Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-1763

University of Notre Dame-QE Banner Payroll

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
    • Environment:
      Production
    • Module:
      BenAdmin - Export
    • Company:
      University of Notre Dame
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Must Have

      Description

      implementing QE and QE date columns.

        Attachments

        1. Banner 6.20.16.xlsx
          74 kB
        2. Book1.xlsx
          13 kB
        3. Change In Rate.png
          Change In Rate.png
          22 kB
        4. Copy of UAT OE Testing Script_06172016 (002).xlsx
          79 kB
        5. Copy of UND BANNER 6.16.2016.xlsx
          110 kB
        6. Election Change Reason Mapped Feeds List.xls
          79 kB
        7. Employee Demo.txt
          3 kB
        8. Employee Demo.txt
          3 kB
        9. Employee Demo.xlsx
          903 kB
        10. full payroll from 1.1.2016 to 7.1.2016.xlsx
          4.51 MB
        11. image001.jpg
          image001.jpg
          1.0 kB
        12. image002.jpg
          image002.jpg
          1 kB
        13. image002.png
          image002.png
          0.6 kB
        14. image004.png
          image004.png
          1 kB
        15. image006.jpg
          image006.jpg
          1 kB
        16. image007.png
          image007.png
          5 kB
        17. image008.jpg
          image008.jpg
          64 kB
        18. image009.jpg
          image009.jpg
          2 kB
        19. image010.jpg
          image010.jpg
          2 kB
        20. image012.png
          image012.png
          0.7 kB
        21. image013.gif
          image013.gif
          0.2 kB
        22. Import Enrollment.png
          Import Enrollment.png
          21 kB
        23. UND_Banner_QE.PNG
          UND_Banner_QE.PNG
          28 kB
        24. UND_BannerPayroll061720161704.7z
          3 kB
        25. UND_lasted_test_file_by_Dev.PNG
          UND_lasted_test_file_by_Dev.PNG
          34 kB
        26. UND.PNG
          UND.PNG
          34 kB
        27. UND.xls
          7 kB
        28. UND File and Scenarios.zip
          24 kB
        29. Wellness Contingency.JPG
          Wellness Contingency.JPG
          129 kB

          Issue Links

            Activity

            Damion.Velasquez Damion M Velasquez created issue -
            Damion.Velasquez Damion M Velasquez made changes -
            Field Original Value New Value
            Link This issue clones EDI-227 [ EDI-227 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Priority Highest [ 1 ] Medium [ 3 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Description University of Notre Dame-OE Banner Payroll implementing QE and QE date columns.
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            QE being tested in Stage. Once client signs off, we will request DEV move templates to PROD, and this will replace the pre-existing Banner Feeds that exports Daily @ 5pm

            Great news Mary,

            As soon as we have your approval I will need to have this Staging Export moved into our Production Environment, and this will replace the existing banner export that goes daily. This exercise may take 24/hrs to turn around.

            Thanks again!

            Damion Velasquez | EDI, WORKTERRA
            Employee Benefit Specialists, Inc.
            PO Box 11657, Pleasanton, CA 94588
            PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com

            _______________________________________________________________________________________________________________________________________

            Total Enrollment Services l Employer & Employee Member Portals l Flexible Spending Accounts l Commuter Benefits
            Employer Flex Benefit Card l COBRA & Retiree Administration l Invoice Reconciliation l Voluntary Benefits

            www.ebsbenefits.com www.workterra.com

            DISCLAIMER
            This e-mail message (including attachments, if any) is intended for the use of the individual or entity to which it is addressed and may contain information that is privileged, proprietary, confidential and exempt from disclosure. If you are not the intended recipient, you are notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender and erase this e-mail message immediately.

            From: Mary Kocks mkocks@nd.edu
            Sent: Tuesday, February 09, 2016 5:17 AM
            To: Damion Velasquez
            Cc: Ashley Marra; Phil Almeida; Cindy Wibbing; Jim Heide; Steven Cohen
            Subject: Re: UND QE File name

            So far the file looks good. We hope to do a deeper test by the end of the week. We'll let you know how that goes.
            Amit ThorvePhil AlmeidaAshley Marra

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited QE being tested in Stage. Once client signs off, we will request DEV move templates to PROD, and this will replace the pre-existing Banner Feeds that exports Daily @ 5pm Great news Mary, As soon as we have your approval I will need to have this Staging Export moved into our Production Environment, and this will replace the existing banner export that goes daily. This exercise may take 24/hrs to turn around. Thanks again! Damion Velasquez | EDI, WORKTERRA Employee Benefit Specialists, Inc. PO Box 11657, Pleasanton, CA 94588 PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com _______________________________________________________________________________________________________________________________________ Total Enrollment Services l Employer & Employee Member Portals l Flexible Spending Accounts l Commuter Benefits Employer Flex Benefit Card l COBRA & Retiree Administration l Invoice Reconciliation l Voluntary Benefits www.ebsbenefits.com www.workterra.com DISCLAIMER This e-mail message (including attachments, if any) is intended for the use of the individual or entity to which it is addressed and may contain information that is privileged, proprietary, confidential and exempt from disclosure. If you are not the intended recipient, you are notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender and erase this e-mail message immediately. From: Mary Kocks mkocks@nd.edu Sent: Tuesday, February 09, 2016 5:17 AM To: Damion Velasquez Cc: Ashley Marra; Phil Almeida; Cindy Wibbing; Jim Heide; Steven Cohen Subject: Re: UND QE File name So far the file looks good. We hope to do a deeper test by the end of the week. We'll let you know how that goes. Amit Thorve Phil Almeida Ashley Marra
            Damion.Velasquez Damion M Velasquez made changes -
            Status New [ 10508 ] Feed Configuration [ 10400 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status Feed Configuration [ 10400 ] In Test [ 10016 ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Feedback From Client:

            had a mapping for Term Date applied to Child College end date. This was left over from Stage, and I removed Damion M VelasquezAshley Marra

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Feedback From Client: had a mapping for Term Date applied to Child College end date. This was left over from Stage, and I removed Damion M Velasquez Ashley Marra
            Hide
            amarra Ashley Marra (Inactive) added a comment -

            Damion M Velasquez Mary informed me yesterday that she will most likely be requesting a new QE file this Friday, 2/19, for a delivery date of Monday. I wanted to give you a heads up because I am not sure how long it takes you to run this template. Let me know if Monday would not work and I will tell the client. Thanks!

            Show
            amarra Ashley Marra (Inactive) added a comment - Damion M Velasquez Mary informed me yesterday that she will most likely be requesting a new QE file this Friday, 2/19, for a delivery date of Monday. I wanted to give you a heads up because I am not sure how long it takes you to run this template. Let me know if Monday would not work and I will tell the client. Thanks!
            Hide
            amarra Ashley Marra (Inactive) added a comment -

            Damion M Velasquez Per UND's email from 2/18, can you please post another QE file? Thanks!

            Show
            amarra Ashley Marra (Inactive) added a comment - Damion M Velasquez Per UND's email from 2/18, can you please post another QE file? Thanks!
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Ashley MarraPhil AlmeidaAmit Thorve
            posted new file for Changes ONLY to UND for Stage Testing

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Ashley Marra Phil Almeida Amit Thorve posted new file for Changes ONLY to UND for Stage Testing
            Hide
            amarra Ashley Marra (Inactive) added a comment -

            Damion M Velasquez I have now updated all QEs except the admin QE to have the effective date rule be “first of the month following or coincident with event date”.

            Damion, there are a couple of issues that will be resolved by me changing the rule on the QE to the above rule. There are a couple of other issues that we need to look at from a file perspective. We can talk about these but they are in reference to not getting a term record code back on the file for an employee who switches from employee only coverage to family coverage. Once Steve is finished entering scenarios into Stage for the new QE rules by end of day Thursday he will inform us and then if we can push out another file that would be great. Also, UND is expecting a full file and not a change file. Can we please send them a full file the next time around?

            Show
            amarra Ashley Marra (Inactive) added a comment - Damion M Velasquez I have now updated all QEs except the admin QE to have the effective date rule be “first of the month following or coincident with event date”. Damion, there are a couple of issues that will be resolved by me changing the rule on the QE to the above rule. There are a couple of other issues that we need to look at from a file perspective. We can talk about these but they are in reference to not getting a term record code back on the file for an employee who switches from employee only coverage to family coverage. Once Steve is finished entering scenarios into Stage for the new QE rules by end of day Thursday he will inform us and then if we can push out another file that would be great. Also, UND is expecting a full file and not a change file. Can we please send them a full file the next time around?
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Ashley Marra Ok let me know and I can run the file. I look into the scenario above when I run it out

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Ashley Marra Ok let me know and I can run the file. I look into the scenario above when I run it out
            Hide
            amarra Ashley Marra (Inactive) added a comment -

            Damion M Velasquez I just talked to the client and they might want a QE file tonight. He will let us know but I wanted to give you a heads up. THanks!

            Show
            amarra Ashley Marra (Inactive) added a comment - Damion M Velasquez I just talked to the client and they might want a QE file tonight. He will let us know but I wanted to give you a heads up. THanks!
            phil.almeida Phil Almeida (Inactive) made changes -
            Account Executive Ashley Marra [ amarra ]
            Resolution Fixed [ 1 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak KulkarniAshley MarraPhil AlmeidaAmit Thorve
            Hello Vinayak,

            I am having an issue again with these templates. I also posted to JIRA. The client is expecting a Test File today, and they are on the east coast. Any chance this can be looked into

            From_Prod_OE Illusions Banner Accident Employer Paid
            From_Prod_OE Illusions Banner CI Employer
            From_Prod_OE Illusions Banner HRA

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni Ashley Marra Phil Almeida Amit Thorve Hello Vinayak, I am having an issue again with these templates. I also posted to JIRA. The client is expecting a Test File today, and they are on the east coast. Any chance this can be looked into From_Prod_OE Illusions Banner Accident Employer Paid From_Prod_OE Illusions Banner CI Employer From_Prod_OE Illusions Banner HRA Thank you
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Damion M Velasquez

            It was again problem with Qualifying events wrong data.
            We have corrected it Stage now. Can you please check & let us know if this is working or not.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Damion M Velasquez It was again problem with Qualifying events wrong data. We have corrected it Stage now. Can you please check & let us know if this is working or not.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Issued Test File will wait for results to test this function

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Issued Test File will wait for results to test this function
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Sent test file will test what DEV fixed with the plans

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Sent test file will test what DEV fixed with the plans
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak Kulkarni Hello,

            First id like to thank you for your patience. This file has been a monster.

            For all templates in Stage that begin with From_Prod_OE Illusions Banner: We have two new columns in this File layout. Qualifying Event fields aren't populating properly. I am going to send you an email with the PHI for an example.

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni Hello, First id like to thank you for your patience. This file has been a monster. For all templates in Stage that begin with From_Prod_OE Illusions Banner: We have two new columns in this File layout. Qualifying Event fields aren't populating properly. I am going to send you an email with the PHI for an example. Thank you
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak KulkarniAshley MarraAmit Thorve

            Hello Vinayak,

            Can you provide a status? Apologies but the client in this case wants daily follow ups.

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni Ashley Marra Amit Thorve Hello Vinayak, Can you provide a status? Apologies but the client in this case wants daily follow ups. Thank you
            Damion.Velasquez Damion M Velasquez made changes -
            Priority Medium [ 3 ] Highest [ 1 ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinanti YadavAmit ThorveCindy WibbingAshley MarraSteve Allison

            Hello Vinayak.

            Can you provide a status for this? Please refer to the email I sent with the examples where this issue is happening. The client is following up on a daily basis.
            Please advise

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinanti Yadav Amit Thorve Cindy Wibbing Ashley Marra Steve Allison Hello Vinayak. Can you provide a status for this? Please refer to the email I sent with the examples where this issue is happening. The client is following up on a daily basis. Please advise Thank you
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hey Damion,

            Per our discussion today, we need confirm that whether first file needs QE code on all records or is it ok if few comes with blank QE codes.

            Also, we need to transform every mode by which changes could happen in the system.

            Thanks,
            Vinayak

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hey Damion, Per our discussion today, we need confirm that whether first file needs QE code on all records or is it ok if few comes with blank QE codes. Also, we need to transform every mode by which changes could happen in the system. Thanks, Vinayak
            Hide
            sallison Steve Allison (Inactive) added a comment -

            This issue for ND has been escalated to me. We have a call today with the client at 11:30am PST. I have asked Ashley and Cindy to get with Damion and Vinayak first thing this morning to prep for the call with the client and problem solve. Then Cindy will be on the call with the client at 11:30 to talk through the limitations and possible solutions.

            Thanks everyone.

            Steve

            Show
            sallison Steve Allison (Inactive) added a comment - This issue for ND has been escalated to me. We have a call today with the client at 11:30am PST. I have asked Ashley and Cindy to get with Damion and Vinayak first thing this morning to prep for the call with the client and problem solve. Then Cindy will be on the call with the client at 11:30 to talk through the limitations and possible solutions. Thanks everyone. Steve
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            We just created company on production with name "UND For Banner Payroll Testing", please verify you have access to it.
            Also we need to make sure all export templates are set-up properly with QE codes & dates.

            Let us know if you face any issues with it.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, We just created company on production with name "UND For Banner Payroll Testing", please verify you have access to it. Also we need to make sure all export templates are set-up properly with QE codes & dates. Let us know if you face any issues with it.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Attachment UND_Banner_QE.PNG [ 13530 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            See attached, Enrollments terminated due to employee data change Event and this is not transformed.

            The changes you did through QE to employee/dependet data which changed enrollments will fall under Employee Data Change Event.

            If you do enrollment changes directly with QE then that QE will come on file.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, See attached, Enrollments terminated due to employee data change Event and this is not transformed. The changes you did through QE to employee/dependet data which changed enrollments will fall under Employee Data Change Event. If you do enrollment changes directly with QE then that QE will come on file.
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            To get Qualifying event for enrollment changes instead of Employee Data Change, I have forwarded this to development team to analyze further.
            It seems to be big & generic change in system. We would expect more updates by Monday.

            Thanks,
            Vinayak

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, To get Qualifying event for enrollment changes instead of Employee Data Change, I have forwarded this to development team to analyze further. It seems to be big & generic change in system. We would expect more updates by Monday. Thanks, Vinayak
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            Vinayak KulkarniPlease update if you have any. Also could you please let me know that person name who is working to follow-up?

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - Vinayak Kulkarni Please update if you have any. Also could you please let me know that person name who is working to follow-up?
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Rakesh,

            Scenario testing is going on, Damion & Ashley are working on this.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Rakesh, Scenario testing is going on, Damion & Ashley are working on this.
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Damion Velasquez [ damion.velasquez ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status In Test [ 10016 ] In Peer Review [ 10502 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status In Peer Review [ 10502 ] Carrier Testing [ 10600 ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            Vinayak Kulkarni
            I have another Client Inquiry:
            We have created a Deceased QE, and only the terminations records passed properly. All of the active records that passed with a new effective date did not get the QE date. Im going to send an example member via email.

            Production
            Client: UND For Banner Payroll Testing

            email:
            Hello Again,

            After a call today the client asked if we could do the following.

            Between the two fields Effective/Termination date and Qualifying Event Date. All of the term records passed a 3/31/2016 and the Event date however the Active records have 4/1/2016 in both positions. The QE Date field should have the QE Date
            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited Vinayak Kulkarni I have another Client Inquiry: We have created a Deceased QE, and only the terminations records passed properly. All of the active records that passed with a new effective date did not get the QE date. Im going to send an example member via email. Production Client: UND For Banner Payroll Testing email: Hello Again, After a call today the client asked if we could do the following. Between the two fields Effective/Termination date and Qualifying Event Date. All of the term records passed a 3/31/2016 and the Event date however the Active records have 4/1/2016 in both positions. The QE Date field should have the QE Date Thank you
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Damion,

            QE date works as follows,

            For new hires = Employment date
            For Rehire = Rehire date
            For QE ( only QE not review change approval ) = Event date
            For all other
            Election Effective date.

