Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-715

All companies have a default of 2 admin seats when the company was created

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Environment:
      Stage
    • Module:
      BenAdmin - EDS
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Can Wait

      Description

      Trac details:-
      Yes, it should be at 2
      We have observed that, on MasterCompanyDB, Company User Accounts limit is set to zero.
      And whenever we add new company through Add company menu, its database will be replica of MasterCompanyDB which results in zero available seats for Company user accounts.

      Let us know whether we should update Company User Accounts limit to 2 in MasterCompanyDB on Stage.
      I had to set these manually. Whenever a company is being created new, these are not being set.

      We still have default 2 admin seats for a company.
      need 2 admin seats for the Village of Roscoe & 2 for Village of Glencoe unable to complete build

      For "Village or Roscoe" and "Village of Glencoe", we can see 2 seats are available for company admin.
      Please, let us know if you get any problem while adding company admins to these companies.

      We used to have all companies have a default of 2 admin seats when the company was created. Was that removed?
      Why aren’t these defaulting with the admin seats?
      Russ / Jenn,

      Please provide 2 admin user seats for
      Village or Roscoe
      Village of Glencoe

      In stage

      Repro steps are:

      create a new company , add classes and ,map any module to company >> now try to add admin users >> it will not get added. As discussed with Satya in DB table when company is getting added admin user limit sets to 5 but when module is mapped in company info page user limit sets to 0 and hence no admin is getting added.

        Attachments

          Issue Links

            Activity

            rakeshr Rakesh Roy (Inactive) created issue -
            admin01 admin made changes -
            Field Original Value New Value
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: EDS(10108)
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Development Backlog(10205)
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            8 hours of analysis is needed.

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - 8 hours of analysis is needed.
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Dev Estimates 8
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Issue Importance Can Wait [ 11801 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Assignee Sheetal Bodhale [ sheetal.bodhale ] Swapnil Pandhare [ swapnil.pandhare ]
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Assignee Swapnil Pandhare [ swapnil.pandhare ] Sheetal Bodhale [ sheetal.bodhale ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Severity Medium [ 13102 ]
            satyap Satya made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            Hide
            satyap Satya added a comment -

            Hi Prasad,

            Can you please verify this on LB?

            Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - Hi Prasad, Can you please verify this on LB? Regards, Satya Prakash
            satyap Satya made changes -
            Assignee Sheetal Bodhale [ sheetal.bodhale ] Prasad Patil [ prasad.patil ]
            satyap Satya made changes -
            Item State Parent values: Development(10200)Level 1 values: Development Backlog(10205) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            prasad.patil Prasad Patil (Inactive) made changes -
            Attachment Admin user not being added.jpg [ 46906 ]
            Hide
            prasad.patil Prasad Patil (Inactive) added a comment -

            Hi Sheetal Bodhale,

            Below are my findings on this issue.

            Concern: By default 2 Admin seats are not being allocated after creating a new company.

            I was able to reproduce this issue on LB with the steps below:

            • Created a new company(JKL Test)
            • Added classes
            • Mapped any module to company
            • Tried adding new admin

            The system didn't allowed to add the 1st admin and popped the message shown in below screen shot.

            By default 2 Admin seats are not being allocated after creating a new company.

            Request you to please look into this.

            Thank You,
            Prasad Patil
            --------------------------------------------------------------------------------------------------------
            CC: Mandar Kulkarni, Vijay Siddha, Satya

            Show
            prasad.patil Prasad Patil (Inactive) added a comment - Hi Sheetal Bodhale , Below are my findings on this issue. Concern: By default 2 Admin seats are not being allocated after creating a new company. I was able to reproduce this issue on LB with the steps below: Created a new company(JKL Test) Added classes Mapped any module to company Tried adding new admin The system didn't allowed to add the 1st admin and popped the message shown in below screen shot. By default 2 Admin seats are not being allocated after creating a new company. Request you to please look into this. Thank You, Prasad Patil -------------------------------------------------------------------------------------------------------- CC: Mandar Kulkarni , Vijay Siddha , Satya
            prasad.patil Prasad Patil (Inactive) made changes -
            Assignee Prasad Patil [ prasad.patil ] Sheetal Bodhale [ sheetal.bodhale ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 1h [ 3600 ]
            Worklog Id 42806 [ 42806 ]
            prasad.patil Prasad Patil (Inactive) logged work - 03/May/17 04:45 PM
            • Time Spent:
              1h
               

              Analysis and Discussion with team.

            satyap Satya made changes -
            Dev Due Date 26/May/2017
            Original Estimate 0h [ 0 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: In Progress(10206)
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 02/Jun/17 01:58 AM - edited
            • Time Spent:
              4.5h
               

              discussion with satya
              coding

            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 1h [ 3600 ] 10.5h [ 37800 ]
            Worklog Id 52019 [ 52019 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Remaining Estimate 0h [ 0 ] 8h [ 28800 ]
            Time Spent 10.5h [ 37800 ] 2.5h [ 9000 ]
            Worklog Id 52019 [ 52019 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Remaining Estimate 8h [ 28800 ] 5h [ 18000 ]
            Time Spent 2.5h [ 9000 ] 5.5h [ 19800 ]
            Worklog Id 52019 [ 52019 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Remaining Estimate 5h [ 18000 ] 2h [ 7200 ]
            Time Spent 5.5h [ 19800 ] 8.5h [ 30600 ]
            Worklog Id 52022 [ 52022 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 03/Jun/17 02:01 AM
            • Time Spent:
              3h
               

              unit testing
              review request

            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Code Review Date 05/Jun/2017
            Code Reviewed By Satya Prakash [ 12300 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Assignee Sheetal Bodhale [ sheetal.bodhale ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi Hrishikesh Deshpande,

            Please find below 3C's of the issue,
            Concern:All companies have a default of 2 admin seats when the company was created.

            Cause:Admin count field is not present on add company screen so it is passing zero value.Hence updating count as zero.

            Correction: Condition is handled.Please verify

            CC:Satya
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi Hrishikesh Deshpande , Please find below 3C's of the issue, Concern:All companies have a default of 2 admin seats when the company was created. Cause:Admin count field is not present on add company screen so it is passing zero value.Hence updating count as zero. Correction: Condition is handled.Please verify CC: Satya Thanks, Sheetal Bodhale
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 1h 40m [ 6000 ]
            Time Spent 8.5h [ 30600 ] 8h 50m [ 31800 ]
            Worklog Id 52455 [ 52455 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Attachment affectedfiles.txt [ 50720 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) logged work - 06/Jun/17 12:24 PM
            • Time Spent:
              0.5h
               
              <No comment>
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Link This issue is blocked by WT-9727 [ WT-9727 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Blocked for testing due to WT-9727

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Blocked for testing due to WT-9727
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Remaining Estimate 1h 40m [ 6000 ] 1h 10m [ 4200 ]
            Time Spent 8h 50m [ 31800 ] 9h 20m [ 33600 ]
            Worklog Id 52586 [ 52586 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 07/Jun/17 06:17 AM
            • Time Spent:
              20m
               

              code check in
              updated 3C's

            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi Hrishikesh Deshpande,

            Blocking issue is deployed on LB.you can verify this issue now.

            CC:SatyaGaurav Sodani
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi Hrishikesh Deshpande , Blocking issue is deployed on LB.you can verify this issue now. CC: Satya Gaurav Sodani Thanks, Sheetal Bodhale
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Remaining Estimate 1h 10m [ 4200 ] 40m [ 2400 ]
            Time Spent 9h 20m [ 33600 ] 9h 50m [ 35400 ]
            Worklog Id 59130 [ 59130 ]
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            This issues is Fixed on LB, Ready for Stage.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - This issues is Fixed on LB, Ready for Stage.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) logged work - 29/Jun/17 06:29 PM
            • Time Spent:
              0.5h
               
              <No comment>
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Marking as on hold.Once linked ticket gets fixed then we will commit changes on stage.

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Marking as on hold.Once linked ticket gets fixed then we will commit changes on stage.
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Hi Sheetal Bodhale,

            Linked ticket WT-9727 already ready for stage. please commit your changes on Stage.

            Thanks.
            Hrishikesh.

            CC : Prasanna Karlekar

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Hi Sheetal Bodhale , Linked ticket WT-9727 already ready for stage. please commit your changes on Stage. Thanks. Hrishikesh. CC : Prasanna Karlekar
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) logged work - 10/Jul/17 09:16 AM
            • Time Spent:
              0.5h
               

              Testing

            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Remaining Estimate 40m [ 2400 ] 10m [ 600 ]
            Time Spent 9h 50m [ 35400 ] 10h 20m [ 37200 ]
            Worklog Id 62012 [ 62012 ]
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            This issues is Fixed on Stage, Ready for Production.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - This issues is Fixed on Stage, Ready for Production.
            prasadp Prasad Pise (Inactive) made changes -
            Production Due Date 27/Jul/2017
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Stage QA(10202)Level 1 values: On Hold(10215)
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Marking this as On hold.We will move this ticket with linked ticket.

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Marking this as On hold.We will move this ticket with linked ticket.
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: On Hold(10215) Parent values: Stage QA(10202)
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi Hrishikesh Deshpande,

            Please consider this point in next production patch as linked JIRA's are deployed on production today.
            CC:Satya
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi Hrishikesh Deshpande , Please consider this point in next production patch as linked JIRA's are deployed on production today. CC: Satya Thanks, Sheetal Bodhale
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: Stage QA(10202) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            rakeshr Rakesh Roy (Inactive) made changes -
            Production Due Date 27/Jul/2017 26/Sep/2017
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            Hide
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment -

            Add company is not in testing scope for Production environment, Closing this jIRA.

            Show
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) added a comment - Add company is not in testing scope for Production environment, Closing this jIRA.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            satyap Satya made changes -
            Environment_New Stage [ 18443 ]
            Transition Time In Source Status Execution Times
            Satya made transition -
            Open In Development
            441d 1h 57m 1
            Hrishikesh Deshpande (Inactive) made transition -
            In Development In LB Testing
            51d 19h 21m 1
            Hrishikesh Deshpande (Inactive) made transition -
            In LB Testing Stage Testing
            17d 55m 1
            Hrishikesh Deshpande (Inactive) made transition -
            Stage Testing In Production Testing
            78d 3h 15m 1
            Hrishikesh Deshpande (Inactive) made transition -
            In Production Testing Production Complete
            7s 1
            Hrishikesh Deshpande (Inactive) made transition -
            Production Complete Closed
            2s 1

              People

              Assignee:
              hrishikesh.deshpande Hrishikesh Deshpande (Inactive)
              Reporter:
              rakeshr Rakesh Roy (Inactive)
              Developer:
              Sheetal Bodhale (Inactive)
              QA:
              Dhanashree Sherkar (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Production Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0h
                  0h
                  Remaining:
                  Time Spent - 10h 20m Remaining Estimate - 10m
                  10m
                  Logged:
                  Time Spent - 10h 20m Remaining Estimate - 10m
                  10h 20m