Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-7143

Multiple benefit election in a single sso request - Symphony-Cigna and Austin-Cigna EOI processing through SSO

    Details

    • Type: Enhancement
    • Status: Closed
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - SSO
    • Reported by:
      Client
    • Item State:
      Production QA - In Testing

      Description

      Cigna had requested for supporting multiple benefit election in a single sso request for both Austin and Symphony.
      Without this enhancement done, Cigna will not sign-off WT-5318 for production, as the existing workterra system enrollment structure (single user can enroll for single benefit in single request), is complex for them to approve the multiple EOI of same employee in different request.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Santosh Balid (Inactive) made transition -
            New Request Pending for Approval
            2h 19m 1
            Santosh Balid (Inactive) made transition -
            Pending for Approval Approved for Development
            9s 1
            Santosh Balid (Inactive) made transition -
            Approved for Development In Development
            8s 1
            Santosh Balid (Inactive) made transition -
            In Development Mockup Approval
            14d 23h 34m 1
            Santosh Balid (Inactive) made transition -
            Mockup Approval Mockup Approved
            5s 1
            Santosh Balid (Inactive) made transition -
            Mockup Approved In Development
            3s 1
            Santosh Balid (Inactive) made transition -
            In Development In LB Testing
            9s 1
            Hrishikesh Deshpande (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            1d 1h 15m 1
            Hrishikesh Deshpande (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            2s 1
            Hrishikesh Deshpande (Inactive) made transition -
            Approved for Stage Stage Testing
            2s 1
            Santosh Balid (Inactive) made transition -
            Stage Testing Pending for Production Approval
            86d 21h 2m 1
            Santosh Balid (Inactive) made transition -
            Pending for Production Approval Approved for production
            5s 1
            Santosh Balid (Inactive) made transition -
            Approved for production In Production Testing
            1d 23h 18m 1
            Santosh Balid (Inactive) made transition -
            In Production Testing Production Complete
            1d 19h 32m 1
            Chris Ellenberger made transition -
            Production Complete Closed
            28d 11h 2m 1

              People

              Assignee:
              Chris.ellenberger Chris Ellenberger
              Reporter:
              santosh.balid Santosh Balid (Inactive)
              Account Executive:
              Jennifer Leugers
              Developer:
              Santosh Balid (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Pre-Prod Due Date:
                Production Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 150h Original Estimate - 150h
                  150h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 185.5h
                  185.5h