            In this case, event is review change approval, so QE date is appearing as Election effective date.

            You can try election or rate change date, this will populate date on which election is changed.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Damion, QE date works as follows, For new hires = Employment date For Rehire = Rehire date For QE ( only QE not review change approval ) = Event date For all other Election Effective date. In this case, event is review change approval, so QE date is appearing as Election effective date. You can try election or rate change date, this will populate date on which election is changed.
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak Kulkarni
            I tried the MACRO you suggested but you are correct, it only gave the Action Date when Ashley entered the transactions (3/18/2016). This will not work for UND. We will need to know what it would take to
            1) Get the review change approval to associate with the QE
            2) When a term of plans happens for (Divorce, death, etc) the active records that come back need to associate with the Qualifying event that occurred.

            We are unclear if this can be done at the client level or that it may be a system wide change that needs Higher level of approval

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni I tried the MACRO you suggested but you are correct, it only gave the Action Date when Ashley entered the transactions (3/18/2016). This will not work for UND. We will need to know what it would take to 1) Get the review change approval to associate with the QE 2) When a term of plans happens for (Divorce, death, etc) the active records that come back need to associate with the Qualifying event that occurred. We are unclear if this can be done at the client level or that it may be a system wide change that needs Higher level of approval
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            here is response from development team on expected change,

            Requirement : As per existing functionality, Enrollments terminated due to employee data change Event are terminated with Employee data change mode(i.e. 14)
            As per requirement, instead of Employee Data Change mode, Qualifying event mode is not reflected with which employee data change is done
            Feasibility : If this change is done, we won't be able to identify, if employee data change caused termination or employee himself changed enrollment.
            Also, this will have major impact on system and it is generic change. So, this change should not be taken as enhancement.

            Same email is forwarded to you.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, here is response from development team on expected change, Requirement : As per existing functionality, Enrollments terminated due to employee data change Event are terminated with Employee data change mode(i.e. 14) As per requirement, instead of Employee Data Change mode, Qualifying event mode is not reflected with which employee data change is done Feasibility : If this change is done, we won't be able to identify, if employee data change caused termination or employee himself changed enrollment. Also, this will have major impact on system and it is generic change. So, this change should not be taken as enhancement. Same email is forwarded to you.
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            This is to add in the QE dates to the Active Records with QE Codes on the Banner File

            Show
            Damion.Velasquez Damion M Velasquez added a comment - This is to add in the QE dates to the Active Records with QE Codes on the Banner File
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Rohan J Khandave We will discuss this on Monday's call, Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Rohan J Khandave We will discuss this on Monday's call, Thanks.
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Rohan Khandave [ rohan.khandave ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Find below details about UND banner payroll.

            1] Employee part

            employee logs into system => does changes and elections goes for admin approvals => Admin approves them.

            Problem #1: Active Records are coming up with proper QE Code but not with QE date
            Solution: We have done code changes to get QE Dates proper. This will come into production by Tuesday 04/12/2016.

            Problem #2: Terminated records do not have QE code & Date.
            This is because of Review Change Approval due to which QE codes are not getting stored for terminated records

            Solution: Our EDS team is analyzing this on Priority and We would get response by End of Monday.

            2] Admin part

            Sam is going to ask UND for list of QEs that Admin will do by themselves.

            We are good with below Admin items,
            1] If Admin does Employee status changes like Termination of employment or deceased
            2] If Admin adds coverage with QE like child birth

            We have problems with below,
            1] If admin drops coverage through Employee Data change, like using Divorce QE.

            Cause:
            If Admin is changing something, it will not go for approval.
            Lets say Admin changes Employee's Spouse status to Ex-spouse which will terminate spouse from coverage.
            Here, Election are changed due to Employee data change, regardless of QE used to change spouse status.

            So here all active & terminated records will fall under Employee Data Change and not QE.
            Although you can send Employee Data change on file.

            Correction: We have workaround but you need to ask UND for this.

            Workaround: Admin needs to change enrollment directly with QE from enroll now screen.
            Admin needs to drop spouse from coverage using QE from enroll now screen first and then make spouse to Ex-spouse.

            For Terminated & deceased, please try with separate export templates as discussed.

            Let us know if you have any queries on this.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Find below details about UND banner payroll. 1] Employee part employee logs into system => does changes and elections goes for admin approvals => Admin approves them. Problem #1: Active Records are coming up with proper QE Code but not with QE date Solution: We have done code changes to get QE Dates proper. This will come into production by Tuesday 04/12/2016. Problem #2: Terminated records do not have QE code & Date. This is because of Review Change Approval due to which QE codes are not getting stored for terminated records Solution: Our EDS team is analyzing this on Priority and We would get response by End of Monday. 2] Admin part Sam is going to ask UND for list of QEs that Admin will do by themselves. We are good with below Admin items, 1] If Admin does Employee status changes like Termination of employment or deceased 2] If Admin adds coverage with QE like child birth We have problems with below, 1] If admin drops coverage through Employee Data change, like using Divorce QE. Cause: If Admin is changing something, it will not go for approval. Lets say Admin changes Employee's Spouse status to Ex-spouse which will terminate spouse from coverage. Here, Election are changed due to Employee data change, regardless of QE used to change spouse status. So here all active & terminated records will fall under Employee Data Change and not QE. Although you can send Employee Data change on file. Correction: We have workaround but you need to ask UND for this. Workaround: Admin needs to change enrollment directly with QE from enroll now screen. Admin needs to drop spouse from coverage using QE from enroll now screen first and then make spouse to Ex-spouse. For Terminated & deceased, please try with separate export templates as discussed. Let us know if you have any queries on this.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Aniruddha Dev [ aniruddha.dev ]
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            Hi Priya,

            Can you please look into this ?

            Thanks & Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - Hi Priya, Can you please look into this ? Thanks & Regards, Aniruddha Dev
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Assignee Aniruddha Dev [ aniruddha.dev ] Priya Dhamande [ priya.dhamande ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Environment Production [ 10005 ]
            Issue Type Feed Configuration Request [ 10200 ] Bug [ 1 ]
            Key EDI-259 WT-1763
            Project WorkTerraEDI [ 10300 ] WORKTERRA [ 10000 ]
            Status Carrier Testing [ 10600 ] Local Testing [ 10200 ]
            Workflow WorkTerraEDI_NW_Ver3 [ 12673 ] WT_Defects [ 15047 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: LB QA(10201)
            Hide
            priya.dhamande Priya Dhamande (Inactive) added a comment -

            The above concern is checked on LB with Employee and Admin part.
            Problem #1: Active Records are coming up with proper QE Code but not with QE date:
            Now, on exported file active records are coming with correct Qualifying date.

            When the Admin approves the Employee request of qualifying event then the exported file displays the date of qualifying event.

            The patch is ready for Stage.

            Show
            priya.dhamande Priya Dhamande (Inactive) added a comment - The above concern is checked on LB with Employee and Admin part. Problem #1: Active Records are coming up with proper QE Code but not with QE date: Now, on exported file active records are coming with correct Qualifying date. When the Admin approves the Employee request of qualifying event then the exported file displays the date of qualifying event. The patch is ready for Stage.
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Resolution Fixed [ 1 ] Unresolved [ 10200 ]
            Status Production Testing [ 10202 ] Reopen in Production [ 10027 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Item State Parent values: LB QA(10201) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            rajendra.pawar Rajendra Pawar (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Hide
            priya.dhamande Priya Dhamande (Inactive) added a comment -

            The above concern is checked on Stage with Employee and Admin part.

            Problem #1: Active Records are coming up with proper QE Code but not with QE date:
            Now, on exported file active records are coming with correct Qualifying date.
            When the Admin approves the Employee request of qualifying event then the exported file displays the date of qualifying event.

            The patch is ready for Production.

            Show
            priya.dhamande Priya Dhamande (Inactive) added a comment - The above concern is checked on Stage with Employee and Admin part. Problem #1: Active Records are coming up with proper QE Code but not with QE date: Now, on exported file active records are coming with correct Qualifying date. When the Admin approves the Employee request of qualifying event then the exported file displays the date of qualifying event. The patch is ready for Production.
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            rajendra.pawar Rajendra Pawar (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            priya.dhamande Priya Dhamande (Inactive) added a comment - - edited

            The mentioned concern is checked on UND for HSPL. Now, the QE Date is updated as per the date of Qualifying Event.

            The issue: Active Records are coming up with proper QE Code but not with QE date is tested, verified and closed on production.

            Vinayak Kulkarni: can you please assign to authorized person.

            Show
            priya.dhamande Priya Dhamande (Inactive) added a comment - - edited The mentioned concern is checked on UND for HSPL. Now, the QE Date is updated as per the date of Qualifying Event. The issue: Active Records are coming up with proper QE Code but not with QE date is tested, verified and closed on production. Vinayak Kulkarni : can you please assign to authorized person.
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Resolution Unresolved [ 10200 ] Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Assignee Priya Dhamande [ priya.dhamande ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            We have deployed fix for Active records Event dates, please verify, Thanks

            sam lindberg

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, We have deployed fix for Active records Event dates, please verify, Thanks sam lindberg
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            sam lindbergVinayak Kulkarni
            Sam will add in some scenarios to test.

            Show
            Damion.Velasquez Damion M Velasquez added a comment - sam lindberg Vinayak Kulkarni Sam will add in some scenarios to test.
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Assigning to you.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Assigning to you.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Satya [ ID10004 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Satya:

            Whats the eta to get the term code logic into stage? Ideally, I would like it to be in by Friday so me and the clients can test it in stage on Monday. Please make sure to regression test for the active code logic.

            Tell me if you need more time.

            I would like the code to move to prod by end of next week if testing goes smooth.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Satya: Whats the eta to get the term code logic into stage? Ideally, I would like it to be in by Friday so me and the clients can test it in stage on Monday. Please make sure to regression test for the active code logic. Tell me if you need more time. I would like the code to move to prod by end of next week if testing goes smooth. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Account Executive Ashley Marra [ amarra ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Dev Due Date 15/Apr/2016
            Production Due Date 22/Apr/2016
            QA Due Date 19/Apr/2016
            Stage Due Date 15/Apr/16 [ 2016-04-15 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Satya:

            What's the progress of the termination logic build?

            Can you explain the solution you came up with?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Satya: What's the progress of the termination logic build? Can you explain the solution you came up with? Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Please See prior notes in regards to qe code and date for term lines.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Please See prior notes in regards to qe code and date for term lines.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Production Complete(10222)Level 1 values: Closed(10223) Parent values: Production QA(10203)Level 1 values: Re-open(10220)
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi

            What is the progress of the term code?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi What is the progress of the term code? Thank you, Sam
            satyap Satya made changes -
            Link This issue relates to WT-1766 [ WT-1766 ]
            Hide
            satyap Satya added a comment -

            Terminated records issue - for EDS & Enrollment

            Show
            satyap Satya added a comment - Terminated records issue - for EDS & Enrollment
            Hide
            satyap Satya added a comment -

            Hi Sam,

            For terminated record issue there is separate ticket created WT-1766. for this point currently development is going on.

            It's development is getting completed by Wednesday, 4/20/2016. We will update you on its ETA for Stage.

            Thanks & Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - Hi Sam, For terminated record issue there is separate ticket created WT-1766 . for this point currently development is going on. It's development is getting completed by Wednesday, 4/20/2016. We will update you on its ETA for Stage. Thanks & Regards, Satya Prakash
            satyap Satya made changes -
            Link This issue relates to WT-1823 [ WT-1823 ]
            Hide
            satyap Satya added a comment -

            Hi Sheetal,

            Please update comments in this ticket after completing development. This is parent ticket for

            Thanks & Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - Hi Sheetal, Please update comments in this ticket after completing development. This is parent ticket for WT-1766 WT-1823 Thanks & Regards, Satya Prakash
            satyap Satya made changes -
            Assignee Satya [ ID10004 ] Sheetal Bodhale [ sheetal.bodhale ]
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi Satya,

            I have updated the WT-1823 ticket which is assigned to me.
            Girija PotdarPlease update WT-1766 ticket.

            Thanks,
            Sheetal.

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi Satya, I have updated the WT-1823 ticket which is assigned to me. Girija Potdar Please update WT-1766 ticket. Thanks, Sheetal.
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi sam lindberg,

            This is deployed on stage today.

            Thanks,
            Sheetal

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi sam lindberg , This is deployed on stage today. Thanks, Sheetal
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Verified feed on Stage. It is working proper.

            Sheetal Bodhale Please deploy patch on Production.

            CC; Alankar Chavan Deepali Tidke

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Verified feed on Stage. It is working proper. Sheetal Bodhale Please deploy patch on Production. CC; Alankar Chavan Deepali Tidke
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Damion M Velasquez

            Hi Damion,

            This fix moved on production and working as expected.

            Thanks,
            Hrishikesh

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Damion M Velasquez Hi Damion, This fix moved on production and working as expected. Thanks, Hrishikesh
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Re-open(10220) Parent values: Production QA(10203)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: Production QA(10203) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Sheetal Bodhale [ sheetal.bodhale ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak Kulkarnisam lindberg]Sent email regarding server error. Global template will not run

            QE_UND_BANNER_PAYROLL

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni sam lindberg ]Sent email regarding server error. Global template will not run QE_UND_BANNER_PAYROLL
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion,

            Please try now and let us know if you still get an error, Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, Please try now and let us know if you still get an error, Thanks.
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi

            On the latest payroll we tried to run we did not get any qe dates and codes fro the following employees.

            Thomas Schaefer
            Aaron Gills
            Erin Camilleri

            We had qe events run on them.

            WE need this asap.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi On the latest payroll we tried to run we did not get any qe dates and codes fro the following employees. Thomas Schaefer Aaron Gills Erin Camilleri We had qe events run on them. WE need this asap. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vinayak Kulkarni [ vinayak.kulkarni ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Book1.xlsx [ 16203 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Sam,

            First of all, you should Re-Open closed JIRA ticket if you feel its not working, only then it will come up as Action item for us.
            As of now, i have re-opened it.

            About QEs, For first employee Thomas Schaefer, we can see Death QE is raised and employee status is still active, is this realistic that employee will do QE for deceased?? I think Admin has to do employee status change to Deceased and we will have separate EDI templates for deceased and terminated ones .

            We will go through this together tomorrow first thing in the morning and also discussion this with Damion Thanks.

            Damion M Velasquez

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Sam, First of all, you should Re-Open closed JIRA ticket if you feel its not working, only then it will come up as Action item for us. As of now, i have re-opened it. About QEs, For first employee Thomas Schaefer, we can see Death QE is raised and employee status is still active, is this realistic that employee will do QE for deceased?? I think Admin has to do employee status change to Deceased and we will have separate EDI templates for deceased and terminated ones . We will go through this together tomorrow first thing in the morning and also discussion this with Damion Thanks. Damion M Velasquez
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Resolution Fixed [ 1 ] Unresolved [ 10200 ]
            Status Production Testing [ 10202 ] Reopen in Production [ 10027 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Vin

            Damion tested the the file but it did not populate the QE dates and QE codes. Can you look on the backend and see why its not pulling them?

            Please look in Y:\1.CLIENT\Notre Dame\5. EDI\Structure_Specs\Banner file\2016 QE Banner\Test Files\4-27-2016

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Vin Damion tested the the file but it did not populate the QE dates and QE codes. Can you look on the backend and see why its not pulling them? Please look in Y:\1.CLIENT\Notre Dame\5. EDI\Structure_Specs\Banner file\2016 QE Banner\Test Files\4-27-2016 Thank you, Sam
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak Kulkarnisam lindbergCindy Wibbing

            Vinayak. Since we cannot put PHI into JIRA I cant reference the members that have QEs but didn't reflect any code whether active or termed. There are a lot of rows that have values however are from 2015 OE and prior and are not valid in this file. I cloned all 9 templates and updated the status within each one. Term template status's are Deceased, Inactive, and terminated. These are omitted from the other grouped templates.

            Group Template
            QE_UND_Banner Payroll
            Compay Level
            QE Illusions Banner Employee Supp Life
            QE Illusions Banner Child Dependent on Employee Life
            QE Illusions Banner Spouse Dependent Life
            QE Illusions Banner Accident Employee Paid
            QE Illusions Banner CI Employee
            QE Illusions Banner Payroll
            QE Illusions Banner HRA
            QE Illusions Banner Accident Employer Paid
            QE Illusions Banner CI Employer

            Compay Level Term templates
            QE Illusions Banner Employee Supp Life_Term
            QE Illusions Banner Child Dependent on Employee Life_Term
            QE Illusions Banner Spouse Dependent Life_Term
            QE Illusions Banner Accident Employee Paid_Term
            QE Illusions Banner CI Employee_Term
            QE Illusions Banner Payroll_Term
            QE Illusions Banner HRA_Term
            QE Illusions Banner Accident Employer Paid_Term
            QE Illusions Banner CI Employer_Term

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni sam lindberg Cindy Wibbing Vinayak. Since we cannot put PHI into JIRA I cant reference the members that have QEs but didn't reflect any code whether active or termed. There are a lot of rows that have values however are from 2015 OE and prior and are not valid in this file. I cloned all 9 templates and updated the status within each one. Term template status's are Deceased, Inactive, and terminated. These are omitted from the other grouped templates. Group Template QE_UND_Banner Payroll Compay Level QE Illusions Banner Employee Supp Life QE Illusions Banner Child Dependent on Employee Life QE Illusions Banner Spouse Dependent Life QE Illusions Banner Accident Employee Paid QE Illusions Banner CI Employee QE Illusions Banner Payroll QE Illusions Banner HRA QE Illusions Banner Accident Employer Paid QE Illusions Banner CI Employer Compay Level Term templates QE Illusions Banner Employee Supp Life_Term QE Illusions Banner Child Dependent on Employee Life_Term QE Illusions Banner Spouse Dependent Life_Term QE Illusions Banner Accident Employee Paid_Term QE Illusions Banner CI Employee_Term QE Illusions Banner Payroll_Term QE Illusions Banner HRA_Term QE Illusions Banner Accident Employer Paid_Term QE Illusions Banner CI Employer_Term
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            sam lindberg I dont have access to Y drive, can you please send that file to me?

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - sam lindberg I dont have access to Y drive, can you please send that file to me?
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Damion M Velasquez sam lindberg I will come to you to check this tomorrow morning.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Damion M Velasquez sam lindberg I will come to you to check this tomorrow morning.
            Hide
            sallison Steve Allison (Inactive) added a comment -

            What's the projected resolution on this requirement for Notre Dame? I thought Dave presented a solution for this to Development and here we are still with no final resolution.

            Show
            sallison Steve Allison (Inactive) added a comment - What's the projected resolution on this requirement for Notre Dame? I thought Dave presented a solution for this to Development and here we are still with no final resolution.
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi All:

            We went through testing and found some issues so we are now doing more dev and also updating the templates that extract the payroll.

            Dev code should be migrated to prod on Tuesday.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi All: We went through testing and found some issues so we are now doing more dev and also updating the templates that extract the payroll. Dev code should be migrated to prod on Tuesday. Thank you, Sam
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Sam,
            All the code changes are deployed production, please check.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Sam, All the code changes are deployed production, please check.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            I have setup the tc.

            candr5853351075107 divorce
            dgump5735370817081 marriage but I termed benefits
            wbren0815439683968 Birth
            amani3135077197719 death of child and spouse
            awilk3089886778677 Dependent spouse or child obtains insurance

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - I have setup the tc. candr5853351075107 divorce dgump5735370817081 marriage but I termed benefits wbren0815439683968 Birth amani3135077197719 death of child and spouse awilk3089886778677 Dependent spouse or child obtains insurance
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Sam and Damion,

            Other records did not come on file because they are not approved.

            And for last two records no QE code is associated that is why QE date is not populated. and date that is there would be election effective date.
            This must be an employee data change event.

            Also, please note that, all code and changes are in production.
            So there is nothing pending from development for this file.
            Please review file and changes and let us know if you feel something is not working.

            Satya Sachin Khandge Rohan J Khandave

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Sam and Damion, Other records did not come on file because they are not approved. And for last two records no QE code is associated that is why QE date is not populated. and date that is there would be election effective date. This must be an employee data change event. Also, please note that, all code and changes are in production. So there is nothing pending from development for this file. Please review file and changes and let us know if you feel something is not working. Satya Sachin Khandge Rohan J Khandave
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            I approved the pending enrollments.

            Damion can you run the payroll one more time and make sure its good.

            If it runs ok and you feel its perfect, lets release it into the wild.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - I approved the pending enrollments. Damion can you run the payroll one more time and make sure its good. If it runs ok and you feel its perfect, lets release it into the wild. Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            testing is complete.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - testing is complete.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Resolution Unresolved [ 10200 ] Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            testing passed.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - testing passed.
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Issue Importance Must Have [ 11800 ]
            Hide
            admin David Rhodes (Inactive) added a comment -

            Thanks everyone that worked on this.

            Show
            admin David Rhodes (Inactive) added a comment - Thanks everyone that worked on this.
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            it looks like the new new hire QE is not getting a code. Can we hardode this by a status or something in the back end so it doesnt have to be a major change?
            Vinayak Kulkarnisam lindbergSatyaRohan J Khandave

            Show
            Damion.Velasquez Damion M Velasquez added a comment - it looks like the new new hire QE is not getting a code. Can we hardode this by a status or something in the back end so it doesnt have to be a major change? Vinayak Kulkarni sam lindberg Satya Rohan J Khandave
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            New hire is not QE, its individual enrollment mode and fix was done for QE only.
            We have "Is NewHire Employee" mapping field which is Yes/No DTS field, but this will be new column on file, now sure whether client accept new column only for new hire.

            I will talk to team about this new hire scenario and get back to you.

            CC Rohan J Khandave Satya

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - New hire is not QE, its individual enrollment mode and fix was done for QE only. We have "Is NewHire Employee" mapping field which is Yes/No DTS field, but this will be new column on file, now sure whether client accept new column only for new hire. I will talk to team about this new hire scenario and get back to you. CC Rohan J Khandave Satya
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Vinny:

            For New hire i want it to have a qe code of 01, Also the qe dates should be the effective date of the benefits. The effective date will be populated for the event date as well. New hire is a qe event based on UND discussions.

            This needs to be updated today so we can rerun the file tomorrow and send it to them for review.

            thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Vinny: For New hire i want it to have a qe code of 01, Also the qe dates should be the effective date of the benefits. The effective date will be populated for the event date as well. New hire is a qe event based on UND discussions. This needs to be updated today so we can rerun the file tomorrow and send it to them for review. thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Sam,

            I have commented on 4th May 2016 on this JIRA that all the logic is deployed on production and do test and let us know if you feel something is not working. Now after 10 days if you are feeling new hires are not working and want to get it done over the night is incredible.

            Still, I talked to Rohan J Khandave yesterday about this and we are analyzing this change. As this will be changed for all of the clients so if in future some another client wants Review change Approval instead of new hires then we would face issues again.
            That is why we are planning conditional solution which will satisfy both.

            Rohan will update you about ETA.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Sam, I have commented on 4th May 2016 on this JIRA that all the logic is deployed on production and do test and let us know if you feel something is not working. Now after 10 days if you are feeling new hires are not working and want to get it done over the night is incredible. Still, I talked to Rohan J Khandave yesterday about this and we are analyzing this change. As this will be changed for all of the clients so if in future some another client wants Review change Approval instead of new hires then we would face issues again. That is why we are planning conditional solution which will satisfy both. Rohan will update you about ETA.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Rohan Khandave [ rohan.khandave ]
            Hide
            sallison Steve Allison (Inactive) added a comment -

            Sam when something is released for testing make sure that all scenarios are tested before moving to PROD. This appears to be a missed step in testing. Is that that the case? Or did the client request further modification? Regardless, we need all requirements and testing complete before they are moved to PROD>

            Show
            sallison Steve Allison (Inactive) added a comment - Sam when something is released for testing make sure that all scenarios are tested before moving to PROD. This appears to be a missed step in testing. Is that that the case? Or did the client request further modification? Regardless, we need all requirements and testing complete before they are moved to PROD>
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Rakesh Shahane [ rakesh.shahane ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Steve:

            I did not realize that new hire would be included in the qe code. Much of the requirements were outlined before i was on the client.

            I spoke with them and asked for clarification.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Steve: I did not realize that new hire would be included in the qe code. Much of the requirements were outlined before i was on the client. I spoke with them and asked for clarification. Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi All:

            What's the ETA til completion?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi All: What's the ETA til completion? Thank you, Sam
            rakesh.shahane Rakesh Shahane (Inactive) made changes -
            Link This issue relates to WT-2490 [ WT-2490 ]
            Hide
            rakesh.shahane Rakesh Shahane (Inactive) added a comment -

            Hi sam lindberg,
            We have created separate JIRA WT-2490 for this ,This will move to local Environment on 23rd May 2016 then will move to production as per the patch process .

            Show
            rakesh.shahane Rakesh Shahane (Inactive) added a comment - Hi sam lindberg , We have created separate JIRA WT-2490 for this ,This will move to local Environment on 23rd May 2016 then will move to production as per the patch process .
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            Hrishikesh Deshpande Aniruddha Dev Please provide the Stage ETA for WT -2490.

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - Hrishikesh Deshpande Aniruddha Dev Please provide the Stage ETA for WT -2490.
            Hide
            rakesh.shahane Rakesh Shahane (Inactive) added a comment -

            Hi Damion M Velasquez,
            CC-Hrishikesh DeshpandeVinayak Kulkarni sam lindberg

            We have made changes for New hire ScenarioWT-2490 ,we need confirmation what output is expected for following scenarios.
            1)In case of Rehire if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file?
            2)In case of Open Enrollment if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file?
            3)Please confirm that do you need this changes only for UND or generic for all companies?

            Please note that changes are currently on local Environment and will move after confirmation of above scenarios.

            Show
            rakesh.shahane Rakesh Shahane (Inactive) added a comment - Hi Damion M Velasquez , CC- Hrishikesh Deshpande Vinayak Kulkarni sam lindberg We have made changes for New hire Scenario WT-2490 ,we need confirmation what output is expected for following scenarios. 1)In case of Rehire if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? 2)In case of Open Enrollment if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? 3)Please confirm that do you need this changes only for UND or generic for all companies? Please note that changes are currently on local Environment and will move after confirmation of above scenarios .
            rakesh.shahane Rakesh Shahane (Inactive) made changes -
            Assignee Rakesh Shahane [ rakesh.shahane ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Sent confirmation request to client:
            Good Morning Mary,

            This coding is near complete, however we wanted to insure that all possible scenarios will get 100% QE Code Coverage for new hire, Rehire, and Open Enrollment Events. Can you help with the 2 below points?

            1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire
            2)In case of Open Enrollment: if Enrollment is pending for approval then approved; what should be expected output for QE Code field on file? Potentially map to '10' Admin QE

            UND Requested QE's
            1) a 2 digit QE indicator with values
            01 - new hire enrollment
            02 - job status change
            03 - child birth or adoption or granted legal guardianship
            04 - dependent spouse or child loses his/her insurance coverage
            05 - married
            06 - death of dependent
            07 - dependent child loses eligibility
            08 - dependent spouse or child obtains insurance
            09 - divorce
            10 - admin change

            Thanks Mary

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Sent confirmation request to client: Good Morning Mary, This coding is near complete, however we wanted to insure that all possible scenarios will get 100% QE Code Coverage for new hire, Rehire, and Open Enrollment Events. Can you help with the 2 below points? 1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire 2)In case of Open Enrollment: if Enrollment is pending for approval then approved; what should be expected output for QE Code field on file? Potentially map to '10' Admin QE UND Requested QE's 1) a 2 digit QE indicator with values 01 - new hire enrollment 02 - job status change 03 - child birth or adoption or granted legal guardianship 04 - dependent spouse or child loses his/her insurance coverage 05 - married 06 - death of dependent 07 - dependent child loses eligibility 08 - dependent spouse or child obtains insurance 09 - divorce 10 - admin change Thanks Mary
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Rakesh ShahaneVinayak Kulkarni[~sam.lindberg@ebsbenefits.com}

            1)In case of Rehire if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? Rehire will follow the new hire rule. If new hire/Rehire Value 01
            2)In case of Open Enrollment if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? Open Enrollment will be a NULL value
            3)Please confirm that do you need this changes only for UND or generic for all companies? This should be treated the same as the prior Sprint. I am not aware whether it is for System Wide or at the Client.

            This is a sever high priority

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Rakesh Shahane Vinayak Kulkarni [~sam.lindberg@ebsbenefits.com} 1)In case of Rehire if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? Rehire will follow the new hire rule. If new hire/Rehire Value 01 2)In case of Open Enrollment if Enrollment is pending for approval then after approval what should be expected output for Enrollment change in election reason field on file? Open Enrollment will be a NULL value 3)Please confirm that do you need this changes only for UND or generic for all companies? This should be treated the same as the prior Sprint. I am not aware whether it is for System Wide or at the Client. This is a sever high priority Thank you
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            From: Mary Kocks mkocks@nd.edu
            Sent: Friday, May 20, 2016 11:49 AM
            To: Damion Velasquez
            Cc: Steven Cohen; Sam Lindberg; Jim Heide; Cindy Wibbing
            Subject: Re: banner testing

            Yes, new hires and re-hires would both have a '01' QE indicator.

            On Fri, May 20, 2016 at 2:42 PM, Damion Velasquez <damion.velasquez@ebsbenefits.com> wrote:
            Thank You Mary

            Would it be safe to say that #1 is accurate. That a REHIRE would be coded the same as a NEW HIRE?
            1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire?

            Damion Velasquez | EDI, WORKTERRA
            Employee Benefit Specialists, Inc.
            PO Box 11657, Pleasanton, CA 94588
            PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com

            From: Mary Kocks mkocks@nd.edu
            Sent: Friday, May 20, 2016 11:17 AM
            To: Steven Cohen
            Cc: Damion Velasquez; Sam Lindberg; Jim Heide; Cindy Wibbing
            Subject: Re: banner testing

            Damion,

            We would expect all Open Enrollment records to have an 'O' in the first character and a null QE indicator.

            Mary

            On Fri, May 20, 2016 at 12:20 PM, Steven Cohen <scohen3@nd.edu> wrote:
            Hi Damion,

            I can't speak to what code we should receive back for Open Enrollment since we get an O back instead of a Q for the record, but during OE we don't allow any pending changes. Whatever an employee selects goes through. Due to the large employee base we have, manually approving all of the benefits would be too lengthy of a process.

            Thanks!

            On Friday, May 20, 2016, Damion Velasquez <damion.velasquez@ebsbenefits.com> wrote:
            Good Morning Mary,

            This coding is near complete, however we wanted to insure that all possible scenarios will get 100% QE Code Coverage for new hire, Rehire, and Open Enrollment Events. Can you help with the 2 below points?

