Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-6489

System allocate the EDC but this employee did not check out at that time system should deallocate the EDC

    Details

    • Type: Bug
    • Status: In LB Testing
    • Priority: Critical
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      Production
    • Module:
      Exchange
    • Reported by:
      Harbinger
    • Item State:
      LB QA - On Hold
    • Issue Importance:
      Must Have

      Description

      This employee is having entry in waived medical. When this employee went on recommended screen, system allocate the EDC but this employee did not check out at that time system should deallocate the EDC
      Correction.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Avnish Yadav (Inactive) made transition -
            Open In Development
            13s 1
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Stage Testing
            22h 11m 1
            Rakesh Roy (Inactive) made transition -
            Stage Testing Reopened in Stage
            10h 58m 1
            Rakesh Roy (Inactive) made transition -
            Reopened in Stage In Development
            2s 1
            Rajendra Joshi (Inactive) made transition -
            In LB Testing Reopen in Local
            42d 14h 56m 2
            Avnish Yadav (Inactive) made transition -
            Reopen in Local In Development
            222d 7h 10m 2
            Avnish Yadav (Inactive) made transition -
            In Development In LB Testing
            2d 17h 4m 4

              People

              Assignee:
              rajendraj Rajendra Joshi (Inactive)
              Reporter:
              avnish.yadav Avnish Yadav (Inactive)
              Developer:
              Avnish Yadav (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Pre-Prod Due Date:
                Production Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 8h
                  8h
                  Remaining:
                  Time Spent - 5h Remaining Estimate - 3h
                  3h
                  Logged:
                  Time Spent - 5h Remaining Estimate - 3h
                  5h