Details

    • Type: Enhancement
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - Export
    • Reported by:
      Support
    • Item State:
      Development - On Hold
    • Sprint:
      WT Sprint 31 - Enhancement, WT Sprint 32 - Enhancement
    • Feature Category:
      New
    • Severity:
      Medium

      Description

      Requirements are documented in the attached specs. It is kept in sync with Confluence page as of July 11, 2017.

        Attachments

        1. Observation.png
          51 kB
          Swapnil Eksambekar
        2. OE+Dashboard+Requirements.doc
          78 kB
          Abhay Patil
        3. OE-Dashboard.jpg
          1.10 MB
          Vinayak Ghanwat
        4. OE-Dashboard-column-open.jpg
          1.11 MB
          Vinayak Ghanwat
        5. screenshot-1.png
          107 kB
          Vinayak Kulkarni
        6. screenshot-2.png
          3 kB
          Cindy Wibbing

          Issue Links

            Activity

            abhay.patil Abhay Patil (Inactive) created issue -
            rakeshr Rakesh Roy (Inactive) made changes -
            Field Original Value New Value
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: Export(10110)
            satyap Satya made changes -
            Assignee Vijay Siddha [ vijays ] Vinayak Kulkarni [ vinayak.kulkarni ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are 400+ feeds at the time of OE. People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, we many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would maintain, along with feed details, resources allocated to ithem and also the critical dates. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are 400+ feeds at the time of OE. People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would maintain, along with feed details, people allocated to them and also the critical dates. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment Open Enrollment.xlsx [ 46358 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are 400+ feeds at the time of OE. People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would maintain, along with feed details, people allocated to them and also the critical dates. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment Open Enrollment.xlsx [ 46358 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment Dashboard Field List.xlsx [ 46465 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^Dashboard Field List.xlsx]

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment Dashboard Field List.xlsx [ 46465 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE Dashboard Field List.xlsx [ 47481 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^Dashboard Field List.xlsx]

            [~Yamilka.Coca] [~jackie.sivigny] [~Cindy.Wibbing] [~nick]
            Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^OE Dashboard Field List.xlsx] ivigny] [~Cindy.Wibbing] [~nick]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^OE Dashboard Field List.xlsx] ivigny] [~Cindy.Wibbing] [~nick]
            Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^OE Dashboard Field List.xlsx]
            [~Cindy.Wibbing]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-Requirements.docx [ 47632 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment - - edited

            I have updated specs based on meeting on 5/11/2017. [^OE-Dashboard-RequirementsV2.0.docx]

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - - edited I have updated specs based on meeting on 5/11/2017. [^OE-Dashboard-RequirementsV2.0.docx]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE Dashboard Field List.xlsx [ 47481 ]
            lalit.kumar Lalit Kumar (Inactive) logged work - 11/May/17 08:07 AM
            • Time Spent:
              1h
               

              Going through document shared.

            lalit.kumar Lalit Kumar (Inactive) logged work - 11/May/17 08:07 AM
            • Time Spent:
              1.5h
               

              Call on document

            jaideep.vinchurkar Jaideep Vinchurkar (Inactive) logged work - 11/May/17 01:28 PM
            • Time Spent:
              1h
               

              brainstorming over the concept.

            jaideep.vinchurkar Jaideep Vinchurkar (Inactive) made changes -
            Remaining Estimate 60h [ 216000 ]
            Original Estimate 60h [ 216000 ]
            jaideep.vinchurkar Jaideep Vinchurkar (Inactive) made changes -
            Remaining Estimate 60h [ 216000 ] 59h [ 212400 ]
            Time Spent 1h [ 3600 ]
            Worklog Id 44836 [ 44836 ]
            suraj.sokasane Suraj Sokasane (Inactive) logged work - 11/May/17 03:25 PM - edited
            • Time Spent:
              2.25h
               

              Call with Abhay and Amit
              Pre-call discussion

            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-Requirements.docx [ 47632 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.0.docx [ 47778 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Open Enrollment is the most busy time of the year and need to have a dashboard was discussed and agreed upon in a meeting between EDI Team with [~samir] and [~amitthorve]. Here is the problem statement and an outline of requirements.

            There are *400+ feeds at the time of OE.* People get assigned to feeds - and assignments are dynamic. Similarly the dates change. Typically the feed details are exported from WT and the Excel files are maintained with additional information. However, with many stake holders it is impossible to keep the information in sync. This breaks coordination and results in wastage of time and effort.

            We need a OE dashboard that would *maintain, along with feed details, people allocated to them and also the critical dates*. This will allow everyone to go to one place for information. The detailed requirement needs to be spelled out.

            We have also seen another communication gap. Client Executives share requirements with EDI team re the renewal details. Later at the time of Stage to Production move, Client Executives communicate with Development. On some occasions the communication with development differs from the information shared with EDI analysts earlier. We need to discuss and avoid this from happening. Will OE dashboard be the solution?

            Briefly, so far the following requirements have emerged.
            * Ability to export Excel file, which can be edited outside and imported back.
            * Maintain all important dates (OE start, OE end, Scheduled OE file sending, Year start) and automation of associated tasks (flipping flags and back, turning scheduler on/off).
            * History of changes?
             [^OE Dashboard Field List.xlsx]
            [~Cindy.Wibbing]
            Requirements are documented in the attached specs. [^OE-Dashboard-RequirementsV2.0.docx]
            abhay.patil Abhay Patil (Inactive) made changes -
            Comment [ I have replaced the dashboard field list with updates by Amit.
            Following are my notes. There may be some ambiguities due to my limited understanding.

            * There will be two types of fields (a) those extracted from WT (and are thus read-only) and (b) input by user (read-write). The user fields are highlighted in the spreadsheet.
            * We need to have some basic data integrity check in the dashboard. (E.g. OE end date > start date)
            * When there are multiple OE dates for a company, all the templates for that company will be marked with the earliest OE start and end dates. This is not supposed to hurt as flipping flag before start date is fine. End date doesn't drive anything. What matters is when the files are sent and when the new year begins. ({color:#d04437}What if the file send dates are different for different templates{color}?)
            * The templates will feature on dashboard ONLY IF they are on the scheduler. Therefore no active template should be made inactive or taken off the scheduler - e.g. after file is sent after OE. Instead the date should be set to beginning of the next plan year. (THis step could be automated.) For manual files - put it on the scheduler and send them to yourself (EDI analyst) via email. New feeds should be on the scheduler with beginning of the next year as the date.
            * Dashboard can be exported to Excel file, which can be edited outside and imported back. NOTE that when being imported, it SHOULD UPDATE the records and not OVERWRITE. In other words, each row in imported file should identify corresponding dashboard record (i.e. template) and update it. It SHOULD NOT wipe out entire dashboard and replace it with file. This is necessary as when a user exports file, they will export only those rows that they have permission to access. This is a note for the development.
            * A global template may span multiple companies. In case of global template, the dashboard should explode it to show all child templates.

            Notes:
            * Carrier contacts should be recorded in the notes section for the templates.
            * {color:#d04437}Handling termed plans - there was some issue about them. Need elaboration.{color}
            ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi All,

            While going through document, We have come up with an suggestion which will avoid need to sync system data with dashboard data.

            We will have data structure ( table ) to hold only user input values of OE dashboard and not for the values which are sourced from system data.

            While listing templates, we will get templates which are on scheduler with system information like templates flags, group template name, schedule details etc, along with this if there is an information present for particular template in dashboard data structure then will also show those along with system information, if there is nothing in dashboard data structure for a particular template then we'll show only system information along with empty ( blank ) user input values.

            We can update OE start date and end date from company information page to dashboard data structure in real time. So whenever OE dates are entered/updated on company information page, we can update same dates including logic of earliest effective date in case of multiple open enrollments to dashboard data structure.