            1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire
            2)In case of Open Enrollment: if Enrollment is pending for approval then approved; what should be expected output for QE Code field on file? Potentially map to '10' Admin QE

            UND Requested QE's
            1) a 2 digit QE indicator with values
            01 - new hire enrollment
            02 - job status change
            03 - child birth or adoption or granted legal guardianship
            04 - dependent spouse or child loses his/her insurance coverage
            05 - married
            06 - death of dependent
            07 - dependent child loses eligibility
            08 - dependent spouse or child obtains insurance
            09 - divorce
            10 - admin change

            Thanks Mary

            Show
            Damion.Velasquez Damion M Velasquez added a comment - From: Mary Kocks mkocks@nd.edu Sent: Friday, May 20, 2016 11:49 AM To: Damion Velasquez Cc: Steven Cohen; Sam Lindberg; Jim Heide; Cindy Wibbing Subject: Re: banner testing Yes, new hires and re-hires would both have a '01' QE indicator. On Fri, May 20, 2016 at 2:42 PM, Damion Velasquez <damion.velasquez@ebsbenefits.com> wrote: Thank You Mary Would it be safe to say that #1 is accurate. That a REHIRE would be coded the same as a NEW HIRE? 1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire? Damion Velasquez | EDI, WORKTERRA Employee Benefit Specialists, Inc. PO Box 11657, Pleasanton, CA 94588 PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com From: Mary Kocks mkocks@nd.edu Sent: Friday, May 20, 2016 11:17 AM To: Steven Cohen Cc: Damion Velasquez; Sam Lindberg; Jim Heide; Cindy Wibbing Subject: Re: banner testing Damion, We would expect all Open Enrollment records to have an 'O' in the first character and a null QE indicator. Mary On Fri, May 20, 2016 at 12:20 PM, Steven Cohen <scohen3@nd.edu> wrote: Hi Damion, I can't speak to what code we should receive back for Open Enrollment since we get an O back instead of a Q for the record, but during OE we don't allow any pending changes. Whatever an employee selects goes through. Due to the large employee base we have, manually approving all of the benefits would be too lengthy of a process. Thanks! On Friday, May 20, 2016, Damion Velasquez <damion.velasquez@ebsbenefits.com> wrote: Good Morning Mary, This coding is near complete, however we wanted to insure that all possible scenarios will get 100% QE Code Coverage for new hire, Rehire, and Open Enrollment Events. Can you help with the 2 below points? 1)In case of a Rehire: if Enrollment is pending for approval then approved; what should the expected output be for QE Code field on file? Potentially map this to '01' new Hire 2)In case of Open Enrollment: if Enrollment is pending for approval then approved; what should be expected output for QE Code field on file? Potentially map to '10' Admin QE UND Requested QE's 1) a 2 digit QE indicator with values 01 - new hire enrollment 02 - job status change 03 - child birth or adoption or granted legal guardianship 04 - dependent spouse or child loses his/her insurance coverage 05 - married 06 - death of dependent 07 - dependent child loses eligibility 08 - dependent spouse or child obtains insurance 09 - divorce 10 - admin change Thanks Mary
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Damion M Velasquez,

            We are working on this functionality. Code which mentioned in above comments can be an achieve by DTS.

            But can you confirm scope for above change like generic or company specific? We have scan production companies for feeds where "Enrollment Change Reason" is mapped PFA for same Election Change Reason Mapped Feeds List.xls

            So generic change will impact feeds across companies. So please give inputs for same.

            CC-- Vinayak Kulkarni Satya sam lindberg

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Damion M Velasquez , We are working on this functionality. Code which mentioned in above comments can be an achieve by DTS. But can you confirm scope for above change like generic or company specific? We have scan production companies for feeds where "Enrollment Change Reason" is mapped PFA for same Election Change Reason Mapped Feeds List.xls So generic change will impact feeds across companies. So please give inputs for same. CC-- Vinayak Kulkarni Satya sam lindberg
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Rohan J KhandaveVinayak Kulkarnisam lindberg
            Rohan, I dont know if this is my call to make, without seeing the code. Is this just a table being added to the back-end? if so we would anticipate company level. I believe all of the other updates for this QE Code process has been a system wide change.

            sam lindbergSam your thoughts

            CC: Cindy Wibbing

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Rohan J Khandave Vinayak Kulkarni sam lindberg Rohan, I dont know if this is my call to make, without seeing the code. Is this just a table being added to the back-end? if so we would anticipate company level. I believe all of the other updates for this QE Code process has been a system wide change. sam lindberg Sam your thoughts CC: Cindy Wibbing
            rakeshr Rakesh Roy (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Rohan:

            Company level would be most appropriate.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Rohan: Company level would be most appropriate. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Rohan Khandave [ rohan.khandave ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Rohan:

            Was this migrated to prod? If not when will it be done?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Rohan: Was this migrated to prod? If not when will it be done? Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Can we move forward with this ticket?

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Can we move forward with this ticket?
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Comment [ move forward with changes. ]
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello sam lindberg,

            Please find below comments which i commented yesterday on JIRA WT-2490

            Hello Damion Velasquez,
            Thanks for your reply , we have start working on this issue.
            We are developing new field(Election Change Reason Of Review Pending) which will will work accordingly "Election Change Reason" along with changes suggested by UND for New Hire.
            So please find changed estimation.

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello sam lindberg , Please find below comments which i commented yesterday on JIRA WT-2490 Hello Damion Velasquez, Thanks for your reply , we have start working on this issue. We are developing new field(Election Change Reason Of Review Pending) which will will work accordingly "Election Change Reason" along with changes suggested by UND for New Hire. So please find changed estimation.
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Ganesh Sadawarte [ ganesh.sadawarte ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Production Complete(10222)Level 1 values: Closed(10223) Parent values: Production QA(10203)Level 1 values: Re-open(10220)
            satyap Satya made changes -
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: Export(10110)
            satyap Satya made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            satyap Satya made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            satyap Satya made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            sam lindberg

            Hi Sam,

            We have deployed WT-2490 on Production. Please verify this at you end.

            Let us know in case of any queries

            Thanks & Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - sam lindberg Hi Sam, We have deployed WT-2490 on Production. Please verify this at you end. Let us know in case of any queries Thanks & Regards, Aniruddha Dev
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Re-open(10220) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            hi Damion

            Please go ahead with testing.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - hi Damion Please go ahead with testing. Thank you, Sam
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            Can yo ulook into this? We are not able to get a new hire QE when the Qualifying Event happens. Test employee
            Damion Velip entered today as the employee with a QE

            sam lindbergRohan J KhandaveVinayak KulkarniSatya

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited Can yo ulook into this? We are not able to get a new hire QE when the Qualifying Event happens. Test employee Damion Velip entered today as the employee with a QE sam lindberg Rohan J Khandave Vinayak Kulkarni Satya
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Aniruddha Dev [ aniruddha.dev ]
            Hide
            sallison Steve Allison (Inactive) added a comment -

            Can we get a call setup nightly to review this together until resolved? i.e. 8pm PST - 9:30am IST? We can't keep losing 12-24 hours on back and forth on testing, research, etc.

            Damion, please setup a call with you, Sam and whoever makes sense on DEV side until resolved. If we don't need the call just cancel....but we need to get daily updates on this until resolved.

            Thanks,
            Steve

            Show
            sallison Steve Allison (Inactive) added a comment - Can we get a call setup nightly to review this together until resolved? i.e. 8pm PST - 9:30am IST? We can't keep losing 12-24 hours on back and forth on testing, research, etc. Damion, please setup a call with you, Sam and whoever makes sense on DEV side until resolved. If we don't need the call just cancel....but we need to get daily updates on this until resolved. Thanks, Steve
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Steve Allisonsam lindbergAmit GudeVinayak KulkarniAniruddha DevRohan J KhandaveSatyaGanesh SadawartePradeep Kanojia [X]

            Hello All,
            Please provide times you can be available for a call to discuss the status of this last updating we are trying to accomplish for this feed to go LIVE for the Client. We understand Harbinger may have off-time availability due to the Time Difference, and we will make accommodations as needed

            Issues on the TABLE: No QE Code for new Hire Qualifying Events. The client and Sam have both entered transactions for New hire and no codes are populating.

            Thank you and please advise ASAP!!!! we need to get on the phone and discuss strategies for this to be finalized

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Steve Allison sam lindberg Amit Gude Vinayak Kulkarni Aniruddha Dev Rohan J Khandave Satya Ganesh Sadawarte Pradeep Kanojia [X] Hello All, Please provide times you can be available for a call to discuss the status of this last updating we are trying to accomplish for this feed to go LIVE for the Client. We understand Harbinger may have off-time availability due to the Time Difference, and we will make accommodations as needed Issues on the TABLE: No QE Code for new Hire Qualifying Events. The client and Sam have both entered transactions for New hire and no codes are populating. Thank you and please advise ASAP!!!! we need to get on the phone and discuss strategies for this to be finalized
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            sam lindberg Damion M Velasquez

            Hi ,

            The new fields 1) Enrollment Election Change Reason of Review Pending 2) Enrollment Qualifying Event Date of Review Pending which were exposed need to be mapped on the template . We see this mapping is missing on Template . We will map this and will update you on this .

            Thanks & Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - sam lindberg Damion M Velasquez Hi , The new fields 1) Enrollment Election Change Reason of Review Pending 2) Enrollment Qualifying Event Date of Review Pending which were exposed need to be mapped on the template . We see this mapping is missing on Template . We will map this and will update you on this . Thanks & Regards, Aniruddha Dev
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Aniruddha Dev Will #1 be allowed for Data Transformation?

            Thank you

            sam lindberg

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Aniruddha Dev Will #1 be allowed for Data Transformation? Thank you sam lindberg
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            Damion M Velasquez

            Hi Damion,

            Yes, #1 is allowed for Data Transformation.

            Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - Damion M Velasquez Hi Damion, Yes, #1 is allowed for Data Transformation. Regards, Aniruddha Dev
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Aniruddha Devsam lindberg

            I did a quick mapping/export on template: QE Illusions Banner Payroll. For the new hire we added I see 'General' and 'Review Change approval' populating on File because I didnt DTS those fields. Question: Will General or Review change approval 'alone' happen in any other scenario other than New Hires? Thanks

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Aniruddha Dev sam lindberg I did a quick mapping/export on template: QE Illusions Banner Payroll. For the new hire we added I see 'General' and 'Review Change approval' populating on File because I didnt DTS those fields. Question: Will General or Review change approval 'alone' happen in any other scenario other than New Hires? Thanks
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - - edited

            Damion M Velasquezsam lindberg

            Hi Damion,

            Please go through our comments below

            Enrollment Change reason - Review Change Approval

            This happens whenever enrollment goes for Admin Approval . Such as New Hire Enrollment , Re-hire Enrollment, Force Contingent Plans etc.
            We have checked records for Test Employee 'Rosie Test'. This employee got change reason as 'Review Change Approval' for 'Wellness Center' plan. This plan has force contingency on 'Medical Waiver' Plan (Please find attached screenshot). When employee has new hire mode and as admin approval is pending for 'Medical Waiver' due to that 'Wellness Center' enrollment is not added. When admin approves "Medical" enrollment then as per forced contingency 'Wellness Center' enrollment gets added with latest enrollment mode of "Medical Waiver Plan" i.e Review Change Approval.

            Enrollment Change Reason - General
            This happens in case of Core Plan Allocation.
            In case of 'Rosie Test' employee . Travel Insurance Plan is a Core Plan . So records for this plan will have 'General' as enrollment change reason.

            This is as per our current implementation.

            Thanks & regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - - edited Damion M Velasquez sam lindberg Hi Damion, Please go through our comments below Enrollment Change reason - Review Change Approval This happens whenever enrollment goes for Admin Approval . Such as New Hire Enrollment , Re-hire Enrollment, Force Contingent Plans etc. We have checked records for Test Employee 'Rosie Test'. This employee got change reason as 'Review Change Approval' for 'Wellness Center' plan. This plan has force contingency on 'Medical Waiver' Plan (Please find attached screenshot). When employee has new hire mode and as admin approval is pending for 'Medical Waiver' due to that 'Wellness Center' enrollment is not added. When admin approves "Medical" enrollment then as per forced contingency 'Wellness Center' enrollment gets added with latest enrollment mode of "Medical Waiver Plan" i.e Review Change Approval . Enrollment Change Reason - General This happens in case of Core Plan Allocation. In case of 'Rosie Test' employee . Travel Insurance Plan is a Core Plan . So records for this plan will have 'General' as enrollment change reason. This is as per our current implementation. Thanks & regards, Aniruddha Dev
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Attachment Wellness Contingency.JPG [ 19343 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Aniruddha Dev [ aniruddha.dev ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            sam lindbergsent test file to UND. There is a small pool of missing QE Codes for TRV, Wellness and LFX plans which is expected. Will wait for results

            Show
            Damion.Velasquez Damion M Velasquez added a comment - sam lindberg sent test file to UND. There is a small pool of missing QE Codes for TRV, Wellness and LFX plans which is expected. Will wait for results
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            SatyaVinayak Kulkarnisam lindberg
            Hello,

            We ran across one issue with the templates below. Transaction on the following members were done and are not passing on the file
            1) Spousal Life was added for a Marriage QE, but the record was not sent in the file - ID #900501769
            2) For a child birth QE, spousal life was waived and the new baby was added to child life. Neither record was received back in the file. - ID #900548102

            EMPL ID:
            QE Illusions Banner Child Dependent on Employee Life
            QE Illusions Banner Spouse Dependent Life

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited Satya Vinayak Kulkarni sam lindberg Hello, We ran across one issue with the templates below. Transaction on the following members were done and are not passing on the file 1) Spousal Life was added for a Marriage QE, but the record was not sent in the file - ID #900501769 2) For a child birth QE, spousal life was waived and the new baby was added to child life. Neither record was received back in the file. - ID #900548102 EMPL ID: QE Illusions Banner Child Dependent on Employee Life QE Illusions Banner Spouse Dependent Life
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Aniruddha Dev [ aniruddha.dev ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Assignee Aniruddha Dev [ aniruddha.dev ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Damion M Velasquez,

            We checked both employees below are details for same.

            1) EMP ID - 900548102 , Spousal Life Insurance : Enrollment into "Spousal Life Insurance" got dead on 12/17/2015 with by user "Farida Suhardjo". And in OE user waived on 05/12/2016 by "steve cohen". So employee is never enrolled into "Spousal Life Insurance". Also termination reported on 04/29/2016 and template is changes only.

            For Child Life & Spouse Life , we checked "Effective Date Service" services is not executed on "UND For Banner Payroll Testing" company as this is test company. We run this service today and exported file again. Both Child & Spouse life enrollments exported on file.

            Note : For daily services we are considering this company only.

            CC – Vinayak Kulkarni , Satya , sam lindberg

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Damion M Velasquez , We checked both employees below are details for same. 1) EMP ID - 900548102 , Spousal Life Insurance : Enrollment into "Spousal Life Insurance" got dead on 12/17/2015 with by user "Farida Suhardjo". And in OE user waived on 05/12/2016 by "steve cohen". So employee is never enrolled into "Spousal Life Insurance". Also termination reported on 04/29/2016 and template is changes only. For Child Life & Spouse Life , we checked "Effective Date Service" services is not executed on "UND For Banner Payroll Testing" company as this is test company. We run this service today and exported file again. Both Child & Spouse life enrollments exported on file. Note : For daily services we are considering this company only. CC – Vinayak Kulkarni , Satya , sam lindberg
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Rohan Khandave [ rohan.khandave ]
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Damion M Velasquez,

            Please close ticket if above details satisfying or if you required more information.

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Damion M Velasquez , Please close ticket if above details satisfying or if you required more information.
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            Posted a new test file and see records missing for Spousal Life and child Life are now appearing.

            sam lindberg

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited Posted a new test file and see records missing for Spousal Life and child Life are now appearing. sam lindberg
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Employee Demo.xlsx [ 19700 ]
            Attachment Employee Demo.txt [ 19701 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Employee Demo.txt [ 19702 ]
            Attachment Employee Demo.xlsx [ 19703 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Employee Demo.xlsx [ 19703 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Employee Demo.txt [ 19702 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Dev:

            Could you help me import this test data to test the banner demo data. The layout we are supposed to use is "emp demo initial load." Employee Demo.xlsx Employee Demo.txt. I keep gettting an error of Error(s): Total fields in file does not match total number of fields in template.

            The goal is to import the the new hires so that the MD wellness plan populates. We are not seeing the wellness plan having the QE code during a new hire.

            Can you see why in the new hire scenario MD wellness code is not getting the qe code?

