Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-11473

OE Dashboard has malformed OE Effective Date

    Details

    • Type: Bug
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Duplicate
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Environment:
      Production
    • Bug Severity:
      Critical
    • Module:
      BenAdmin - Export
    • Reported by:
      Support
    • Company:
      Yuba City

      Description

      Example company: Yuba City
      On company info OE effective date rule is as follows.

      And on the OE dashboard, OE effective date is shown as 01/01/0001

      The OE effective date is used to drive the end of the blackout period.

      CC Vinayak Kulkarni Amit Thorve Kevin Walker Ashley Marra Chris Ellenberger Van Nguyen Cindy Wibbing

        Attachments

          Issue Links

            Activity

            abhay.patil Abhay Patil (Inactive) created issue -
            prasadp Prasad Pise (Inactive) made changes -
            Field Original Value New Value
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: Enrollment(10107)
            rakeshr Rakesh Roy (Inactive) made changes -
            Module Parent values: BenAdmin(10100)Level 1 values: Enrollment(10107) Parent values: BenAdmin(10100)Level 1 values: Export(10110)
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vijay Siddha [ vijays ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            This issue is already reported.

            Show
            amitthorve Amit Thorve (Inactive) added a comment - This issue is already reported.
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - - edited

            Hi Abhay,

            This is already reported under WT-11261 and will get deployed into production in next scheduled patch.

            This is happened when there is no OE configured on company level so there is no OE effective date and system is updating as 01/01/0001.

            We need not to worry on this as we do not look OE effective date stored in dashboard for blackout period handling, we always get it from companyinfo ( both are actually same )
            and if particular template is processing for blackout period then it will not have 01/01/0001
            as it must have OE dates configured and this issue will occur if no OE is configured. Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - - edited Hi Abhay, This is already reported under WT-11261 and will get deployed into production in next scheduled patch. This is happened when there is no OE configured on company level so there is no OE effective date and system is updating as 01/01/0001. We need not to worry on this as we do not look OE effective date stored in dashboard for blackout period handling, we always get it from companyinfo ( both are actually same ) and if particular template is processing for blackout period then it will not have 01/01/0001 as it must have OE dates configured and this issue will occur if no OE is configured. Thanks.
            abhay.patil Abhay Patil (Inactive) made changes -
            Link This issue duplicates WT-11261 [ WT-11261 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Comment [ This is a duplicate. ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Abhay Patil [ abhay.patil ]
            Resolution Duplicate [ 3 ]
            Status In Development [ 10007 ] Rejected [ 10004 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Rejected [ 10004 ] Closed [ 6 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            It would be better to keep it "open" (rather than "closed" or "rejected").

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - It would be better to keep it "open" (rather than "closed" or "rejected").
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Root Cause Bug [ 18430 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            Van.Nguyen Van Nguyen (Inactive) added a comment -

            Rochelle Thomas, for your reference.

            Show
            Van.Nguyen Van Nguyen (Inactive) added a comment - Rochelle Thomas , for your reference.
            satyap Satya made changes -
            Labels Open_Enrollment_Dashboard
            rakeshr Rakesh Roy (Inactive) made changes -
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Environment Production [ 10005 ]
            Environment_New Production [ 18442 ]
            Hide
            lisadavison lisa davison added a comment -

            Vinayak Kulkarni and Samir

            Can you close this ticket? Thanks

            Show
            lisadavison lisa davison added a comment - Vinayak Kulkarni  and Samir ,  Can you close this ticket? Thanks
            Transition Time In Source Status Execution Times
            Vinayak Kulkarni (Inactive) made transition -
            Open In Development
            15h 55m 1
            Vinayak Kulkarni (Inactive) made transition -
            In Development Rejected
            13s 1
            Abhay Patil (Inactive) made transition -
            Rejected Closed
            13d 33m 1
            Abhay Patil (Inactive) made transition -
            Closed Reopen in Production
            55s 1
            Vinayak Kulkarni (Inactive) made transition -
            Reopen in Production In Development
            11d 13h 57m 1
            Vinayak Kulkarni (Inactive) made transition -
            In Development In LB Testing
            3s 1
            Vinayak Kulkarni (Inactive) made transition -
            In LB Testing Stage Testing
            3s 1
            Vinayak Kulkarni (Inactive) made transition -
            Stage Testing In Production Testing
            3s 1
            Rakesh Roy (Inactive) made transition -
            In Production Testing Production Complete
            2d 2h 3m 1

              People

              Assignee:
              abhay.patil Abhay Patil (Inactive)
              Reporter:
              abhay.patil Abhay Patil (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: