Hrishikesh Deshpande

              People

              Assignee:
              priya.dhamande Priya Dhamande (Inactive)
              Reporter:
              priya.dhamande Priya Dhamande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1h 10m
                  1h 10m