            All other logic of background process will remain same on dashboard data. Let us know your views on same.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi All, While going through document, We have come up with an suggestion which will avoid need to sync system data with dashboard data. We will have data structure ( table ) to hold only user input values of OE dashboard and not for the values which are sourced from system data. While listing templates, we will get templates which are on scheduler with system information like templates flags, group template name, schedule details etc, along with this if there is an information present for particular template in dashboard data structure then will also show those along with system information, if there is nothing in dashboard data structure for a particular template then we'll show only system information along with empty ( blank ) user input values. We can update OE start date and end date from company information page to dashboard data structure in real time. So whenever OE dates are entered/updated on company information page, we can update same dates including logic of earliest effective date in case of multiple open enrollments to dashboard data structure. All other logic of background process will remain same on dashboard data. Let us know your views on same.
            suraj.sokasane Suraj Sokasane (Inactive) made changes -
            Remaining Estimate 59h [ 212400 ] 56.75h [ 204300 ]
            Time Spent 1h [ 3600 ] 3.25h [ 11700 ]
            Worklog Id 45329 [ 45329 ]
            suraj.sokasane Suraj Sokasane (Inactive) logged work - 12/May/17 03:26 PM
            • Time Spent:
              0.5h
               

              creating MOM for Call

            suraj.sokasane Suraj Sokasane (Inactive) made changes -
            Remaining Estimate 56.75h [ 204300 ] 56.25h [ 202500 ]
            Time Spent 3.25h [ 11700 ] 3.75h [ 13500 ]
            Worklog Id 45330 [ 45330 ]
            suraj.sokasane Suraj Sokasane (Inactive) made changes -
            Worklog Id 45329 [ 45329 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            Vinayak Kulkarni - your suggestions are great.
            As I understand, you are talking about the implementation detail and there is no change in the functionality (that is exposed to the user) envisaged in the requirement document.
            Thanks!

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - Vinayak Kulkarni - your suggestions are great. As I understand, you are talking about the implementation detail and there is no change in the functionality (that is exposed to the user) envisaged in the requirement document. Thanks!
            lalit.kumar Lalit Kumar (Inactive) made changes -
            Remaining Estimate 56.25h [ 202500 ] 55.25h [ 198900 ]
            Time Spent 3.75h [ 13500 ] 4.75h [ 17100 ]
            Worklog Id 48670 [ 48670 ]
            lalit.kumar Lalit Kumar (Inactive) made changes -
            Remaining Estimate 55.25h [ 198900 ] 53.75h [ 193500 ]
            Time Spent 4.75h [ 17100 ] 6.25h [ 22500 ]
            Worklog Id 48671 [ 48671 ]
            lalit.kumar Lalit Kumar (Inactive) logged work - 25/May/17 10:54 AM
            • Time Spent:
              0.5h
               

              Gave overview to team

            rohan.khandave Rohan J Khandave (Inactive) logged work - 25/May/17 12:03 PM
            • Time Spent:
              1.5h
               

              design team meeting

            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Remaining Estimate 53.75h [ 193500 ] 52.25h [ 188100 ]
            Time Spent 6.25h [ 22500 ] 7.75h [ 27900 ]
            Worklog Id 48808 [ 48808 ]
            lalit.kumar Lalit Kumar (Inactive) made changes -
            Remaining Estimate 52.25h [ 188100 ] 51.75h [ 186300 ]
            Time Spent 7.75h [ 27900 ] 8.25h [ 29700 ]
            Worklog Id 49011 [ 49011 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 30/May/17 07:46 AM - edited
            • Time Spent:
              2h
               

              OE Dashboard Discussion.

            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 30/May/17 12:35 PM
            • Time Spent:
              4h
               
              <No comment>
            rakesh.shahane Rakesh Shahane (Inactive) logged work - 30/May/17 01:12 PM - edited
            • Time Spent:
              2h
               
              <No comment>
            saurabh.sablaka Saurabh Sablaka (Inactive) logged work - 30/May/17 01:42 PM
            • Time Spent:
              1.25h
               

              Discussion on page design & OE dashboard features

            saurabh.sablaka Saurabh Sablaka (Inactive) made changes -
            Remaining Estimate 51.75h [ 186300 ] 50.5h [ 181800 ]
            Time Spent 8.25h [ 29700 ] 9.5h [ 34200 ]
            Worklog Id 50641 [ 50641 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.0.docx [ 47778 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.1.docx [ 49915 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment - - edited

            Vinayak Kulkarni - I have uploaded a slightly revised version. [^OE-Dashboard-RequirementsV2.1.docx]
            Have added the following in the requirements.
            Note: User update of OE dates needs to be synchronized with all other templates of that company. In other words, when OE dates for a template are edited by the user, OE dates on all templates belonging to that company need to be updated.

            CC Amit Thorve Satya

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - - edited Vinayak Kulkarni - I have uploaded a slightly revised version. [^OE-Dashboard-RequirementsV2.1.docx] Have added the following in the requirements. Note: User update of OE dates needs to be synchronized with all other templates of that company. In other words, when OE dates for a template are edited by the user, OE dates on all templates belonging to that company need to be updated. CC Amit Thorve Satya
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.1.docx [ 49915 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.1.docx [ 49916 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Abhay Patil

            Noted it.

            Actually during analysis and mock-ups discussion, we came up with new idea to have two tables instead of showing everything in one table on screen.

            First table would contain only company specific data and OE dates goes there and second table would contain template specific data. By this we need to update OE dates for company which will be considered for all the template on that company.

            This might be little confusing to you right now. We are creating two mock-ups, first that we had discussed in call ( single row for every template ) and second one which i mentioned above.

            Once we are done with mock-ups then we can have call to discuss both to make everyone on same page.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Abhay Patil Noted it. Actually during analysis and mock-ups discussion, we came up with new idea to have two tables instead of showing everything in one table on screen. First table would contain only company specific data and OE dates goes there and second table would contain template specific data. By this we need to update OE dates for company which will be considered for all the template on that company. This might be little confusing to you right now. We are creating two mock-ups, first that we had discussed in call ( single row for every template ) and second one which i mentioned above. Once we are done with mock-ups then we can have call to discuss both to make everyone on same page.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 50.5h [ 181800 ] 46.5h [ 167400 ]
            Time Spent 9.5h [ 34200 ] 13.5h [ 48600 ]
            Worklog Id 50924 [ 50924 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 46.5h [ 167400 ] 44.5h [ 160200 ]
            Time Spent 13.5h [ 48600 ] 15.5h [ 55800 ]
            Worklog Id 50947 [ 50947 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Worklog Id 50947 [ 50947 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 01/Jun/17 12:00 PM
            • Time Spent:
              0.75h
               

              OE Dashboard Mock-up Review.

            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 01/Jun/17 12:17 PM
            • Time Spent:
              2h
               
              <No comment>
            rakesh.shahane Rakesh Shahane (Inactive) made changes -
            Remaining Estimate 44.5h [ 160200 ] 42.5h [ 153000 ]
            Time Spent 15.5h [ 55800 ] 17.5h [ 63000 ]
            Worklog Id 51734 [ 51734 ]
            rakesh.shahane Rakesh Shahane (Inactive) made changes -
            Worklog Id 51734 [ 51734 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Abhay Patil and Amit Thorve

            We would be done with Mock-ups creation soon,
            Can we have call on 06/02/2017 at 10am IST to discuss these mock-ups?

            Thanks,
            Vinayak

            Vinayak Ghanwat Satya

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Abhay Patil and Amit Thorve We would be done with Mock-ups creation soon, Can we have call on 06/02/2017 at 10am IST to discuss these mock-ups? Thanks, Vinayak Vinayak Ghanwat Satya
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            Sure Vinayak Kulkarni - please schedule and send calendar invite for the meeting.

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - Sure Vinayak Kulkarni - please schedule and send calendar invite for the meeting.
            Prashant.samal Prashant Samal (Inactive) logged work - 01/Jun/17 05:00 PM
            • Time Spent:
              0.5h
               


              Discussion with Vinayak G on OE Dashboard and providing Inputs - 0.5 hr

            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            Vinayak Kulkarni I am fine with the time as well.