            Can we get this completed by tomorrow? It would be fantastic.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Dev: Could you help me import this test data to test the banner demo data. The layout we are supposed to use is "emp demo initial load." Employee Demo.xlsx Employee Demo.txt . I keep gettting an error of Error(s): Total fields in file does not match total number of fields in template. The goal is to import the the new hires so that the MD wellness plan populates. We are not seeing the wellness plan having the QE code during a new hire. Can you see why in the new hire scenario MD wellness code is not getting the qe code? Can we get this completed by tomorrow? It would be fantastic. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Rohan Khandave [ rohan.khandave ]
            Hide
            vishal.bajad Vishal Bajad (Inactive) added a comment -

            Hi ,
            We have corrected '_Employee Demo Initial Load' import template with respect to 'Employee Demo.txt' file on 'UND For Banner Payroll Testing' as well as on 'UND For Banner Payroll Testing for HSPL'. I have corrected file for Last name , because Last Name should not contain Numbers. we have successfully imported corrected import file on 'UND For Banner Payroll Testing for HSPL' company,

            Please have a look and let us know if you are facing any problem during import.

            Show
            vishal.bajad Vishal Bajad (Inactive) added a comment - Hi , We have corrected '_Employee Demo Initial Load' import template with respect to 'Employee Demo.txt' file on 'UND For Banner Payroll Testing' as well as on 'UND For Banner Payroll Testing for HSPL'. I have corrected file for Last name , because Last Name should not contain Numbers. we have successfully imported corrected import file on 'UND For Banner Payroll Testing for HSPL' company, Please have a look and let us know if you are facing any problem during import.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Employee Demo.txt [ 19907 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            hi Vishal:

            I still get the error for not the the correct number of fields.

            Can you load my corrected file to the UND For Banner Payroll Testing?

            Thank you,
            Sam Employee Demo.txt

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - hi Vishal: I still get the error for not the the correct number of fields. Can you load my corrected file to the UND For Banner Payroll Testing? Thank you, Sam Employee Demo.txt
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Vishal Bajad [ vishal.bajad ]
            Hide
            vishal.bajad Vishal Bajad (Inactive) added a comment -

            Hi sam lindberg ,

            We have imported given file on "UND For Banner Payroll Testing" successfully.

            Please have a look.

            Show
            vishal.bajad Vishal Bajad (Inactive) added a comment - Hi sam lindberg , We have imported given file on "UND For Banner Payroll Testing" successfully. Please have a look.
            vishal.bajad Vishal Bajad (Inactive) made changes -
            Assignee Vishal Bajad [ vishal.bajad ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Thank you very much. What did you do upload the file?

            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Thank you very much. What did you do upload the file? Sam
            Hide
            admin David Rhodes (Inactive) added a comment -

            What was the problem? Why was Sam getting an error?

            Show
            admin David Rhodes (Inactive) added a comment - What was the problem? Why was Sam getting an error?
            Hide
            vishal.bajad Vishal Bajad (Inactive) added a comment -

            Hi ,
            Total fields in file does not match total number of fields in template. Fields count in template is 31 but there were 30 fields in sams files so this files goes to bad. I have added only one blank column in file and imported. its succeeded.

            Thanks.

            Show
            vishal.bajad Vishal Bajad (Inactive) added a comment - Hi , Total fields in file does not match total number of fields in template. Fields count in template is 31 but there were 30 fields in sams files so this files goes to bad. I have added only one blank column in file and imported. its succeeded. Thanks.
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Sam,

            Please see above comments for import file issue details.

            Regarding Medical Wellness code:

            MD wellness plans is force contingent on medical, which means whenever an employee opts for medical then employee will automatically get wellness.

            But due to approval is required for new hires, whenever an employee opts for medical, it goes to pending and wellness will not allocate automatically due to medical is not approved.

            When admin approves medical then at that time employee will get wellness and which happened due to admin approval thus system is not considering this as new hire for wellness.

            You may consider same QE code for wellness as of medical QE code. But due to force contingency and approval for new hires combined causing wellness code to be blank on file. We will analyze this further to get some sort of solution, we will update you on this by tomorrow.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Sam, Please see above comments for import file issue details. Regarding Medical Wellness code: MD wellness plans is force contingent on medical, which means whenever an employee opts for medical then employee will automatically get wellness. But due to approval is required for new hires, whenever an employee opts for medical, it goes to pending and wellness will not allocate automatically due to medical is not approved. When admin approves medical then at that time employee will get wellness and which happened due to admin approval thus system is not considering this as new hire for wellness. You may consider same QE code for wellness as of medical QE code. But due to force contingency and approval for new hires combined causing wellness code to be blank on file. We will analyze this further to get some sort of solution, we will update you on this by tomorrow.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Damion:

            I updated some testers to have MD plan. Sam lindberg is the name of the testers.

            Also, Can we have the wellness to code just like the medical plans that pend?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Damion: I updated some testers to have MD plan. Sam lindberg is the name of the testers. Also, Can we have the wellness to code just like the medical plans that pend? Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Vin:

            I would like it to have similiar logic as the medical plans.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Vin: I would like it to have similiar logic as the medical plans. Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Damion:

            Were you able to update the logic to code for the welness based on what DEV said?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Damion: Were you able to update the logic to code for the welness based on what DEV said? Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Dev:

            Can you update the logic so the wellness plan populates with the correct code.

            This needs to be done tonite. We cant wait. This is critically urgent?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Dev: Can you update the logic so the wellness plan populates with the correct code. This needs to be done tonite. We cant wait. This is critically urgent? Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Shubhankar Joshi [ shubhankar ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Shubhankar Joshi [ shubhankar ] Satya [ ID10004 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Satya:

            Can we get this completed today? This is super critical. Vinayak would probably be the best to finish it.

            thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Satya: Can we get this completed today? This is super critical. Vinayak would probably be the best to finish it. thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            this is not complete

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - this is not complete
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Satya [ ID10004 ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            satyap Satya added a comment -

            Yes Sam,

            We are working on this ticket on priority today. You will get updates by EOD for sure.

            Thanks & Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - Yes Sam, We are working on this ticket on priority today. You will get updates by EOD for sure. Thanks & Regards, Satya Prakash
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi all:

            Is this complete as the client is expecting it today? What do you need from me?

            Thank you,
            Sam.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi all: Is this complete as the client is expecting it today? What do you need from me? Thank you, Sam.
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            Hi sam lindberg

            As we discussed in the call, development team have corrected the existing data and it is exporting as required on the file.

            For any new data that will be coming in, or any updates to existing data, we are preparing a trigger that will set the data to values as required on the export file. Development of this trigger needs some more time and we also need to test it to confirm it is working correctly for all expected scenarios. We should have this ready by tomorrow (Friday).

            We have also started development for an enhancement that will handle this scenario through the application for all companies in future.

            Let me know if you need more information or if you have any concerns.

            Thanks @ Regards
            Shubhankar Joshi

            CC: Vijay Siddha, Satya, Vinayak Kulkarni, Jyoti Mayne, Rakesh Roy, Aniruddha Dev

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - Hi sam lindberg As we discussed in the call, development team have corrected the existing data and it is exporting as required on the file. For any new data that will be coming in, or any updates to existing data, we are preparing a trigger that will set the data to values as required on the export file. Development of this trigger needs some more time and we also need to test it to confirm it is working correctly for all expected scenarios. We should have this ready by tomorrow (Friday). We have also started development for an enhancement that will handle this scenario through the application for all companies in future. Let me know if you need more information or if you have any concerns. Thanks @ Regards Shubhankar Joshi CC: Vijay Siddha , Satya , Vinayak Kulkarni , Jyoti Mayne , Rakesh Roy , Aniruddha Dev
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment Copy of UND BANNER 6.16.2016.xlsx [ 20075 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Shubhankar:

            We reran the payroll file today with scenarios and we had many that did not have code. Could you please look into these? I have attached a sheet, please look at the red highlighted rows. The yellow is the wellness. and the green are to be expected with no code. I think it may be a systemic issue.

            Once the fix is complete. Can you run a new payroll file and attach in this ticket. I will send this file to the UND team.

            Thank you,
            Sam Copy of UND BANNER 6.16.2016.xlsx

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Shubhankar: We reran the payroll file today with scenarios and we had many that did not have code. Could you please look into these? I have attached a sheet, please look at the red highlighted rows. The yellow is the wellness. and the green are to be expected with no code. I think it may be a systemic issue. Once the fix is complete. Can you run a new payroll file and attach in this ticket. I will send this file to the UND team. Thank you, Sam Copy of UND BANNER 6.16.2016.xlsx
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Attachment UND.PNG [ 20106 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi All,

            The data correction done yesterday was tested for scenarios related to Plan Contingency changes and for these corrections data exported correctly on feed. After analyzing the file provided by Sam, we observe that Plan Design Eligibility has also been changed on June 15th (screenshot attached) which has caused a change in elections and also resulted into some terminations.

            UND has not configured any code for elections/terminations due to Plan Design Eligibility changes. Also we do not expect these to happen on UND going forward. However, if UND configures a code for changes due to Plan Design Eligibility Changes, the same will also start getting exported on the export file. See below.

            Today, we have implemented a trigger to handle election changes done through review changes & deployed this on 'UND For Banner Payroll Testing' on production.

            Note: We found eligibility of wellness plan on UND payroll test company and actual UND company is different so that we have changed it and made both same. You will not see wellness plan in tunnel as it is forced on Medical waiver. But you can test it on payroll file.

            Do not change eligibility of any plan to avoid this kind of issue again in future also Please create new scenarios and test them on payroll file.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi All, The data correction done yesterday was tested for scenarios related to Plan Contingency changes and for these corrections data exported correctly on feed. After analyzing the file provided by Sam, we observe that Plan Design Eligibility has also been changed on June 15th (screenshot attached) which has caused a change in elections and also resulted into some terminations. UND has not configured any code for elections/terminations due to Plan Design Eligibility changes. Also we do not expect these to happen on UND going forward. However, if UND configures a code for changes due to Plan Design Eligibility Changes, the same will also start getting exported on the export file. See below. Today, we have implemented a trigger to handle election changes done through review changes & deployed this on 'UND For Banner Payroll Testing' on production. Note: We found eligibility of wellness plan on UND payroll test company and actual UND company is different so that we have changed it and made both same. You will not see wellness plan in tunnel as it is forced on Medical waiver. But you can test it on payroll file. Do not change eligibility of any plan to avoid this kind of issue again in future also Please create new scenarios and test them on payroll file.
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi Vin:
            Also what happens when a plan elig setting is changed? Will we need to change the code?

            Can you run the payroll file for me as we need it early this morning to send to UND? Please attach in this ticket.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi Vin: Also what happens when a plan elig setting is changed? Will we need to change the code? Can you run the payroll file for me as we need it early this morning to send to UND? Please attach in this ticket. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Component/s BenAdmin [ 10000 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Labels Priority
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Damion Velasquez [ damion.velasquez ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Damion:

            can you rerun the file ASAP?

            thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Damion: can you rerun the file ASAP? thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] David Rhodes [Administrator] [ admin ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi David:

            For the payroll, currently we are seeing alot of no qe codes for scenarios that the client entered into the site. We sent the tix back to DEV and pointed out the ones that needed codes. We can't reinput the scenarios since they all came from the client.

            The only thing that came out of client test was the wellness code needed updating. But now we are getting alot more missing qe codes. I don't understand when we rerun the payroll it not stepping though the system and reassigning the missing codes.

            The client was expecting to have file today.

            Can you help to get this resolved?

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi David: For the payroll, currently we are seeing alot of no qe codes for scenarios that the client entered into the site. We sent the tix back to DEV and pointed out the ones that needed codes. We can't reinput the scenarios since they all came from the client. The only thing that came out of client test was the wellness code needed updating. But now we are getting alot more missing qe codes. I don't understand when we rerun the payroll it not stepping though the system and reassigning the missing codes. The client was expecting to have file today. Can you help to get this resolved? Thank you, Sam
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            sam lindbergDavid Rhodes

            reran file and same issues. I do not think at this point we can ask UND to re do all of the transactions they entered. We are expected to deliver a file, and have many Blank Values for QE code.

            Show
            Damion.Velasquez Damion M Velasquez added a comment - sam lindberg David Rhodes reran file and same issues. I do not think at this point we can ask UND to re do all of the transactions they entered. We are expected to deliver a file, and have many Blank Values for QE code.
            Hide
            admin David Rhodes (Inactive) added a comment -

            I just sent an email to development to get on this ASAP. I did see an email from Vinayak that said someone changed the customization and those changes led to terminations. They are no codes set for terminations done by altering the plan customization. Was this checked as the reason for the missing codes you are seeing?

            Show
            admin David Rhodes (Inactive) added a comment - I just sent an email to development to get on this ASAP. I did see an email from Vinayak that said someone changed the customization and those changes led to terminations. They are no codes set for terminations done by altering the plan customization. Was this checked as the reason for the missing codes you are seeing?
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Hi all:

            I have attached the test scenarios that und used.

            Please delete the changes and then push the file in to recreate the changes. Can you please recreate the payroll file and attach in this ticket? I need to send this to UND today as they want to review it this affternoon.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Hi all: I have attached the test scenarios that und used. Please delete the changes and then push the file in to recreate the changes. Can you please recreate the payroll file and attach in this ticket? I need to send this to UND today as they want to review it this affternoon. Thank you, Sam
            Hide
            satyap Satya added a comment -

            As discussed with Sam in call, we are creating scenario & will share test file.

            Thanks & Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - As discussed with Sam in call, we are creating scenario & will share test file. Thanks & Regards, Satya Prakash
            satyap Satya made changes -
            Assignee David Rhodes [Administrator] [ admin ] Ganesh Sadawarte [ ganesh.sadawarte ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] Satya [ ID10004 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Attachment UND_BannerPayroll061720161704.7z [ 20121 ]
            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited

            Hi sam lindberg,

            CC-Satya,Rohan J Khandave,Vinayak Kulkarni

            We have done with all scenario in attached excel now code are not populating blanks except for life as its already communicated. We generate payroll file with below scenarios.

            • New Hire Enrollment
            • Child Birth or Adoption
            • Dependent Spouse or Child Loses Coverage
            • Married
            • Death of a Dependent
            • Dependent Spouse obtains Insurance
            • Divorce
            • Admin Change

            Please find attached test payroll file UND_BannerPayroll061720161704.7z. and if you want test another you can test but please do not delete last 2 run dates.

            For New Hire Enrollment please refer below test employees
            901999082
            901999083

            Password: undpayroll

            Please check and let us know if you face any problem.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited Hi sam lindberg , CC- Satya , Rohan J Khandave , Vinayak Kulkarni We have done with all scenario in attached excel now code are not populating blanks except for life as its already communicated. We generate payroll file with below scenarios. New Hire Enrollment Child Birth or Adoption Dependent Spouse or Child Loses Coverage Married Death of a Dependent Dependent Spouse obtains Insurance Divorce Admin Change Please find attached test payroll file UND_BannerPayroll061720161704.7z . and if you want test another you can test but please do not delete last 2 run dates. For New Hire Enrollment please refer below test employees 901999082 901999083 Password: undpayroll Please check and let us know if you face any problem. Thanks, Ganesh
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Assignee Satya [ ID10004 ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Hide
            admin David Rhodes (Inactive) added a comment -

            Are you sure this is thoroughly tested? It seems every time we are told it is ready Sam and Damion take 5 seconds to find problems.

            Show
            admin David Rhodes (Inactive) added a comment - Are you sure this is thoroughly tested? It seems every time we are told it is ready Sam and Damion take 5 seconds to find problems.
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Damion M Velasquez & sam lindberg,

            QA team is still testing file also verifying scenarios mentioned into Copy of UAT OE Testing Script_06172016 (002).xlsx , client use these scenarios for file testing . QA will update there testing status once they completed scenarios mentioned into above excel file.

            CC – David Rhodes Vijay Siddha Satya Rakesh Roy Ganesh Sadawarte Vinayak Kulkarni Hrishikesh Deshpande Aniruddha Dev

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Damion M Velasquez & sam lindberg , QA team is still testing file also verifying scenarios mentioned into Copy of UAT OE Testing Script_06172016 (002).xlsx , client use these scenarios for file testing . QA will update there testing status once they completed scenarios mentioned into above excel file. CC – David Rhodes Vijay Siddha Satya Rakesh Roy Ganesh Sadawarte Vinayak Kulkarni Hrishikesh Deshpande Aniruddha Dev
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Aniruddha Dev [ aniruddha.dev ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Attachment UND File and Scenarios.zip [ 20123 ]
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            sam lindberg Damion M Velasquez

            Hi Sam,

            We have created Test scenarios on UND for Banner Payroll testing company on Production and exported Payroll file.
            Please find attached Zip UND File and Scenarios.zip for Test file and Scenarios. Password of Zip followed in Email to You and Damion.

