Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-10950

Classwise OE - Passive work flow showing all plan in sequence bar

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      QA
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Sprint:
      WT Sprint 36 - Bugs

      Description

      Employee Election page ->* I don't want to make changes*
      click on continue button it should navigate to core plan which is already selected.
      go to the beneficiary page and log out or click on Benadmin Employee home page.
      All Plans come in sequence bar employee able to make changes on it.
      Expected: Only Selected plan should be coming in sequence bar

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Umesh Kadam (Inactive) made transition -
            Open In Development
            22h 40m 1
            Umesh Kadam (Inactive) made transition -
            In Development Rejected
            39m 40s 1
            Rashmita Dudhe (Inactive) made transition -
            Rejected Reopen
            46m 6s 1
            Umesh Kadam (Inactive) made transition -
            Reopen In Development
            1d 15h 23m 1
            Gaurav Sodani (Inactive) made transition -
            In Development In LB Testing
            10d 8h 5m 1
            Rakesh Roy (Inactive) made transition -
            In LB Testing Stage Testing
            9d 17m 1
            Rashmita Dudhe (Inactive) made transition -
            Stage Testing In Production Testing
            11d 18h 45m 1
            Rashmita Dudhe (Inactive) made transition -
            In Production Testing Production Complete
            4h 10m 1
            Rashmita Dudhe (Inactive) made transition -
            Production Complete Closed
            13s 1

              People

              Assignee:
              rashmita.dudhe Rashmita Dudhe (Inactive)
              Reporter:
              rashmita.dudhe Rashmita Dudhe (Inactive)
              Developer:
              Umesh Kadam (Inactive)
              QA:
              Rashmita Dudhe (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 6h
                  6h
                  Remaining:
                  Time Spent - 4.5h Remaining Estimate - 1.5h
                  1.5h
                  Logged:
                  Time Spent - 4.5h Remaining Estimate - 1.5h
                  4.5h