            Show
            amitthorve Amit Thorve (Inactive) added a comment - Vinayak Kulkarni I am fine with the time as well.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 42.5h [ 153000 ] 41.75h [ 150300 ]
            Time Spent 17.5h [ 63000 ] 18.25h [ 65700 ]
            Worklog Id 51804 [ 51804 ]
            vinayak.ghanwat Vinayak Ghanwat (Inactive) made changes -
            Attachment OE Dashboard.zip [ 50394 ]
            Hide
            vinayak.ghanwat Vinayak Ghanwat (Inactive) added a comment -

            Hi Amit Thorve Abhay Patil,

            As we discussed, here I have attached OE dashboard mockups, Please go through it and share your feedback.
            OE Dashboard.zip

            Vinayak KulkarniSatya

            Thanks,
            Vinayak G

            Show
            vinayak.ghanwat Vinayak Ghanwat (Inactive) added a comment - Hi Amit Thorve Abhay Patil , As we discussed, here I have attached OE dashboard mockups, Please go through it and share your feedback. OE Dashboard.zip Vinayak Kulkarni Satya Thanks, Vinayak G
            Hide
            satyap Satya added a comment -

            Attached Mockups as discussed in call.

            Abhay Patil, Amit Thorve; Please let us know your feedback on this.

            Regards,
            Satya Prakash

            Cc: Vijay Siddha Vinayak Kulkarni Vinayak Ghanwat

            Show
            satyap Satya added a comment - Attached Mockups as discussed in call. Abhay Patil , Amit Thorve ; Please let us know your feedback on this. Regards, Satya Prakash Cc: Vijay Siddha Vinayak Kulkarni Vinayak Ghanwat
            satyap Satya made changes -
            Attachment OE-Dashboard.jpg [ 50395 ]
            Attachment OE-Dashboard-column-open.jpg [ 50396 ]
            Attachment OE-Dashboard-Group Template.jpg [ 50397 ]
            Attachment OE-Dashboard-opt0.jpg [ 50398 ]
            Attachment OE-Dashboard-opt1.jpg [ 50399 ]
            Attachment OE-Dashboard-opt2.jpg [ 50400 ]
            satyap Satya made changes -
            Attachment OE-Dashboard.jpg [ 50395 ]
            satyap Satya made changes -
            Attachment OE-Dashboard-column-open.jpg [ 50396 ]
            satyap Satya made changes -
            Attachment OE-Dashboard-Group Template.jpg [ 50397 ]
            satyap Satya made changes -
            Attachment OE-Dashboard-opt0.jpg [ 50398 ]
            satyap Satya made changes -
            Attachment OE-Dashboard-opt1.jpg [ 50399 ]
            satyap Satya made changes -
            Attachment OE-Dashboard-opt2.jpg [ 50400 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 02/Jun/17 12:09 PM - edited
            • Time Spent:
              1h
               
              <No comment>
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 02/Jun/17 12:29 PM
            • Time Spent:
              1h
               
              <No comment>
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV2.1.docx [ 49916 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV3.0.docx [ 50488 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            I have uploaded the latest version of the requirement document. I have added a few questions too.

            I have not commented on option 1 and 2. As per the meeting, we recommend one row per template where company information is repeated.

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - I have uploaded the latest version of the requirement document. I have added a few questions too. I have not commented on option 1 and 2. As per the meeting, we recommend one row per template where company information is repeated.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 41.75h [ 150300 ] 39.75h [ 143100 ]
            Time Spent 18.25h [ 65700 ] 20.25h [ 72900 ]
            Worklog Id 52141 [ 52141 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 39.75h [ 143100 ] 38.75h [ 139500 ]
            Time Spent 20.25h [ 72900 ] 21.25h [ 76500 ]
            Worklog Id 52160 [ 52160 ]
            vinayak.ghanwat Vinayak Ghanwat (Inactive) made changes -
            Attachment OE-Dashboard.jpg [ 50611 ]
            Attachment OE-Dashboard-column-open.jpg [ 50612 ]
            Hide
            vinayak.ghanwat Vinayak Ghanwat (Inactive) added a comment -

            Hi Amit Thorve,

            As per our discussion, I have updated the option one. Where user can manage the column order by using drag and drop and clicking on the icon.
            Please check the attached design and confirm.

            Abhay PatilVinayak Kulkarni

            Thanks,
            Vinayak

            Show
            vinayak.ghanwat Vinayak Ghanwat (Inactive) added a comment - Hi Amit Thorve , As per our discussion, I have updated the option one. Where user can manage the column order by using drag and drop and clicking on the icon. Please check the attached design and confirm. Abhay Patil Vinayak Kulkarni Thanks, Vinayak
            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            This looks good to me. Abhay Patil, Cindy Wibbing Please check this.

            Show
            amitthorve Amit Thorve (Inactive) added a comment - This looks good to me. Abhay Patil , Cindy Wibbing Please check this.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 05/Jun/17 12:00 PM
            • Time Spent:
              0.5h
               
              <No comment>
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 05/Jun/17 04:40 PM
            • Time Spent:
              3h
               
              <No comment>
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV3.0.docx [ 50488 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV3.1.docx [ 50686 ]
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            Thanks Vinayak Ghanwat - this is good.
            Vinayak Kulkarni, Satya Amit Thorve - please see the updated requirements document, especially for filters, grid management, import/export and data constraints.

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - Thanks Vinayak Ghanwat - this is good. Vinayak Kulkarni , Satya Amit Thorve - please see the updated requirements document, especially for filters, grid management, import/export and data constraints.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 38.75h [ 139500 ] 38.25h [ 137700 ]
            Time Spent 21.25h [ 76500 ] 21.75h [ 78300 ]
            Worklog Id 52433 [ 52433 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 06/Jun/17 01:12 PM
            • Time Spent:
              3h
               
              <No comment>
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 38.25h [ 137700 ] 35.25h [ 126900 ]
            Time Spent 21.75h [ 78300 ] 24.75h [ 89100 ]
            Worklog Id 52641 [ 52641 ]
            Prashant.samal Prashant Samal (Inactive) made changes -
            Remaining Estimate 35.25h [ 126900 ] 34.75h [ 125100 ]
            Time Spent 24.75h [ 89100 ] 25.25h [ 90900 ]
            Worklog Id 52750 [ 52750 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 07/Jun/17 10:33 AM
            • Time Spent:
              1h
               

              Meeting Regarding OE dashbaord

            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Abhay Patil Amit Thorve

            We have some queries related to how filters would be shown on screen and wanted to discuss to clear those queries, Can we have a call tomorrow 06/08/2017 at 10am IST to discuss this?
            If yes, I will send meeting invite for the same. Thanks.

            Gaurav Sodani Vijay Siddha Satya Ganesh Sadawarte

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Abhay Patil Amit Thorve We have some queries related to how filters would be shown on screen and wanted to discuss to clear those queries, Can we have a call tomorrow 06/08/2017 at 10am IST to discuss this? If yes, I will send meeting invite for the same. Thanks. Gaurav Sodani Vijay Siddha Satya Ganesh Sadawarte
            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            Vinayak Kulkarni I am not available at 10.00am IST. Can we have this meeting at 8.00am IST or 11.00am IST?

            Show
            amitthorve Amit Thorve (Inactive) added a comment - Vinayak Kulkarni I am not available at 10.00am IST. Can we have this meeting at 8.00am IST or 11.00am IST?
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 07/Jun/17 01:54 PM - edited
            • Time Spent:
              5.25h
               

              1) Internal Discussion
              2) Open enrollment meeting
              3) Analysis
              4) Queries

            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            11:00am will be fine with us, Abhay Patil is this fine with you?

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - 11:00am will be fine with us, Abhay Patil is this fine with you?
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 34.75h [ 125100 ] 29.25h [ 105300 ]
            Time Spent 25.25h [ 90900 ] 30.75h [ 110700 ]
            Worklog Id 53021 [ 53021 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 29.25h [ 105300 ] 29.5h [ 106200 ]
            Time Spent 30.75h [ 110700 ] 30.5h [ 109800 ]
            Worklog Id 53021 [ 53021 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 07/Jun/17 04:49 PM
            • Time Spent:
              2h
               
              <No comment>
            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            Vinayak Kulkarni Amit Thorve - yes 11 AM IST (i.e. 10:30 PM PST) will be okay for me. Please send me the invite.