            Our Test scenarios are as same as clients scenarios. We used different employees for our test scenarios.

            We have also tested this file from our end and observed that there is no any Blank QE code or date exporting on file. File Structure and records are proper.

            *Please refer file (Attahced in Zip) for final UAT and Ignore previous File which was attached by Ganesh. *

            Let us know if you need any details from our end.

            Thanks,
            Hrishikesh.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - sam lindberg Damion M Velasquez Hi Sam, We have created Test scenarios on UND for Banner Payroll testing company on Production and exported Payroll file. Please find attached Zip UND File and Scenarios.zip for Test file and Scenarios. Password of Zip followed in Email to You and Damion. Our Test scenarios are as same as clients scenarios. We used different employees for our test scenarios. We have also tested this file from our end and observed that there is no any Blank QE code or date exporting on file. File Structure and records are proper. *Please refer file (Attahced in Zip) for final UAT and Ignore previous File which was attached by Ganesh. * Let us know if you need any details from our end. Thanks, Hrishikesh.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Aniruddha Dev [ aniruddha.dev ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment full payroll from 1.1.2016 to 7.1.2016.xlsx [ 20124 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi

            Can you look at the file i ran, please see attachement? The major thing I noticed was the FMC and FDC did not have codes? Is this to be expected?

            The LTD, TRV, LFX did not have codes which I was expecting since they are all employer paid.

            The MD looked perfect.Great fix there. Thank you for taking the time this weekend to work on this!! I appreciate it. full payroll from 1.1.2016 to 7.1.2016.xlsx

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Can you look at the file i ran, please see attachement? The major thing I noticed was the FMC and FDC did not have codes? Is this to be expected? The LTD, TRV, LFX did not have codes which I was expecting since they are all employer paid. The MD looked perfect.Great fix there. Thank you for taking the time this weekend to work on this!! I appreciate it. full payroll from 1.1.2016 to 7.1.2016.xlsx Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Attachment full payroll from 1.1.2016 to 7.1.2016.xlsx [ 20124 ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Attachment UND_lasted_test_file_by_Dev.PNG [ 20129 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Sam,

            As discussed with you in call , we are not sure from which company this file ran ( from 01/01/2016 to 07/01/2016).
            we can see last exported file from UND test company is by us, see below

            Please note that, all the logic for these QE codes is on UND test company and not on regular UND. also records that will change due to QE going further will have QE codes on file.

            so if you export file from 01/01/2016 then you would get some records with blank QE codes as at that time we did not have QE codes logic that we have built recently.

            Please consider test file given by Hrishikesh in above comments. Let us know if you have any questions on this.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Sam, As discussed with you in call , we are not sure from which company this file ran ( from 01/01/2016 to 07/01/2016). we can see last exported file from UND test company is by us, see below Please note that, all the logic for these QE codes is on UND test company and not on regular UND. also records that will change due to QE going further will have QE codes on file. so if you export file from 01/01/2016 then you would get some records with blank QE codes as at that time we did not have QE codes logic that we have built recently. Please consider test file given by Hrishikesh in above comments. Let us know if you have any questions on this.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Hrishikesh Deshpande [ hrishikesh.deshpande ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Damion:

            Can you assess the payroll file and make sure everything is to be expected? Once its done please send it to the UND team. Please note we recreated the scenarios because the we made a code change and that only new changes would get the qe codes.

            Also can you run a full payroll file as well as changes to make sure we are solid.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Damion: Can you assess the payroll file and make sure everything is to be expected? Once its done please send it to the UND team. Please note we recreated the scenarios because the we made a code change and that only new changes would get the qe codes. Also can you run a full payroll file as well as changes to make sure we are solid. Thank you, Sam
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Attachment UND.xls [ 20246 ]
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - - edited

            sam lindberg Damion M Velasquez

            Hi Sam,

            We have found issues in two scenarios which is attached in UND.xls . Enrollment team is working on the fix for these. All other scenarios are working fine.

            Regards,
            Aniruddha Dev

            CC: Rohan J KhandaveHrishikesh DeshpandeVinayak KulkarniSatya

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - - edited sam lindberg Damion M Velasquez Hi Sam, We have found issues in two scenarios which is attached in UND.xls . Enrollment team is working on the fix for these. All other scenarios are working fine. Regards, Aniruddha Dev CC: Rohan J Khandave Hrishikesh Deshpande Vinayak Kulkarni Satya
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Sent Developments File Export.

            I deleted the last 6/16/2016 run date maintenance and see some inconsistencies between my export and the one sent in the ZIP file. I will be sending a separate email.

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Sent Developments File Export. I deleted the last 6/16/2016 run date maintenance and see some inconsistencies between my export and the one sent in the ZIP file. I will be sending a separate email.
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Hello,

            I went ahead and sent UND a file. he file itself is very very close; however I did find something that need to be resolved prior to the next time we need to run a file.

            There were 2 6/19/2016 Run Dates in the Global Template. I removed the latest and ran a file. The attached excel file has 2 TABS
            DEVS File: posted for UND to test

            Post RUN Dt Main Remove: File run this morning. Ive highlighted in Blue the records that need to have a code. Oddly enough there are rows on my fil that are not on DEVs export???
            Frecker

            Beverly

            Eileen

            Helfrich

            Linda

            S.

            Both has Supp Life plans and should get codes however they shouldn’t be exporting in this file because there is no recent change activity.

            Please advise

            Thank you

            Damion Velasquez | EDI, WORKTERRA
            Employee Benefit Specialists, Inc.
            PO Box 11657, Pleasanton, CA 94588
            PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com<damion.velasquez@ebsbenefits.com>
            [cid:image001.jpg@01D1CAD5.5151B890]<http://twitter.com/#!/workterra> [cid:image002.jpg@01D1CAD5.5151B890] <http://www.linkedin.com/company/workterra> [cid:image004.png@01D1CAD6.1AAAD370] <http://www.facebook.com/workterra> [Description: Description: http://chemtool.com/uploaded/six%20sigma%20logo.jpg] <http://en.wikipedia.org/wiki/Six_Sigma>

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Hello, I went ahead and sent UND a file. he file itself is very very close; however I did find something that need to be resolved prior to the next time we need to run a file. There were 2 6/19/2016 Run Dates in the Global Template. I removed the latest and ran a file. The attached excel file has 2 TABS DEVS File: posted for UND to test Post RUN Dt Main Remove: File run this morning. Ive highlighted in Blue the records that need to have a code. Oddly enough there are rows on my fil that are not on DEVs export??? Frecker Beverly Eileen Helfrich Linda S. Both has Supp Life plans and should get codes however they shouldn’t be exporting in this file because there is no recent change activity. Please advise Thank you Damion Velasquez | EDI, WORKTERRA Employee Benefit Specialists, Inc. PO Box 11657, Pleasanton, CA 94588 PH: 925-469-5223 | FAX: 925-460-3920 | damion.velasquez@ebsbenefits.com< damion.velasquez@ebsbenefits.com > [cid:image001.jpg@01D1CAD5.5151B890] < http://twitter.com/#!/workterra > [cid:image002.jpg@01D1CAD5.5151B890] < http://www.linkedin.com/company/workterra > [cid:image004.png@01D1CAD6.1AAAD370] < http://www.facebook.com/workterra > [Description: Description: http://chemtool.com/uploaded/six%20sigma%20logo.jpg] < http://en.wikipedia.org/wiki/Six_Sigma >
            Damion.Velasquez Damion M Velasquez made changes -
            Attachment image001.jpg [ 20248 ]
            Attachment image002.jpg [ 20249 ]
            Attachment image007.png [ 20250 ]
            Attachment image008.jpg [ 20251 ]
            Attachment image013.gif [ 20252 ]
            Attachment image004.png [ 20253 ]
            Attachment image006.jpg [ 20254 ]
            Attachment image009.jpg [ 20255 ]
            Attachment image010.jpg [ 20256 ]
            Attachment image012.png [ 20257 ]
            Attachment Banner 6.20.16.xlsx [ 20258 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Attachment Change In Rate.png [ 20263 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Attachment Import Enrollment.png [ 20264 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Comment [ Hi [~Damion.Velasquez]

            CC- [~sam.lindberg@ebsbenefits.com],[~Vinayak.Kulkarni],[~rohan.khandave],[~hrishikesh.deshpande]

            Please find below details.

            *Concern* :File run this morning. Ive highlighted in Blue the records that need to have a code. Oddly enough there are rows on my fil that are not on DEVs export???

            *Cause*: As per analysis we found that new rates get assign by service on *2016-06-20* and on *QE Illusions Banner Employee Supp Life* template has cost field mapped so we export rate changes on file.
            As we check this employee enrolled in Supplemental Life plan on Jan-2016 with import enrollment and Qualifying Event field value are not configured for Import Enrollment in Data Transformation On Template. Due to this blank QE code exported on file. Please find attachement.
             !Import Enrollment.png|thumbnail!
            Employees
            # Frecker Beverly Eileen (900089448)
            # Helfrich Linda S (900343384)

            *Correction*: Need to configure value for Import Enrollment in Data Transformation On Template.

            *Note*: similer issue was reported by [~aniruddha.dev] in [^UND.xls] previously but this was for change in rate. please check blanks DTS values and configure them accordingly.

            Please let us know if you require more details on this.

            Thanks,
            Ganesh ]
            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment -

            Hi Damion M Velasquez

            CC- sam lindberg,Vinayak Kulkarni,Rohan J Khandave,Hrishikesh Deshpande

            Please find below details.

            Concern :File run this morning. Ive highlighted in Blue the records that need to have a code. Oddly enough there are rows on my fil that are not on DEVs export???

            Cause: As per analysis we found that new rates get assign by service on 2016-06-20 and on QE Illusions Banner Employee Supp Life template has cost field map so we export rate changes on file. Qualifying Event field value are not configured for Rate In Change in Data Transformation On Template. Due to this blank QE code exported on file. Please find attachment.

            Employees

            1. Frecker Beverly Eileen (900089448)
            2. Helfrich Linda S (900343384)

            Correction: Need to configure value for Rate In Change in Data Transformation On Template.

            Note: Same issue was reported by Aniruddha Dev in UND.xls previously please check issue no 2 in file.

            Please let us know if you require more details on this.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - Hi Damion M Velasquez CC- sam lindberg , Vinayak Kulkarni , Rohan J Khandave , Hrishikesh Deshpande Please find below details. Concern :File run this morning. Ive highlighted in Blue the records that need to have a code. Oddly enough there are rows on my fil that are not on DEVs export??? Cause : As per analysis we found that new rates get assign by service on 2016-06-20 and on QE Illusions Banner Employee Supp Life template has cost field map so we export rate changes on file. Qualifying Event field value are not configured for Rate In Change in Data Transformation On Template. Due to this blank QE code exported on file. Please find attachment. Employees Frecker Beverly Eileen (900089448) Helfrich Linda S (900343384) Correction : Need to configure value for Rate In Change in Data Transformation On Template. Note : Same issue was reported by Aniruddha Dev in UND.xls previously please check issue no 2 in file. Please let us know if you require more details on this. Thanks, Ganesh
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Ganesh SadawarteGanesh SadawarteAniruddha Dev

            Thank you for the update. I also see both employees are hitting an an age band and both have birthdays 6/20: So a default of Null is expected as this is not related to QE. The File looks great; we appreciate your hard work and efforts. Although the client has not yet 'approved', the file looks good, and supports what they requested during this implementation. The file is now with the Client UAT, and we will await results.

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Ganesh Sadawarte Ganesh Sadawarte Aniruddha Dev Thank you for the update. I also see both employees are hitting an an age band and both have birthdays 6/20: So a default of Null is expected as this is not related to QE. The File looks great; we appreciate your hard work and efforts. Although the client has not yet 'approved', the file looks good, and supports what they requested during this implementation. The file is now with the Client UAT, and we will await results.
            Damion.Velasquez Damion M Velasquez made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Damion

            Can you code the HRB plan code to be a null value?

            Here's the email from mary.

            Hi Sam,
            On the Banner payroll file, plan HRB has an 01 option code where the option code for that plan should always be null. I know that we went back on forth on this plan and option code; however Banner now expects the option code to be null. The non-null option codes for HRB are causing those records to error out. Can you fix that?
            Thanks.
            Mary

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Damion Can you code the HRB plan code to be a null value? Here's the email from mary. Hi Sam, On the Banner payroll file, plan HRB has an 01 option code where the option code for that plan should always be null. I know that we went back on forth on this plan and option code; however Banner now expects the option code to be null. The non-null option codes for HRB are causing those records to error out. Can you fix that? Thanks. Mary Thank you, Sam
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited

            Assigning to you to Hardcode HRB to be Null. This is a new request. We need it ASAP. Tomorrow would be great.

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - - edited Assigning to you to Hardcode HRB to be Null. This is a new request. We need it ASAP. Tomorrow would be great.
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vijay Siddha [ vijays ]
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            Hi Vijay Siddha, just had a call with sam lindberg and they have a new request to hard code the HRB Plan Code value to be a NULL.

            Could you check with the developement team if this is possible? Customer is looking forward to having this feature by Thursday morning PST.

            CC: Satya, Rakesh Roy, David Rhodes, Vinayak Kulkarni, Ganesh Sadawarte, Aniruddha Dev, Hrishikesh Deshpande

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - Hi Vijay Siddha , just had a call with sam lindberg and they have a new request to hard code the HRB Plan Code value to be a NULL. Could you check with the developement team if this is possible? Customer is looking forward to having this feature by Thursday morning PST. CC: Satya , Rakesh Roy , David Rhodes , Vinayak Kulkarni , Ganesh Sadawarte , Aniruddha Dev , Hrishikesh Deshpande
            Hide
            admin David Rhodes (Inactive) added a comment -

            This can be done – if this is not going to be ready by tomorrow then someone needs to call me and explain why.

            Show
            admin David Rhodes (Inactive) added a comment - This can be done – if this is not going to be ready by tomorrow then someone needs to call me and explain why.
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi DAve:

            Damion was able to update it. The client will be entering scenarios today and we will rerun a file.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi DAve: Damion was able to update it. The client will be entering scenarios today and we will rerun a file. Thank you, Sam
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            The Option codes in the below templates have been made NULL for HRB. This was a fixed value of '01' I removed.

            sam lindberg I will communicate with Mary @UND to see if she wants re-do file with NULL for those records.

            CC David RhodesShubhankar JoshiVijay SiddhaSatyaRakesh RoyGanesh SadawarteVinayak KulkarniAniruddha Dev

            Show
            Damion.Velasquez Damion M Velasquez added a comment - The Option codes in the below templates have been made NULL for HRB. This was a fixed value of '01' I removed. sam lindberg I will communicate with Mary @UND to see if she wants re-do file with NULL for those records. CC David Rhodes Shubhankar Joshi Vijay Siddha Satya Rakesh Roy Ganesh Sadawarte Vinayak Kulkarni Aniruddha Dev
            Hide
            admin David Rhodes (Inactive) added a comment -

            Excellent!

            Show
            admin David Rhodes (Inactive) added a comment - Excellent!
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            From: Damion Velasquez
            Sent: Wednesday, June 22, 2016 8:31 AM
            To: 'Mary Kocks'; Jim Heide
            Cc: Steven Cohen; Sam Lindberg; David Rhodes
            Subject: RE: HRB and 01 Option Code

            Good Morning Mary

            This is no problem. I’ve already removed the coding for the HRB-HSA plan Option code. You will see a Null Value for any record that passes in the Payroll File with this benefit. I can send a new file omitting this code today, but wanted to touch-base to see if you would rather us wait until more transaction scenarios are added to WORKTERRA.