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - Vinayak Kulkarni Amit Thorve - yes 11 AM IST (i.e. 10:30 PM PST) will be okay for me. Please send me the invite.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue relates to WT-9752 [ WT-9752 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - - edited

            Amit Thorve Abhay Patil Gaurav Sodani Ganesh Sadawarte Punam Satpute Pallavi Kulkarni Aniruddha Dev

            Hi All,

            Thanks for taking out your time. Please find the MoM of our discussion today(06/08/2017).

            1. UI:

            • The approach shown by Vinayak for Advance filter is good to go with.
            • "Blank" or "Empty" option will be shown for each Advance filter which will indicate filter is applied with blank value
            • Multiple select as well as Single select will be applicable based on the values the specific filter carries

            2. Concurrent usage of dashboard by multiple users

            • Team needs to discuss with Amit and finalize the approach on the change control and refresh approach, this is a specific condition when 2 or more concurrent users are working on the OE dashboard at once

            3. OE dashboard separate table

            • Harbinger team needs to decide whether OE dashboard will be using the system data to pull out filer specific data or maintaining a separate table for OE dashboard. This has been proposed in order to decrease the latency that would be caused because of the huge amount of data which needs to be scanned. However, harbinger team needs to consult the Performance team and understand the current implementation latency

            4. Blackout Period:

            • The requirement is understood
            • Amit to confirm on which date needs to be considered for swapping the Flag from YES to NO and shifting schedule to next enrollment year.
            • File due date
            • File sent date

            Please add if anything is missing here. Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - - edited Amit Thorve Abhay Patil Gaurav Sodani Ganesh Sadawarte Punam Satpute Pallavi Kulkarni Aniruddha Dev Hi All, Thanks for taking out your time. Please find the MoM of our discussion today(06/08/2017). 1. UI: The approach shown by Vinayak for Advance filter is good to go with. "Blank" or "Empty" option will be shown for each Advance filter which will indicate filter is applied with blank value Multiple select as well as Single select will be applicable based on the values the specific filter carries 2. Concurrent usage of dashboard by multiple users Team needs to discuss with Amit and finalize the approach on the change control and refresh approach, this is a specific condition when 2 or more concurrent users are working on the OE dashboard at once 3. OE dashboard separate table Harbinger team needs to decide whether OE dashboard will be using the system data to pull out filer specific data or maintaining a separate table for OE dashboard. This has been proposed in order to decrease the latency that would be caused because of the huge amount of data which needs to be scanned. However, harbinger team needs to consult the Performance team and understand the current implementation latency 4. Blackout Period: The requirement is understood Amit to confirm on which date needs to be considered for swapping the Flag from YES to NO and shifting schedule to next enrollment year. File due date File sent date Please add if anything is missing here. Thanks.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 08/Jun/17 12:00 PM
            • Time Spent:
              4.5h
               

              1) Call for open enrollment dashboard discussion.
              2) Internal discussion
              3) Analysis.

            punam.satpute Punam Satpute (Inactive) logged work - 08/Jun/17 12:00 PM
            • Time Spent:
              1h
               

              Call for open enrollment dashboard discussion

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 08/Jun/17 05:56 PM
            • Time Spent:
              1h
               


              Call for open enrollment dashboard discussion

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 29.5h [ 106200 ] 25h [ 90000 ]
            Time Spent 30.5h [ 109800 ] 35h [ 126000 ]
            Worklog Id 53503 [ 53503 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Assignee Vinayak Kulkarni [ vinayak.kulkarni ] Ganesh Sadawarte [ ganesh.sadawarte ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Link This issue duplicates WT-9752 [ WT-9752 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Item State Parent values: Development(10200) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Status New Request [ 10029 ] Pending for Approval [ 10002 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Status Pending for Approval [ 10002 ] Approved for Development [ 10003 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 09/Jun/17 09:18 AM
            • Time Spent:
              5.5h
               

              1) Design Team Meeting
              2) Analysis and documentation.
              3) Internal discussion.

            rohan.khandave Rohan J Khandave (Inactive) logged work - 09/Jun/17 02:12 PM
            • Time Spent:
              1.5h
               

              design team meeting

            rohan.khandave Rohan J Khandave (Inactive) made changes -
            Remaining Estimate 25h [ 90000 ] 23.5h [ 84600 ]
            Time Spent 35h [ 126000 ] 36.5h [ 131400 ]
            Worklog Id 53898 [ 53898 ]
            prasanna Prasanna Karlekar (Inactive) logged work - 09/Jun/17 10:00 PM
            • Time Spent:
              1h
               

              Design team meeting - Open Enrollment Dashboard Data structure

            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited

            Abhay Patil,Vinayak Kulkarni,Gaurav Sodani,Pallavi Kulkarni,Punam Satpute

            Hi Amit Thorve,

            Please check below summary of our discussion.

            1) We will update open enrollment dashboard data at same time whenever any field get changed in the system which is referenced in open enrollment dashboard, so we don't need any sync service.

            2) We will have another input column on open enrollment dashboard for black out period, which will have default value to 'Yes', if some one don't want to consider as black out period for that specific template then set value to 'No'. The value of this input will determine whether to shift schedule start date to next enrollment year.

            3) OE file Due date will consider to set current year flag to 'No' and set schedule start date to next enrollment year.

            4) While importing data,keep only those rows which we want to update into open enrollment dashboard and delete other rows from excel file. Also we will show the note on open enrollment dashboard.

            5) If user enter open enrollment start date and end date then it will populate for all templates of that same company.

            6) Once open enrollment start date and end date are entered into company information and reflected into OE dashboard then user should not be able update again. We will show those fields as non editable.

            7) We need to check for new template as well as new company is added in WT. While adding new company will add this point into our check list.

            8) Configuration Screen - User access restriction of import/export functionality.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - - edited Abhay Patil , Vinayak Kulkarni , Gaurav Sodani , Pallavi Kulkarni , Punam Satpute Hi Amit Thorve , Please check below summary of our discussion. 1) We will update open enrollment dashboard data at same time whenever any field get changed in the system which is referenced in open enrollment dashboard, so we don't need any sync service. 2) We will have another input column on open enrollment dashboard for black out period, which will have default value to 'Yes', if some one don't want to consider as black out period for that specific template then set value to 'No'. The value of this input will determine whether to shift schedule start date to next enrollment year. 3) OE file Due date will consider to set current year flag to 'No' and set schedule start date to next enrollment year. 4) While importing data,keep only those rows which we want to update into open enrollment dashboard and delete other rows from excel file. Also we will show the note on open enrollment dashboard. 5) If user enter open enrollment start date and end date then it will populate for all templates of that same company. 6) Once open enrollment start date and end date are entered into company information and reflected into OE dashboard then user should not be able update again. We will show those fields as non editable. 7) We need to check for new template as well as new company is added in WT. While adding new company will add this point into our check list. 8) Configuration Screen - User access restriction of import/export functionality. Thanks, Ganesh
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 23.5h [ 84600 ] 18h [ 64800 ]
            Time Spent 36.5h [ 131400 ] 42h [ 151200 ]
            Worklog Id 54020 [ 54020 ]
            punam.satpute Punam Satpute (Inactive) made changes -
            Remaining Estimate 18h [ 64800 ] 17h [ 61200 ]
            Time Spent 42h [ 151200 ] 43h [ 154800 ]
            Worklog Id 54026 [ 54026 ]
            Hide
            gaurav.sodani Gaurav Sodani (Inactive) added a comment -

            Looping Nagini to OE dashboard thread++

            CC Nagini Indugula

            Regards
            Gaurav

            Show
            gaurav.sodani Gaurav Sodani (Inactive) added a comment - Looping Nagini to OE dashboard thread++ CC Nagini Indugula Regards Gaurav
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 12/Jun/17 01:23 PM
            • Time Spent:
              8h
               

              1) Discussion with Amit
              2) Internal Discussion
              3) Work break down structure/ task identification.
              4) Open enrollment JIRA update for summary point.

            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) logged work - 12/Jun/17 04:56 PM
            • Time Spent:
              2h
               
              <No comment>
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 17h [ 61200 ] 14h [ 50400 ]
            Time Spent 43h [ 154800 ] 46h [ 165600 ]
            Worklog Id 54259 [ 54259 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 14h [ 50400 ] 12h [ 43200 ]
            Time Spent 46h [ 165600 ] 48h [ 172800 ]
            Worklog Id 54268 [ 54268 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Remaining Estimate 12h [ 43200 ] 10h [ 36000 ]
            Time Spent 48h [ 172800 ] 50h [ 180000 ]
            Worklog Id 54280 [ 54280 ]
            punam.satpute Punam Satpute (Inactive) logged work - 13/Jun/17 05:14 AM
            • Time Spent:
              4h
               
              <No comment>
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-9795 [ WT-9795 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-9795 [ WT-9795 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9795 [ WT-9795 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9796 [ WT-9796 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9797 [ WT-9797 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9798 [ WT-9798 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9799 [ WT-9799 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9800 [ WT-9800 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9801 [ WT-9801 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9802 [ WT-9802 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9803 [ WT-9803 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9804 [ WT-9804 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9805 [ WT-9805 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9808 [ WT-9808 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9807 [ WT-9807 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-9806 [ WT-9806 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue relates to WT-9752 [ WT-9752 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue duplicates WT-9752 [ WT-9752 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 10h [ 36000 ] 2h [ 7200 ]
            Time Spent 50h [ 180000 ] 58h [ 208800 ]
            Worklog Id 54671 [ 54671 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 13/Jun/17 01:27 PM
            • Time Spent:
              6h
               

              1) Work break down structure with estimation
              2) Analysis
              3) Internal discussion with team for new field implementation.

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 0h [ 0 ]
            Time Spent 58h [ 208800 ] 64h [ 230400 ]
            Worklog Id 54676 [ 54676 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Status Approved for Development [ 10003 ] In Development [ 10007 ]
            punam.satpute Punam Satpute (Inactive) logged work - 14/Jun/17 05:15 AM
            • Time Spent:
              4h
               
              <No comment>
            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment -

            Amit Thorve,Abhay Patil,Vinayak Kulkarni,Gaurav Sodani,Pallavi Kulkarni,Punam Satpute

            Hi All,

            There are total 31 fields given in OE dashboard and out below three fields are not exits in system. so we are implementing these fields into system as part of OE dashboard development.

            1) Client Executive
            2) EDI Executive (for Company) .
            3) Carrier Contact.

            There is an enhancement WT-9262 which need implementation of Client Executive and EDI Executive (for Company) fields in system. As per requirement document if these fields are implemented in the system then we need to show this as read only on open enrollment dashboard. So we will display it as text as we are implementing those into system, if no value selected then blank will populate on dashboard.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - Amit Thorve , Abhay Patil , Vinayak Kulkarni , Gaurav Sodani , Pallavi Kulkarni , Punam Satpute Hi All, There are total 31 fields given in OE dashboard and out below three fields are not exits in system. so we are implementing these fields into system as part of OE dashboard development. 1) Client Executive 2) EDI Executive (for Company) . 3) Carrier Contact. There is an enhancement WT-9262 which need implementation of Client Executive and EDI Executive (for Company) fields in system. As per requirement document if these fields are implemented in the system then we need to show this as read only on open enrollment dashboard. So we will display it as text as we are implementing those into system, if no value selected then blank will populate on dashboard. Thanks, Ganesh
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 14/Jun/17 12:32 PM
            • Time Spent:
              4h
               

              1) Call with Amit
              2) Internal discussion with satya and team for new field implementation
              3) Discussion UI team.
              4) Update analysis on JIRA
              5) Analysis document creation.

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 64h [ 230400 ] 68h [ 244800 ]
            Worklog Id 55003 [ 55003 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) logged work - 15/Jun/17 12:05 PM
            • Time Spent:
              3h
               
              • Internal Discussion
              • Created Test plan and sent to Rakesh, Vijay, Samir, Satya and Gaurav for review.
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Time Spent 68h [ 244800 ] 71h [ 255600 ]
            Worklog Id 55459 [ 55459 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 15/Jun/17 05:00 PM
            • Time Spent:
              1.5h
               

              OE Dashboard meeting for preparing test plan along with Hrishikesh and Swapnil

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 15/Jun/17 05:20 PM
            • Time Spent:
              1h
               

              Analysis and Discussion about req doc along with Swapnil

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 16/Jun/17 12:00 PM - edited
            • Time Spent:
              3h
               

              Discussion with UI team
              Internal discussion

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 16/Jun/17 05:34 PM
            • Time Spent:
              2h
               

              Continue analysis,Test Scenarios discussion, Revise Test Plan along with Hrishikesh and Swapnil

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 19/Jun/17 12:41 PM
            • Time Spent:
              2h
               
              <No comment>
            satyap Satya made changes -
            Sprint WT Sprint 31 - Enhancement [ 64 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 19/Jun/17 04:30 PM
            • Time Spent:
              1h
               

              TC writing , Reviewing , Discussion about OE dashboard testing

            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 71h [ 255600 ] 72h [ 259200 ]
            Worklog Id 56439 [ 56439 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 72h [ 259200 ] 73.5h [ 264600 ]
            Worklog Id 56455 [ 56455 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 73.5h [ 264600 ] 74.5h [ 268200 ]
            Worklog Id 56468 [ 56468 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 74.5h [ 268200 ] 76.5h [ 275400 ]
            Worklog Id 56473 [ 56473 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 76.5h [ 275400 ] 78.5h [ 282600 ]
            Worklog Id 56482 [ 56482 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 78.5h [ 282600 ] 79.5h [ 286200 ]
            Worklog Id 56482 [ 56482 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 79.5h [ 286200 ] 80.5h [ 289800 ]
            Worklog Id 56491 [ 56491 ]
            prasanna Prasanna Karlekar (Inactive) made changes -
            Time Spent 80.5h [ 289800 ] 81.5h [ 293400 ]
            Worklog Id 56622 [ 56622 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 20/Jun/17 12:44 PM
            • Time Spent:
              3h
               

              1) Internal Discussion
              2) Discussion with UI team
              3) Implementation change possibility for dashboard

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 81.5h [ 293400 ] 83.5h [ 300600 ]
            Worklog Id 56889 [ 56889 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 83.5h [ 300600 ] 86.5h [ 311400 ]
            Worklog Id 56893 [ 56893 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 21/Jun/17 12:24 PM
            • Time Spent:
              2h
               

              Discussion and analysis.
              Meeting

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 22/Jun/17 09:23 AM - edited
            • Time Spent:
              0.5h
               

              Discussion with Hrishikesh and Gaurav regarding new WBS

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 22/Jun/17 12:26 PM - edited
            • Time Spent:
              2h
               
              <No comment>
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 86.5h [ 311400 ] 88.5h [ 318600 ]
            Worklog Id 57927 [ 57927 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 88.5h [ 318600 ] 119.5h [ 430200 ]
            Worklog Id 57931 [ 57931 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 0h [ 0 ] 28h [ 100800 ]
            Time Spent 119.5h [ 430200 ] 91.5h [ 329400 ]
            Worklog Id 57931 [ 57931 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 28h [ 100800 ] 29h [ 104400 ]
            Time Spent 91.5h [ 329400 ] 90.5h [ 325800 ]
            Worklog Id 57931 [ 57931 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 23/Jun/17 12:57 PM
            • Time Spent:
              1.5h
               

              Discussion and Review of new WBS shared by Gaurav

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 24/Jun/17 06:17 AM
            • Time Spent:
              2h
               
              <No comment>
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Requirements are documented in the attached specs. [^OE-Dashboard-RequirementsV2.0.docx] Requirements are documented in the attached specs. (Attached here [^OE-Dashboard-RequirementsV3.1.docx] is in sync with [Confluence page|https://careerbuilder.atlassian.net/wiki/display/WTEDIDOC/OE+Dashboard+Requirements] as of June 26, 2017.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 27/Jun/17 12:33 PM
            • Time Spent:
              2h
               
              <No comment>
            punam.satpute Punam Satpute (Inactive) made changes -
            Remaining Estimate 29h [ 104400 ] 25h [ 90000 ]
            Time Spent 90.5h [ 325800 ] 94.5h [ 340200 ]
            Worklog Id 58436 [ 58436 ]
            punam.satpute Punam Satpute (Inactive) made changes -
            Remaining Estimate 25h [ 90000 ] 21h [ 75600 ]
            Time Spent 94.5h [ 340200 ] 98.5h [ 354600 ]
            Worklog Id 58437 [ 58437 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 21h [ 75600 ] 19h [ 68400 ]
            Time Spent 98.5h [ 354600 ] 100.5h [ 361800 ]
            Worklog Id 58470 [ 58470 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: In Progress(10206)
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 19h [ 68400 ] 17h [ 61200 ]
            Time Spent 100.5h [ 361800 ] 102.5h [ 369000 ]
            Worklog Id 58737 [ 58737 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 17h [ 61200 ] 15.5h [ 55800 ]
            Time Spent 102.5h [ 369000 ] 104h [ 374400 ]
            Worklog Id 59420 [ 59420 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 15.5h [ 55800 ] 15h [ 54000 ]
            Time Spent 104h [ 374400 ] 104.5h [ 376200 ]
            Worklog Id 59895 [ 59895 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Worklog Id 59895 [ 59895 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 15h [ 54000 ] 14h [ 50400 ]
            Time Spent 104.5h [ 376200 ] 105.5h [ 379800 ]
            Worklog Id 60039 [ 60039 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 14h [ 50400 ] 13h [ 46800 ]
            Time Spent 105.5h [ 379800 ] 106.5h [ 383400 ]
            Worklog Id 60205 [ 60205 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Worklog Id 60205 [ 60205 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) logged work - 01/Jul/17 06:48 AM
            • Time Spent:
              1h
               
              <No comment>
            admin01 admin made changes -
            Sprint WT Sprint 31 - Enhancement [ 64 ] WT Sprint 31 - Enhancement, WT Sprint 32 - Enhancement [ 64, 75 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Attachment screenshot-1.png [ 54403 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Attaching screenshot of current developed page.

            Note: Development is in progress and few small changes are still pending.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Attaching screenshot of current developed page. Note: Development is in progress and few small changes are still pending.
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-10058 [ WT-10058 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 07/Jul/17 09:12 AM
            • Time Spent:
              1.5h
               

              meeting in Gir Regarding Delayed points and current Status and test planning

            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Amit Thorve and Abhay Patil

            We got one query about shifting Schedule start day to first day of next enrollment year.

            Here we are fine with company level template which are on scheduler, we can get next enrollment year's start date from company information.

            But, How about group level templates? they can have multiple companies involved and which companies enrollment period should we look for?

            Shall we look enrollment period for any one of the group companies or we shall not update schedule for group templates? let us know your views on the same. Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Amit Thorve and Abhay Patil We got one query about shifting Schedule start day to first day of next enrollment year. Here we are fine with company level template which are on scheduler, we can get next enrollment year's start date from company information. But, How about group level templates? they can have multiple companies involved and which companies enrollment period should we look for? Shall we look enrollment period for any one of the group companies or we shall not update schedule for group templates? let us know your views on the same. Thanks.
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE-Dashboard-RequirementsV3.1.docx [ 50686 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.doc [ 54807 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.doc [ 54807 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.doc [ 54808 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-3529 [ NF-3529 ]
            rajendra.pawar Rajendra Pawar (Inactive) made changes -
            Link This issue relates to WT-10092 [ WT-10092 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 11/Jul/17 10:03 AM
            • Time Spent:
              0.5h
               

              Discussion and Examining the slowness on OE Dashbaord

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 11/Jul/17 01:57 PM
            • Time Spent:
              1h
               
              <No comment>
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 13h [ 46800 ] 12h [ 43200 ]
            Time Spent 106.5h [ 383400 ] 107.5h [ 387000 ]
            Worklog Id 62465 [ 62465 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.doc [ 54808 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 54991 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Description Requirements are documented in the attached specs. (Attached here [^OE-Dashboard-RequirementsV3.1.docx] is in sync with [Confluence page|https://careerbuilder.atlassian.net/wiki/display/WTEDIDOC/OE+Dashboard+Requirements] as of June 26, 2017. Requirements are documented in the attached specs. It is kept in sync with [Confluence page|https://careerbuilder.atlassian.net/wiki/display/WTEDIDOC/OE+Dashboard+Requirements] as of July 11, 2017.
            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            Vinayak Kulkarni and Abhay Patil Here is what I feel should happen for Group Level Templates:

            1. The Black Out Period flag should be set to YES for all company level feeds under group level (if Black out Period needs to be set).
            2. If Black Out period flag is set to NO for any company feed under group level feed then Black Out period is considered as NO for that global level feed.
            3. If multiple companies feeds are grouped under Global Level feed and if those companies have different financial year in that case financial year of the first company in the sequence is considered to set the schedule.

            *Note: *As per my advice, we should not set black out period for global feeds which consists of multiple company level feeds having different financial year.

            CC-Cindy Wibbing, Van Nguyen, Chris Ellenberger, Damion M Velasquez, Kevin Hale, Rochelle Thomas, Nathaniel Cornejo-Walker

            Show
            amitthorve Amit Thorve (Inactive) added a comment - Vinayak Kulkarni and Abhay Patil Here is what I feel should happen for Group Level Templates: 1. The Black Out Period flag should be set to YES for all company level feeds under group level (if Black out Period needs to be set). 2. If Black Out period flag is set to NO for any company feed under group level feed then Black Out period is considered as NO for that global level feed. 3. If multiple companies feeds are grouped under Global Level feed and if those companies have different financial year in that case financial year of the first company in the sequence is considered to set the schedule. *Note: *As per my advice, we should not set black out period for global feeds which consists of multiple company level feeds having different financial year. CC- Cindy Wibbing , Van Nguyen , Chris Ellenberger , Damion M Velasquez , Kevin Hale , Rochelle Thomas , Nathaniel Cornejo-Walker
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 12/Jul/17 10:34 AM
            • Time Spent:
              1h
               

              Integration test planning along with Swapnil

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 13/Jul/17 11:58 AM
            • Time Spent:
              0.5h
               

              Status and Discussion

            aniruddha.dev Aniruddha Dev (Inactive) logged work - 14/Jul/17 05:23 PM
            • Time Spent:
              0.5h
               

              OE Dashboard weekend test planning along with swapnil

            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-10155 [ WT-10155 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 19/Jul/17 06:19 PM - edited
            • Time Spent:
              5h
               

              Integration and regression testing ,Data creation, Discussion among team, Bug Status Report Creation along with Swapnil, Mock Demo , Demo

            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.mht [ 56080 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.mht [ 56080 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 56081 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 54991 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Remaining Estimate 12h [ 43200 ] 11h [ 39600 ]
            Time Spent 107.5h [ 387000 ] 108.5h [ 390600 ]
            Worklog Id 65984 [ 65984 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue relates to WT-10283 [ WT-10283 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 56718 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 56081 ]
            Cindy.Wibbing Cindy Wibbing (Inactive) made changes -
            Attachment screenshot-2.png [ 56734 ]
            Hide
            Cindy.Wibbing Cindy Wibbing (Inactive) added a comment -

            Amit Thorve
            While doing a demo for the CE and CT teams today it was brought to our attention that the values set on the company page for Fiscal Start and Fiscal End dates is not driven by the renewal date for Open Enrollment but can be setup based on such things as life plans for the company. The company may have a renewal date of January 1 but have the Fiscal Settings on the company page set to July 1 because of the way the salary updates need to be addressed.

            In light of this information it sounds like we may need to make adjustments to the OE Dashboard to pull the renewal information instead of these fields.

            Show
            Cindy.Wibbing Cindy Wibbing (Inactive) added a comment - Amit Thorve While doing a demo for the CE and CT teams today it was brought to our attention that the values set on the company page for Fiscal Start and Fiscal End dates is not driven by the renewal date for Open Enrollment but can be setup based on such things as life plans for the company. The company may have a renewal date of January 1 but have the Fiscal Settings on the company page set to July 1 because of the way the salary updates need to be addressed. In light of this information it sounds like we may need to make adjustments to the OE Dashboard to pull the renewal information instead of these fields.
            Hide
            amitthorve Amit Thorve (Inactive) added a comment -

            Vinayak Kulkarni We need to check this out. Based on Cindy's above mentioned comment, we might need to keep this field editable. We will populate the values based on Fiscal year settings from Company Info but will allow the user to override the same.

            Show
            amitthorve Amit Thorve (Inactive) added a comment - Vinayak Kulkarni We need to check this out. Based on Cindy's above mentioned comment, we might need to keep this field editable. We will populate the values based on Fiscal year settings from Company Info but will allow the user to override the same.
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 11h [ 39600 ] 9.5h [ 34200 ]
            Time Spent 108.5h [ 390600 ] 110h [ 396000 ]
            Worklog Id 66913 [ 66913 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 9.5h [ 34200 ] 9h [ 32400 ]
            Time Spent 110h [ 396000 ] 110.5h [ 397800 ]
            Worklog Id 66990 [ 66990 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 9h [ 32400 ] 8h [ 28800 ]
            Time Spent 110.5h [ 397800 ] 111.5h [ 401400 ]
            Worklog Id 67033 [ 67033 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 8h [ 28800 ] 7.5h [ 27000 ]
            Time Spent 111.5h [ 401400 ] 112h [ 403200 ]
            Worklog Id 67177 [ 67177 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 7.5h [ 27000 ] 7h [ 25200 ]
            Time Spent 112h [ 403200 ] 112.5h [ 405000 ]
            Worklog Id 67483 [ 67483 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 7h [ 25200 ] 2.5h [ 9000 ]
            Time Spent 112.5h [ 405000 ] 117h [ 421200 ]
            Worklog Id 67516 [ 67516 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Worklog Id 67516 [ 67516 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Remaining Estimate 2.5h [ 9000 ] 2h [ 7200 ]
            Time Spent 117h [ 421200 ] 117.5h [ 423000 ]
            Worklog Id 67516 [ 67516 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Link This issue relates to WT-10347 [ WT-10347 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10481 [ WT-10481 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10482 [ WT-10482 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10483 [ WT-10483 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10484 [ WT-10484 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10485 [ WT-10485 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10486 [ WT-10486 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10487 [ WT-10487 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10488 [ WT-10488 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10489 [ WT-10489 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10490 [ WT-10490 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10491 [ WT-10491 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10492 [ WT-10492 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10493 [ WT-10493 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] Swapnil Eksambekar [ swapnil.eksambekar ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-10650 [ WT-10650 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue relates to WT-10592 [ WT-10592 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 23/Aug/17 12:53 PM - edited
            • Time Spent:
              4h
               

              Stage check in and testing

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Remaining Estimate 2h [ 7200 ] 0h [ 0 ]
            Time Spent 117.5h [ 423000 ] 121.5h [ 437400 ]
            Worklog Id 74110 [ 74110 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Worklog Id 74110 [ 74110 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 24/Aug/17 01:27 PM
            • Time Spent:
              2h
               

              Stage testing.

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 121.5h [ 437400 ] 123.5h [ 444600 ]
            Worklog Id 74138 [ 74138 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 28/Aug/17 04:40 PM
            • Time Spent:
              2.5h
               

              Basic OE Dashboard testing on stage.

            Hide
            abhay.patil Abhay Patil (Inactive) added a comment -

            Adding testing feedback reported by Van Nguyen.

            Error:
            Austin: template: TEST VSP Van
            EDI Analyst” field. I tried to overwrite this field with “Van Nguyen,” but I got a message stating “No changes found” after I clicked “Save.”

            In “Advanced Filtering,” there’s no option to “Check All” or “Uncheck All”

            Success:
            “OE Start Date” field. I added 10/01/2017 and it saved successfully.
            “OE End Date” field. I added 10/31/2017 and it saved successfully.
            “OE File Due Date” field. I added 12/01/2017 and it saved successfully.
            “Is New Structure” field. I clicked on the checkbox and it saved successfully.
            “OE File Sent Date” field. I added 12/01/2017 and it saved successfully.
            “Carrier Confirmation Date” field. I added 12/5/2017 and it saved successfully.
            “Data Discrepancies Processed” field. I added 12/6/2017 and it saved successfully.

            Show
            abhay.patil Abhay Patil (Inactive) added a comment - Adding testing feedback reported by Van Nguyen . Error : Austin: template: TEST VSP Van “ EDI Analyst” field. I tried to overwrite this field with “Van Nguyen,” but I got a message stating “No changes found” after I clicked “Save.” In “Advanced Filtering,” there’s no option to “Check All” or “Uncheck All” Success : “OE Start Date” field. I added 10/01/2017 and it saved successfully. “OE End Date” field. I added 10/31/2017 and it saved successfully. “OE File Due Date” field. I added 12/01/2017 and it saved successfully. “Is New Structure” field. I clicked on the checkbox and it saved successfully. “OE File Sent Date” field. I added 12/01/2017 and it saved successfully. “Carrier Confirmation Date” field. I added 12/5/2017 and it saved successfully. “Data Discrepancies Processed” field. I added 12/6/2017 and it saved successfully.
            Hide
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment -

            Hi Abhay Patil,

            We have created JIRA WT-10864 for above issue.

            Please check and let us know if you have any questions.

            Thanks,
            Ganesh

            Show
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) added a comment - Hi Abhay Patil , We have created JIRA WT-10864 for above issue. Please check and let us know if you have any questions. Thanks, Ganesh
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 123.5h [ 444600 ] 126h [ 453600 ]
            Worklog Id 75009 [ 75009 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: On Hold(10207)
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 31/Aug/17 01:10 PM
            • Time Spent:
              1h
               

              Discussion and QA estimates for Prod deployement

            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 126h [ 453600 ] 127h [ 457200 ]
            Worklog Id 76281 [ 76281 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10811 [ WT-10811 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to WT-10480 [ WT-10480 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            Hi Abhay and Amit,

            We need to discuss below one point related to OE dashboard.

            Currently, Whenever someone enters OE dates on company information page then those dates gets reflected into dashboard and after that those date cannot be modified from dashboard.

            For this year, there won't be any problems with this, However when we go to next year and come closer to next year's OE then these dates will still be there and user cannot modify it as those dates were entered on Company information.

            One solution to this could be reset "updated from company" flag ( we use this to determine whether to allow user to modify OE dates ) on a particular date automatically.
            This date could be OE end date of respective company. Let us know your views on same. Thanks.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - Hi Abhay and Amit, We need to discuss below one point related to OE dashboard. Currently, Whenever someone enters OE dates on company information page then those dates gets reflected into dashboard and after that those date cannot be modified from dashboard. For this year, there won't be any problems with this, However when we go to next year and come closer to next year's OE then these dates will still be there and user cannot modify it as those dates were entered on Company information. One solution to this could be reset "updated from company" flag ( we use this to determine whether to allow user to modify OE dates ) on a particular date automatically. This date could be OE end date of respective company. Let us know your views on same. Thanks.
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 11/Sep/17 12:26 PM
            • Time Spent:
              1h
               

              Production Dep discussion with Swapnil E

            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Attachment Observation.png [ 61273 ]
            Hide
            swapnil.eksambekar Swapnil Eksambekar (Inactive) added a comment -

            Hi Vinayak Kulkarni and Ganesh Sadawarte,

            Take a note of below observations:-

            1.As per implementation , During File importing we have to delete rows for the templates which we dont want to change as they are not reflected on OE dashboard,but when we insert any another value in deleted rows,it will create bad file for that with unknown Company ID .

            2.All data flushed out after making schedule off for Group / Company level templates,i.e values saved before scheduling off ,it will not persists on Dashboard again.(Editable fields such as EDI analyst,OE start date ,End date)

            3.: If OE start date and OE end date are editable from OE dashboard,after exporting it as per implementation ,we can change Dates from exporte file and Insert new dates,But for one company it should reflect one OE start date or end date for all templates ,which is not handled for importing.
            For example, If OE start date is 09/06/2017 and OE end date is 09/07/2017 for all templates , when we export it and done changes for only one template as OE start date 06/01/2017 and OE end date 06/06/2017 then it is only reflected for one template as shown in attachment below.
            It is causing discrepancy.

            CC-Amit ThorveAbhay PatilHrishikesh DeshpandeAniruddha DevGaurav SodaniRakesh Roy

            Show
            swapnil.eksambekar Swapnil Eksambekar (Inactive) added a comment - Hi Vinayak Kulkarni and Ganesh Sadawarte , Take a note of below observations :- 1.As per implementation , During File importing we have to delete rows for the templates which we dont want to change as they are not reflected on OE dashboard,but when we insert any another value in deleted rows,it will create bad file for that with unknown Company ID . 2.All data flushed out after making schedule off for Group / Company level templates,i.e values saved before scheduling off ,it will not persists on Dashboard again.(Editable fields such as EDI analyst,OE start date ,End date) 3.: If OE start date and OE end date are editable from OE dashboard,after exporting it as per implementation ,we can change Dates from exporte file and Insert new dates,But for one company it should reflect one OE start date or end date for all templates ,which is not handled for importing. For example, If OE start date is 09/06/2017 and OE end date is 09/07/2017 for all templates , when we export it and done changes for only one template as OE start date 06/01/2017 and OE end date 06/06/2017 then it is only reflected for one template as shown in attachment below. It is causing discrepancy. CC- Amit Thorve Abhay Patil Hrishikesh Deshpande Aniruddha Dev Gaurav Sodani Rakesh Roy
            swapnil.eksambekar Swapnil Eksambekar (Inactive) logged work - 12/Sep/17 01:23 PM
            • Time Spent:
              4h
               
              <No comment>
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Time Spent 127h [ 457200 ] 131h [ 471600 ]
            Worklog Id 78297 [ 78297 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 14/Sep/17 05:49 PM
            • Time Spent:
              1h
               

              OE dashboard production testing and discussion

            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue causes WT-11170 [ WT-11170 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 131h [ 471600 ] 132h [ 475200 ]
            Worklog Id 80141 [ 80141 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Assignee Swapnil Eksambekar [ swapnil.eksambekar ] Ganesh Sadawarte [ ganesh.sadawarte ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Status Local Testing [ 10200 ] Reopen in Local [ 10018 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Status Reopen in Local [ 10018 ] In Development [ 10007 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue causes NF-4174 [ NF-4174 ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Link This issue causes NF-4449 [ NF-4449 ]
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] Swapnil Eksambekar [ swapnil.eksambekar ]
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Swapnil Eksambekar [ swapnil.eksambekar ] Ganesh Sadawarte [ ganesh.sadawarte ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 132h [ 475200 ] 133h [ 478800 ]
            Worklog Id 82246 [ 82246 ]
            Hide
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment -

            As all linked WT tickets are assigned to QA, assigning parent ticket to QA as well.

            Show
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) added a comment - As all linked WT tickets are assigned to QA, assigning parent ticket to QA as well.
            Vinayak.Kulkarni Vinayak Kulkarni (Inactive) made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] Swapnil Eksambekar [ swapnil.eksambekar ]
            Pallavi.kulkarni Pallavi Kulkarni (Inactive) made changes -
            Link This issue relates to NF-4495 [ NF-4495 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4078 [ NF-4078 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4092 [ NF-4092 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4077 [ NF-4077 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4080 [ NF-4080 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4495 [ NF-4495 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4081 [ NF-4081 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4082 [ NF-4082 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4083 [ NF-4083 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4084 [ NF-4084 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4085 [ NF-4085 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4086 [ NF-4086 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4087 [ NF-4087 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4088 [ NF-4088 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4089 [ NF-4089 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4090 [ NF-4090 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4091 [ NF-4091 ]
            swapnil.eksambekar Swapnil Eksambekar (Inactive) made changes -
            Link This issue relates to NF-4497 [ NF-4497 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.docx [ 56718 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Attachment OE+Dashboard+Requirements.doc [ 63631 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status In Development [ 10007 ] Mockup Approval [ 10010 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Mockup Approval [ 10010 ] Mockup Approved [ 10012 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Mockup Approved [ 10012 ] In Development [ 10007 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Local Testing [ 10200 ] Pending for Stage Approval [ 10300 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Pending for Stage Approval [ 10300 ] Approved for Stage [ 10030 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Approved for Stage [ 10030 ] Stage Testing [ 10201 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Stage Testing [ 10201 ] Pending for Production Approval [ 10301 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Pending for Production Approval [ 10301 ] Approved for production [ 10034 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Status Approved for production [ 10034 ] Production Testing [ 10202 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Resolution Done [ 10000 ] Fixed [ 1 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            aniruddha.dev Aniruddha Dev (Inactive) logged work - 12/Oct/17 12:46 PM
            • Time Spent:
              2h
               

              Discussion and reply to Queries

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 12/Oct/17 01:03 PM
            • Time Spent:
              0.5h
               

              Need to discuss OE Dashboard questions

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 133h [ 478800 ] 133.5h [ 480600 ]
            Worklog Id 84597 [ 84597 ]
            aniruddha.dev Aniruddha Dev (Inactive) made changes -
            Time Spent 133.5h [ 480600 ] 135.5h [ 487800 ]
            Worklog Id 87768 [ 87768 ]
            rajendra.pawar Rajendra Pawar (Inactive) made changes -
            Link This issue relates to WT-12249 [ WT-12249 ]
            Transition Time In Source Status Execution Times
            Ganesh Sadawarte (Inactive) made transition -
            New Request Pending for Approval
            51d 7h 33m 1
            Ganesh Sadawarte (Inactive) made transition -
            Pending for Approval Approved for Development
            5s 1
            Ganesh Sadawarte (Inactive) made transition -
            Approved for Development In Development
            4d 21h 50m 1
            Swapnil Eksambekar (Inactive) made transition -
            In LB Testing Reopen in Local
            25d 17h 30m 1
            Swapnil Eksambekar (Inactive) made transition -
            Reopen in Local In Development
            4s 1
            Abhay Patil (Inactive) made transition -
            In Development Mockup Approval
            8d 13h 49m 1
            Abhay Patil (Inactive) made transition -
            Mockup Approval Mockup Approved
            8s 1
            Abhay Patil (Inactive) made transition -
            Mockup Approved In Development
            4s 1
            Abhay Patil (Inactive) made transition -
            In Development In LB Testing
            79d 7h 30m 2
            Abhay Patil (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            8s 1
            Abhay Patil (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            6s 1
            Abhay Patil (Inactive) made transition -
            Approved for Stage Stage Testing
            2s 1
            Abhay Patil (Inactive) made transition -
            Stage Testing Pending for Production Approval
            3s 1
            Abhay Patil (Inactive) made transition -
            Pending for Production Approval Approved for production
            7s 1
            Abhay Patil (Inactive) made transition -
            Approved for production In Production Testing
            3s 1
            Abhay Patil (Inactive) made transition -
            In Production Testing Production Complete
            16s 1
            Abhay Patil (Inactive) made transition -
            Production Complete Closed
            5d 3h 53m 1

              People

              Assignee:
              swapnil.eksambekar Swapnil Eksambekar (Inactive)
              Reporter:
              abhay.patil Abhay Patil (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              10 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 60h Original Estimate - 60h
                  60h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 135.5h
                  135.5h