            Please advise

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - From: Damion Velasquez Sent: Wednesday, June 22, 2016 8:31 AM To: 'Mary Kocks'; Jim Heide Cc: Steven Cohen; Sam Lindberg; David Rhodes Subject: RE: HRB and 01 Option Code Good Morning Mary This is no problem. I’ve already removed the coding for the HRB-HSA plan Option code. You will see a Null Value for any record that passes in the Payroll File with this benefit. I can send a new file omitting this code today, but wanted to touch-base to see if you would rather us wait until more transaction scenarios are added to WORKTERRA. Please advise Thank you
            vijays Vijay Siddha (Inactive) made changes -
            Assignee Vijay Siddha [ vijays ] Shubhankar Joshi [ shubhankar ]
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            Hi sam lindberg, assigning back to you as the NULL HRB Code value request has already been completed by Damion M Velasquez.

            Let us know if there is anything required from us on this ticket.

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - Hi sam lindberg , assigning back to you as the NULL HRB Code value request has already been completed by Damion M Velasquez . Let us know if there is anything required from us on this ticket.
            shubhankar Shubhankar Joshi (Inactive) made changes -
            Assignee Shubhankar Joshi [ shubhankar ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            jyoti.mayne Jyoti Mayne made changes -
            Link This issue relates to WT-3178 [ WT-3178 ]
            jyoti.mayne Jyoti Mayne made changes -
            Link This issue relates to WT-3179 [ WT-3179 ]
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            Hi Damion M Velasquez,

            We were doing some testing on our end to ensure file is having proper QE codes and have exported the banner file from our test company to verify if there any changes/records on file.

            We got few records on file which are changed since last export, and there are few with blank QE codes.
            Actually these changes are not done by AE or client and they are done by midnight services.
            We had a call with Sam about some queries related to blank QE codes records, below are the two kind of changes for which file has blank QE codes.

            1) Change In Rate
            For example, Employee Darlene Hampton has rate change on Critical illness Plan due to age band changed on 06/21.

            2) Overage Dependent
            Two overage dependents automatically dropped from coverage due to age crossed the max age allowed on plan.
            For example, Venter Clea for Employee Venter Christine

            For above two scenarios, QE code is not configured on the templates so it will export blank on the file.
            Please let us know what QE codes needs to be configured on the templates so that QE codes will appear for above scenarios ?

            Thanks & Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - Hi Damion M Velasquez , We were doing some testing on our end to ensure file is having proper QE codes and have exported the banner file from our test company to verify if there any changes/records on file. We got few records on file which are changed since last export, and there are few with blank QE codes. Actually these changes are not done by AE or client and they are done by midnight services. We had a call with Sam about some queries related to blank QE codes records, below are the two kind of changes for which file has blank QE codes. 1) Change In Rate For example, Employee Darlene Hampton has rate change on Critical illness Plan due to age band changed on 06/21. 2) Overage Dependent Two overage dependents automatically dropped from coverage due to age crossed the max age allowed on plan. For example, Venter Clea for Employee Venter Christine For above two scenarios, QE code is not configured on the templates so it will export blank on the file. Please let us know what QE codes needs to be configured on the templates so that QE codes will appear for above scenarios ? Thanks & Regards, Aniruddha Dev
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Aniruddha Dev I think we are okay. You are correct that those updates by midnight services are non QE Related so it will be expected that NULL is passing for that record

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Aniruddha Dev I think we are okay. You are correct that those updates by midnight services are non QE Related so it will be expected that NULL is passing for that record Thank you
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            From: Damion Velasquez
            Sent: Friday, June 24, 2016 4:17 PM
            To: 'Steven Cohen'
            Cc: 'Jim Heide'; 'Mary Kocks'; Sam Lindberg; 'Tamara Freeman'; David Rhodes
            Subject: RE: New Payroll File Request from Pre-Production

            Hello Steven,

            I ran/posted the file; all scenarios on the Excel file appear on the Export as well ALL QE Codes populated. Please note that there are records that do not have QE codes but the transactions themselves are un-related to QE. Server Admin Updates. Please let us know of any Feedback. Have an Excellent Weekend!

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - From: Damion Velasquez Sent: Friday, June 24, 2016 4:17 PM To: 'Steven Cohen' Cc: 'Jim Heide'; 'Mary Kocks'; Sam Lindberg; 'Tamara Freeman'; David Rhodes Subject: RE: New Payroll File Request from Pre-Production Hello Steven, I ran/posted the file; all scenarios on the Excel file appear on the Export as well ALL QE Codes populated. Please note that there are records that do not have QE codes but the transactions themselves are un-related to QE. Server Admin Updates. Please let us know of any Feedback. Have an Excellent Weekend! Thank you
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Damion:

            Please run in parallel for the next few weeks to ensure that we are receiving everything back in the system. Then when UND gives us the signal we will just run from us.

            Excellent work!!

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Damion: Please run in parallel for the next few weeks to ensure that we are receiving everything back in the system. Then when UND gives us the signal we will just run from us. Excellent work!! Thank you, Sam
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Vinayak Kulkarnisam lindbergDavid RhodesCindy Wibbing

            Vinayak hope you are well. Can you help move the Templates down to the Production Client?
            Production Client (FROM): UND For Banner Payroll Testing
            Company level Templates(20):
            QE Illusions Banner Employee Supp Life
            QE Illusions Banner Child Dependent on Employee Life
            QE Illusions Banner Spouse Dependent Life
            QE Illusions Banner Accident Employee Paid
            QE Illusions Banner CI Employee
            QE Illusions Banner Payroll
            QE Illusions Banner HRA
            QE Illusions Banner Accident Employer Paid
            QE Illusions Banner CI Employer
            QE Illusions Banner Basic Life LFX
            QE Illusions Banner Spouse Dependent Life_Term
            QE Illusions Banner Employee Supp Life_Term
            QE Illusions Banner Child Dependent on Employee Life_Term
            QE Illusions Banner Accident Employee Paid_Term
            QE Illusions Banner CI Employee_Term
            QE Illusions Banner HRA_Term
            QE Illusions Banner Accident Employer Paid_Term
            QE Illusions Banner CI Employer_Term
            QE Illusions Banner Basic Life LFX_Term
            QE Illusions Banner Payroll_Term

            Please move(TO)
            Production Client: UND

            Please name the templates(20) as follows:
            QE Illusions Banner Employee Supp Life-2016
            QE Illusions Banner Child Dependent on Employee Life-2016
            QE Illusions Banner Spouse Dependent Life-2016
            QE Illusions Banner Accident Employee Paid-2016
            QE Illusions Banner CI Employee-2016
            QE Illusions Banner Payroll-2016
            QE Illusions Banner HRA-2016
            QE Illusions Banner Accident Employer Paid-2016
            QE Illusions Banner CI Employer-2016
            QE Illusions Banner Basic Life LFX-2016
            QE Illusions Banner Spouse Dependent Life_Term-2016
            QE Illusions Banner Employee Supp Life_Term-2016
            QE Illusions Banner Child Dependent on Employee Life_Term-2016
            QE Illusions Banner Accident Employee Paid_Term-2016
            QE Illusions Banner CI Employee_Term-2016
            QE Illusions Banner HRA_Term-2016
            QE Illusions Banner Accident Employer Paid_Term-2016
            QE Illusions Banner CI Employer_Term-2016
            QE Illusions Banner Basic Life LFX_Term-2016
            QE Illusions Banner Payroll_Term-2016

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Vinayak Kulkarni sam lindberg David Rhodes Cindy Wibbing Vinayak hope you are well. Can you help move the Templates down to the Production Client? Production Client (FROM): UND For Banner Payroll Testing Company level Templates(20): QE Illusions Banner Employee Supp Life QE Illusions Banner Child Dependent on Employee Life QE Illusions Banner Spouse Dependent Life QE Illusions Banner Accident Employee Paid QE Illusions Banner CI Employee QE Illusions Banner Payroll QE Illusions Banner HRA QE Illusions Banner Accident Employer Paid QE Illusions Banner CI Employer QE Illusions Banner Basic Life LFX QE Illusions Banner Spouse Dependent Life_Term QE Illusions Banner Employee Supp Life_Term QE Illusions Banner Child Dependent on Employee Life_Term QE Illusions Banner Accident Employee Paid_Term QE Illusions Banner CI Employee_Term QE Illusions Banner HRA_Term QE Illusions Banner Accident Employer Paid_Term QE Illusions Banner CI Employer_Term QE Illusions Banner Basic Life LFX_Term QE Illusions Banner Payroll_Term Please move(TO) Production Client: UND Please name the templates(20) as follows: QE Illusions Banner Employee Supp Life-2016 QE Illusions Banner Child Dependent on Employee Life-2016 QE Illusions Banner Spouse Dependent Life-2016 QE Illusions Banner Accident Employee Paid-2016 QE Illusions Banner CI Employee-2016 QE Illusions Banner Payroll-2016 QE Illusions Banner HRA-2016 QE Illusions Banner Accident Employer Paid-2016 QE Illusions Banner CI Employer-2016 QE Illusions Banner Basic Life LFX-2016 QE Illusions Banner Spouse Dependent Life_Term-2016 QE Illusions Banner Employee Supp Life_Term-2016 QE Illusions Banner Child Dependent on Employee Life_Term-2016 QE Illusions Banner Accident Employee Paid_Term-2016 QE Illusions Banner CI Employee_Term-2016 QE Illusions Banner HRA_Term-2016 QE Illusions Banner Accident Employer Paid_Term-2016 QE Illusions Banner CI Employer_Term-2016 QE Illusions Banner Basic Life LFX_Term-2016 QE Illusions Banner Payroll_Term-2016
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Damion, yes we will do it and update you once it is done.

            Aniruddha Dev Can we take this on priority?

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Damion, yes we will do it and update you once it is done. Aniruddha Dev Can we take this on priority?
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Mandar Kulkarni Please take this ahead.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Mandar Kulkarni Please take this ahead.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Mandar Kulkarni [ mandark ]
            Hide
            mandark Mandar Kulkarni (Inactive) added a comment -

            Hi Hrishikesh Deshpande,

            This week the team bandwidth is very lean, can someone from your team take this up, please?

            Regards,
            Mandar

            Show
            mandark Mandar Kulkarni (Inactive) added a comment - Hi Hrishikesh Deshpande , This week the team bandwidth is very lean, can someone from your team take this up, please? Regards, Mandar
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Hello Hrishikesh Deshpande

            Is there an ETA for this? We are under a strict time line to deliver this to the client, as well I will need ample time to run the file. This will allow us to insure the file meets the clients needs.

            Thank you and have a good weekend

            sam lindberg David Rhodes

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Hello Hrishikesh Deshpande Is there an ETA for this? We are under a strict time line to deliver this to the client, as well I will need ample time to run the file. This will allow us to insure the file meets the clients needs. Thank you and have a good weekend sam lindberg David Rhodes
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Damion M Velasquez

            Hi Damion,

            We have moved templates on UND Company on production. As per your comments we have given names to template, Please find below details..

            *Group Template : *

            QE Illusions Banner Payroll-2016

            *Company Level Templates : *

            QE Illusions Banner Employee Supp Life-2016
            QE Illusions Banner Child Dependent on Employee Life-2016
            QE Illusions Banner Spouse Dependent Life-2016
            QE Illusions Banner Accident Employee Paid-2016
            QE Illusions Banner CI Employee-2016
            QE Illusions Banner Payroll-2016
            QE Illusions Banner HRA-2016
            QE Illusions Banner Accident Employer Paid-2016
            QE Illusions Banner CI Employer-2016
            QE Illusions Banner Basic Life LFX-2016
            QE Illusions Banner Spouse Dependent Life_Term-2016
            QE Illusions Banner Employee Supp Life_Term-2016
            QE Illusions Banner Child Dependent on Employee Life_Term-2016
            QE Illusions Banner Accident Employee Paid_Term-2016
            QE Illusions Banner CI Employee_Term-2016
            QE Illusions Banner HRA_Term-2016
            QE Illusions Banner Accident Employer Paid_Term-2016
            QE Illusions Banner CI Employer_Term-2016
            QE Illusions Banner Basic Life LFX_Term-2016
            QE Illusions Banner Payroll_Term-2016

            *Note *: We have not scheduled this template.

            Please go through Group and Company templates and let us know if anything needs to be updated.

            Thanks,
            Hrishikesh.

            CC: sam lindberg

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Damion M Velasquez Hi Damion, We have moved templates on UND Company on production. As per your comments we have given names to template, Please find below details.. *Group Template : * QE Illusions Banner Payroll-2016 *Company Level Templates : * QE Illusions Banner Employee Supp Life-2016 QE Illusions Banner Child Dependent on Employee Life-2016 QE Illusions Banner Spouse Dependent Life-2016 QE Illusions Banner Accident Employee Paid-2016 QE Illusions Banner CI Employee-2016 QE Illusions Banner Payroll-2016 QE Illusions Banner HRA-2016 QE Illusions Banner Accident Employer Paid-2016 QE Illusions Banner CI Employer-2016 QE Illusions Banner Basic Life LFX-2016 QE Illusions Banner Spouse Dependent Life_Term-2016 QE Illusions Banner Employee Supp Life_Term-2016 QE Illusions Banner Child Dependent on Employee Life_Term-2016 QE Illusions Banner Accident Employee Paid_Term-2016 QE Illusions Banner CI Employee_Term-2016 QE Illusions Banner HRA_Term-2016 QE Illusions Banner Accident Employer Paid_Term-2016 QE Illusions Banner CI Employer_Term-2016 QE Illusions Banner Basic Life LFX_Term-2016 QE Illusions Banner Payroll_Term-2016 *Note *: We have not scheduled this template. Please go through Group and Company templates and let us know if anything needs to be updated. Thanks, Hrishikesh. CC: sam lindberg
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Mandar Kulkarni [ mandark ] Damion Velasquez [ damion.velasquez ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            Hi sam lindberg, Damion M Velasquez

            The team has moved these templates to the UND company on production, however before beginning to use these templates, the existing data on production environment needs to be corrected so that blank QE codes do not get exported.

            Also the trigger needs to be set up on the production UND company (currently on UND Test Company) to handle the different scenarios and export out the correct QE codes for them.

            The team is waiting for your approval to push the correction script and the trigger from the UND Test Company to main UND on production environment. Could you provide the same?

            Also, there is another scenario which is being handled in enhancement WT-3274 and is currently under testing. The fix shall be moved to production by 07/15 depending upon the testing outcome.

            Thanks & Regards
            Shubhankar Joshi

            CC: Satya, Vijay Siddha, Rakesh Roy, Aniruddha Dev, Hrishikesh Deshpande, Vinayak Kulkarni

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - Hi sam lindberg , Damion M Velasquez The team has moved these templates to the UND company on production, however before beginning to use these templates, the existing data on production environment needs to be corrected so that blank QE codes do not get exported. Also the trigger needs to be set up on the production UND company (currently on UND Test Company) to handle the different scenarios and export out the correct QE codes for them. The team is waiting for your approval to push the correction script and the trigger from the UND Test Company to main UND on production environment. Could you provide the same? Also, there is another scenario which is being handled in enhancement WT-3274 and is currently under testing. The fix shall be moved to production by 07/15 depending upon the testing outcome. Thanks & Regards Shubhankar Joshi CC: Satya , Vijay Siddha , Rakesh Roy , Aniruddha Dev , Hrishikesh Deshpande , Vinayak Kulkarni
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            Hi Shubhankar:

            Please move over all necessary scripts and data over to prod.

            Thank you,
            Sam

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - Hi Shubhankar: Please move over all necessary scripts and data over to prod. Thank you, Sam
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Assignee Damion Velasquez [ damion.velasquez ] Shubhankar Joshi [ shubhankar ]
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            Hi sam lindberg, Vijay Siddha this issue was missed earlier due to it's status already set as Production Complete.

            Rohan J Khandave, could you please move the templates and scripts to the main company on production?

            CC: Satya, Vijay Siddha, Rakesh Roy, Hrishikesh Deshpande, Aniruddha Dev, Jyoti Mayne, Vinayak Kulkarni

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - Hi sam lindberg , Vijay Siddha this issue was missed earlier due to it's status already set as Production Complete. Rohan J Khandave , could you please move the templates and scripts to the main company on production? CC: Satya , Vijay Siddha , Rakesh Roy , Hrishikesh Deshpande , Aniruddha Dev , Jyoti Mayne , Vinayak Kulkarni
            shubhankar Shubhankar Joshi (Inactive) made changes -
            Assignee Shubhankar Joshi [ shubhankar ] Rohan Khandave [ rohan.khandave ]
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Shubhankar Joshi,

            We templates are moved on production.

            Please co-ordinate with enrollment team for script and data correction.

            So we can start feed testing.

            CC – Jyoti Mayne Vinayak Kulkarni

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Shubhankar Joshi , We templates are moved on production. Please co-ordinate with enrollment team for script and data correction. So we can start feed testing. CC – Jyoti Mayne Vinayak Kulkarni
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Shubhankar Joshi [ shubhankar ]
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Hide
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment -

            opening

            Show
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) added a comment - opening
            sam.lindberg@ebsbenefits.com sam lindberg (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            Hide
            shubhankar Shubhankar Joshi (Inactive) added a comment -

            sam lindberg, as discussed over our call, we are working on this and will be followed by QA Testing.

            Jyoti Mayne, please proceed with the triggers and data correction on the main company.

            Aniruddha Dev, please plan for the testing of this on main company after Jyoti has moved the scripts to the main company.

            CC: Vijay Siddha, Satya, Rakesh Roy, Rohan J Khandave, Vinayak Kulkarni

            Show
            shubhankar Shubhankar Joshi (Inactive) added a comment - sam lindberg , as discussed over our call, we are working on this and will be followed by QA Testing. Jyoti Mayne , please proceed with the triggers and data correction on the main company. Aniruddha Dev , please plan for the testing of this on main company after Jyoti has moved the scripts to the main company. CC: Vijay Siddha , Satya , Rakesh Roy , Rohan J Khandave , Vinayak Kulkarni
            shubhankar Shubhankar Joshi (Inactive) made changes -
            Assignee Shubhankar Joshi [ shubhankar ] Jyoti Mayne [ jyoti.mayne ]
            Hide
            vijays Vijay Siddha (Inactive) added a comment -

            Hi Shubhankar,

            Thanks for updates, going forward please keep eye on comments in ticket
            along with ticket status. So that we don’t miss such tickets.

            Regards

            Vijay

            From: Shubhankar Joshi (JIRA) jira@workterra.atlassian.net
            Sent: Monday, July 11, 2016 8:32 PM
            To: vijays@harbingergroup.com
            Subject: [JIRA] Shubhankar Joshi mentioned you on WT-1763 (JIRA)

            <https://workterra.atlassian.net/secure/ViewProfile.jspa?name=shubhankar>
            Shubhankar Joshi mentioned you on
            <https://workterra.atlassian.net/browse/WT-1763> BugWT-1763

            <https://workterra.atlassian.net/browse/WT-1763> Re: University of Notre
            Dame-QE Banner Payroll

            <https://workterra.atlassian.net/secure/ViewProfile.jspa?name=sam.lindberg%40ebsbenefits.com>sam lindberg, as discussed over our call, we are working on this and will befollowed by QA Testing. <https://workterra.atlassian.net/secure/ViewProfile.jspa?name=jyoti.mayne>Jyoti Mayne, please proceed with the triggers and data correction on themain company. <https://workterra.atlassian.net/secure/ViewProfile.jspa?name=aniruddha.dev> Aniruddha Dev, please plan for the testing of this on main company afterJyoti has moved the scripts to the main company.CC: <https://workterra.atlassian.net/secure/ViewProfile.jspa?name=vijays>Vijay Siddha,<https://workterra.atlassian.net/secure/ViewProfile.jspa?name=satyap> Satya,<https://workterra.atlassian.net/secure/ViewProfile.jspa?name=rakeshr>Rakesh Roy,<https://workterra.atlassian.net/secure/ViewProfile.jspa?name=rohan.khandave> Rohan Khandave,<https://workterra.atlassian.net/secure/ViewProfile.jspa?name=Vinayak.Kulkarni> Vinayak Kulkarni <https://workterra.atlassian.net/browse/WT-1763#add-comment> Add Comment <https://workterra.atlassian.net/browse/WT-1763#add-comment> Add CommentThis message was sent by Atlassian JIRA (v1000.141.1#100004-sha1:5b3de17)Atlassian logo

            Show
            vijays Vijay Siddha (Inactive) added a comment - Hi Shubhankar, Thanks for updates, going forward please keep eye on comments in ticket along with ticket status. So that we don’t miss such tickets. Regards Vijay From: Shubhankar Joshi (JIRA) jira@workterra.atlassian.net Sent: Monday, July 11, 2016 8:32 PM To: vijays@harbingergroup.com Subject: [JIRA] Shubhankar Joshi mentioned you on WT-1763 (JIRA) < https://workterra.atlassian.net/secure/ViewProfile.jspa?name=shubhankar > Shubhankar Joshi mentioned you on < https://workterra.atlassian.net/browse/WT-1763 > BugWT-1763 < https://workterra.atlassian.net/browse/WT-1763 > Re: University of Notre Dame-QE Banner Payroll < https://workterra.atlassian.net/secure/ViewProfile.jspa?name=sam.lindberg%40ebsbenefits.com >sam lindberg, as discussed over our call, we are working on this and will befollowed by QA Testing. < https://workterra.atlassian.net/secure/ViewProfile.jspa?name=jyoti.mayne >Jyoti Mayne, please proceed with the triggers and data correction on themain company. < https://workterra.atlassian.net/secure/ViewProfile.jspa?name=aniruddha.dev > Aniruddha Dev, please plan for the testing of this on main company afterJyoti has moved the scripts to the main company.CC: < https://workterra.atlassian.net/secure/ViewProfile.jspa?name=vijays >Vijay Siddha,< https://workterra.atlassian.net/secure/ViewProfile.jspa?name=satyap > Satya,< https://workterra.atlassian.net/secure/ViewProfile.jspa?name=rakeshr >Rakesh Roy,< https://workterra.atlassian.net/secure/ViewProfile.jspa?name=rohan.khandave > Rohan Khandave,< https://workterra.atlassian.net/secure/ViewProfile.jspa?name=Vinayak.Kulkarni > Vinayak Kulkarni < https://workterra.atlassian.net/browse/WT-1763#add-comment > Add Comment < https://workterra.atlassian.net/browse/WT-1763#add-comment > Add CommentThis message was sent by Atlassian JIRA (v1000.141.1#100004-sha1:5b3de17)Atlassian logo
            vijays Vijay Siddha (Inactive) made changes -
            Attachment image002.png [ 21701 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Aniruddha Dev,

            Trigger and data correction changes are done on main UND company. Please verify.

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Aniruddha Dev , Trigger and data correction changes are done on main UND company. Please verify.
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Aniruddha Dev [ aniruddha.dev ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            Hi sam lindberg,

            Triggers are executed on UND company on Production . Testing is in progress. We will keep you updated with the testing status.

            Damion M Velasquez Can you please let us know what base run date need to set on QE Illusions Banner Payroll-2016 Group Template on Production ?

            Thanks & Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - Hi sam lindberg , Triggers are executed on UND company on Production . Testing is in progress. We will keep you updated with the testing status. Damion M Velasquez Can you please let us know what base run date need to set on QE Illusions Banner Payroll-2016 Group Template on Production ? Thanks & Regards, Aniruddha Dev
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            Aniruddha Devsam lindberg

            Base Rund Date maintenance should be 6/24/2016. if you can add in 6/20/2016 & 6/24/2016 this would be preferred as it compensates for the changes made in testing

            Thank you

            Show
            Damion.Velasquez Damion M Velasquez added a comment - Aniruddha Dev sam lindberg Base Rund Date maintenance should be 6/24/2016. if you can add in 6/20/2016 & 6/24/2016 this would be preferred as it compensates for the changes made in testing Thank you
            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited

            sam lindberg

            Hi Aniruddha Dev,

            CC- Rohan J Khandave,Vinayak Kulkarni

            We have added 6/24/2016 base run date to QE Illusions Banner Payroll-2016 global template and all company level templates which included into this global template.

            Please check and let us know if you face any issue.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited sam lindberg Hi Aniruddha Dev , CC- Rohan J Khandave , Vinayak Kulkarni We have added 6/24/2016 base run date to QE Illusions Banner Payroll-2016 global template and all company level templates which included into this global template. Please check and let us know if you face any issue. Thanks, Ganesh
            Hide
            aniruddha.dev Aniruddha Dev (Inactive) added a comment -

            Hi Rohan J Khandave,

            CC: Ganesh Sadawarte Vinayak Kulkarni Hrishikesh Deshpande

            We verified this on UND Company on production and found that base run date 6/24/2016 is set on 11 Company level templates only. There are total 20 company level templates selected on QE Illusions Banner Payroll-2016 global. Can you please set the same run date for remaining 9 Company level templates on UND Production ?

            Regards,
            Aniruddha Dev

            Show
            aniruddha.dev Aniruddha Dev (Inactive) added a comment - Hi Rohan J Khandave , CC: Ganesh Sadawarte Vinayak Kulkarni Hrishikesh Deshpande We verified this on UND Company on production and found that base run date 6/24/2016 is set on 11 Company level templates only. There are total 20 company level templates selected on QE Illusions Banner Payroll-2016 global. Can you please set the same run date for remaining 9 Company level templates on UND Production ? Regards, Aniruddha Dev
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Assignee Aniruddha Dev [ aniruddha.dev ] Rohan Khandave [ rohan.khandave ]
            Hide
            rohan.khandave Rohan J Khandave (Inactive) added a comment -

            Hello Vinayak Kulkarni,

            Please check comments from Aniruddha Dev.

            Show
            rohan.khandave Rohan J Khandave (Inactive) added a comment - Hello Vinayak Kulkarni , Please check comments from Aniruddha Dev .
            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Assignee Rohan Khandave [ rohan.khandave ] Vinayak Kulkarni [ vinayak.kulkarni ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Aniruddha,

            We have added base date as 06/24/2016 to all 20 templates, please check.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Aniruddha, We have added base date as 06/24/2016 to all 20 templates, please check.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            sam lindberg Damion M Velasquez

            Hi Sam/Damion,

            We have set Run Date maintenance as 6/24/2016 on all templates.
            Now on Group Level Feed Export all changes after 06/24/2016 will export on file.

            *Note : *We have tested this file from our end and confirmed that records are exporting proper.
            There are 106 records are exported on our Test file which are changes records after 06/24.
            All changes done due to Import Enrollment or Change In Rate or Plan Design Eligibility Change so No QE code exporting on file. QE code will export on file only If there is change due to Qualifying event.

            This file is good to go now.

            Let us know in case of any questions.

            Thanks,
            Hrishikesh.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - sam lindberg Damion M Velasquez Hi Sam/Damion, We have set Run Date maintenance as 6/24/2016 on all templates. Now on Group Level Feed Export all changes after 06/24/2016 will export on file. *Note : *We have tested this file from our end and confirmed that records are exporting proper. There are 106 records are exported on our Test file which are changes records after 06/24. All changes done due to Import Enrollment or Change In Rate or Plan Design Eligibility Change so No QE code exporting on file. QE code will export on file only If there is change due to Qualifying event. This file is good to go now. Let us know in case of any questions. Thanks, Hrishikesh.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Hrishikesh Deshpande [ hrishikesh.deshpande ] sam lindberg [ sam.lindberg@ebsbenefits.com ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            sam lindberg
            Confirm with Steve, I will go in and replace the existing file with the new QE coded Banner File

            Show
            Damion.Velasquez Damion M Velasquez added a comment - sam lindberg Confirm with Steve, I will go in and replace the existing file with the new QE coded Banner File
            Hide
            Damion.Velasquez Damion M Velasquez added a comment - - edited

            ill wait for tonights file to post at 5. tomorrow morning Ill post the QE file, communicate, get Steve confirm and then switch the schedules.

            sam lindbergCindy WibbingDamion M Velasquez

            Show
            Damion.Velasquez Damion M Velasquez added a comment - - edited ill wait for tonights file to post at 5. tomorrow morning Ill post the QE file, communicate, get Steve confirm and then switch the schedules. sam lindberg Cindy Wibbing Damion M Velasquez
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            sam lindberg
            File is done. I took the existing feed and reelected the Grouped Templates. Ill send a note to UND of the same

            Thnak you

            Cindy Wibbing

            Show
            Damion.Velasquez Damion M Velasquez added a comment - sam lindberg File is done. I took the existing feed and reelected the Grouped Templates. Ill send a note to UND of the same Thnak you Cindy Wibbing
            Damion.Velasquez Damion M Velasquez made changes -
            Resolution Fixed [ 1 ] Done [ 10000 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Resolution Done [ 10000 ] Fixed [ 1 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Assignee sam lindberg [ sam.lindberg@ebsbenefits.com ] Damion Velasquez [ damion.velasquez ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            Damion.Velasquez Damion M Velasquez made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            UND will Authorize our sending Carrier files after their Open Enrollment. They are currently sending manual updates to the carrier and updating WORKTERRA
            Will also send OE Payroll File once UND gives us the go ahead

            Show
            Damion.Velasquez Damion M Velasquez added a comment - UND will Authorize our sending Carrier files after their Open Enrollment. They are currently sending manual updates to the carrier and updating WORKTERRA Will also send OE Payroll File once UND gives us the go ahead
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            UND will Authorize our sending payroll files after their Open Enrollment. They are currently sending manual updates to the carrier and updating WORKTERRA

            Show
            Damion.Velasquez Damion M Velasquez added a comment - UND will Authorize our sending payroll files after their Open Enrollment. They are currently sending manual updates to the carrier and updating WORKTERRA
            Hide
            Damion.Velasquez Damion M Velasquez added a comment -

            They are using this file, and we will get through OE. All Carrier files and the QE code addition are complete

            Show
            Damion.Velasquez Damion M Velasquez added a comment - They are using this file, and we will get through OE. All Carrier files and the QE code addition are complete
            Damion.Velasquez Damion M Velasquez made changes -
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            Damion.Velasquez Damion M Velasquez made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            satyap Satya made changes -
            Environment_New Production [ 18442 ]
            Transition Time In Source Status Execution Times
            Damion M Velasquez made transition -
            NEW Feed Configuration
            8d 14m 1
            Damion M Velasquez made transition -
            Feed Configuration Dev Analysis
            57s 1
            Damion M Velasquez made transition -
            Dev Analysis In Peer Review
            32d 21h 57m 1
            Damion M Velasquez made transition -
            In Peer Review Carrier Testing
            1s 1
            Priya Dhamande (Inactive) made transition -
            Carrier Testing In LB Testing
            20d 16h 4m 1
            Vinayak Kulkarni (Inactive) made transition -
            In Production Testing Reopen in Production
            3d 15h 23m 2
            Damion M Velasquez made transition -
            Closed Reopen in Production
            76d 3h 5m 5
            Damion M Velasquez made transition -
            Reopen in Production In Development
            25d 4h 41m 7
            Damion M Velasquez made transition -
            In Development In LB Testing
            4d 14h 11m 7
            Damion M Velasquez made transition -
            In LB Testing Stage Testing
            13d 19h 22m 8
            Damion M Velasquez made transition -
            Stage Testing In Production Testing
            2d 1h 9m 8
            Damion M Velasquez made transition -
            In Production Testing Production Complete
            38d 7h 32m 6
            Damion M Velasquez made transition -
            Production Complete Closed
            42d 16h 55m 6

              People

              Assignee:
              Damion.Velasquez Damion M Velasquez
              Reporter:
              Damion.Velasquez Damion M Velasquez
              Account Executive:
              sam lindberg (Inactive)
              Developer:
              Damion M Velasquez
              QA:
              Damion M Velasquez
              Votes:
              0 Vote for this issue
              Watchers:
              23 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date: