WT -> Rate Cloning -> Does not work when we want to clone a rate with different start and end date

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Environment:
      Stage
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed

      Description

      Stage Production

      Try cloning a life rate (say Supp Sp Life) to another company - while cloning change the start and end dates of associated rate and click on clone

      Though system shows the rate cloned successfully message - rate is not getting cloned to the destination company.
      When you do cloning without changing start and end dates - this works perfectly fine

      CC - Prasad Pise Sachin Hingole Hrishikesh Deshpande Rakesh Roy Satya Jaideep Vinchurkar

        Attachments

        1. Checklist_WT-9389.doc
          27 kB
        2. clone rate.png
          clone rate.png
          177 kB
        3. WT-9389_Affected_Files.txt
          0.1 kB

          Issue Links

            Activity

            alankar.chavan Alankar Chavan (Inactive) created issue -
            jyoti.mayne Jyoti Mayne made changes -
            Field Original Value New Value
            Assignee Jyoti Mayne [ jyoti.mayne ] Rohit Shete [ rohit.shete ]
            jyoti.mayne Jyoti Mayne made changes -
            Developer Rohit Shete [ rohit.shete ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204)
            rohit.shete Rohit Shete (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: In Progress(10206)
            rohit.shete Rohit Shete (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            jyoti.mayne Jyoti Mayne logged work - 12/May/17 07:47 AM
            • Time Spent:
              0.25h
               

              discussion with Rohit

            rohit.shete Rohit Shete (Inactive) logged work - 12/May/17 02:44 PM
            • Time Spent:
              2h
               

              Task Related Discussion With jyoti and alankar. Analysis and Development

            rohit.shete Rohit Shete (Inactive) made changes -
            Remaining Estimate 5h [ 18000 ] 3h [ 10800 ]
            Time Spent 2h [ 7200 ]
            Worklog Id 45325 [ 45325 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Dev Due Date 15/May/2017
            jyoti.mayne Jyoti Mayne made changes -
            Remaining Estimate 3h [ 10800 ] 2.75h [ 9900 ]
            Time Spent 2h [ 7200 ] 2.25h [ 8100 ]
            Worklog Id 45350 [ 45350 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            rohit.shete Rohit Shete (Inactive) made changes -
            Code Reviewed By Harshawardhan Phalake [ 15301 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Attachment Checklist_WT-9389.doc [ 48120 ]
            Attachment WT-9389_Affected_Files.txt [ 48121 ]
            Hide
            rohit.shete Rohit Shete (Inactive) added a comment -

            WT-9389 : WT -> Rate Cloning -> Does not work when we want to clone a rate with different start and end date

            Hi Prasad Pise,

            Please find below 3C's:

            Concern Does not work when we want to clone a rate with different start and end date
            Cause Condition was missing for validating date range of different start and end date (in case date change for UI).
            Correction We have fixed code for this.

            Cc: Jyoti Mayne, Alankar Chavan, Harshawardhan Phalake, Umesh Kadam

            Show
            rohit.shete Rohit Shete (Inactive) added a comment - WT-9389 : WT -> Rate Cloning -> Does not work when we want to clone a rate with different start and end date Hi Prasad Pise , Please find below 3C's: Concern Does not work when we want to clone a rate with different start and end date Cause Condition was missing for validating date range of different start and end date (in case date change for UI). Correction We have fixed code for this. Cc: Jyoti Mayne , Alankar Chavan , Harshawardhan Phalake , Umesh Kadam
            rohit.shete Rohit Shete (Inactive) made changes -
            Code Review Date 15/May/2017
            rohit.shete Rohit Shete (Inactive) logged work - 15/May/17 12:43 PM - edited
            • Time Spent:
              5h
               

              Unit Test and Code Review by harsh and Impact Test and Merge On LB

            umesh.kadam Umesh Kadam (Inactive) logged work - 15/May/17 04:30 PM
            • Time Spent:
              0.5h
               

              Code review and discussion with Rohit

            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            rohit.shete Rohit Shete (Inactive) made changes -
            Assignee Rohit Shete [ rohit.shete ] Prasad Pise [ prasadp ]
            prasadp Prasad Pise (Inactive) made changes -
            Assignee Prasad Pise [ prasadp ] Alankar Chavan [ alankar.chavan ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Remaining Estimate 2.75h [ 9900 ] 2.25h [ 8100 ]
            Time Spent 2.25h [ 8100 ] 2.75h [ 9900 ]
            Worklog Id 46434 [ 46434 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Remaining Estimate 2.25h [ 8100 ] 0h [ 0 ]
            Time Spent 2.75h [ 9900 ] 6.25h [ 22500 ]
            Worklog Id 46434 [ 46434 ]
            umesh.kadam Umesh Kadam (Inactive) made changes -
            Time Spent 6.25h [ 22500 ] 6.75h [ 24300 ]
            Worklog Id 46512 [ 46512 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Alankar Chavan [ alankar.chavan ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            Assignee Hrishikesh Deshpande [ hrishikesh.deshpande ] Sanjana Jadhav [ sanjana.jadhav ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            alankar.chavan Alankar Chavan (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Hi Rohit Shete

            ASML
            Verified On LB.
            Not able to clone Rate using same date or By changing start and end date.
            verified same on stage. able to clone rate on stage.

            CC: Hrishikesh Deshpande Alankar Chavan

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Hi Rohit Shete ASML Verified On LB. Not able to clone Rate using same date or By changing start and end date. verified same on stage. able to clone rate on stage. CC: Hrishikesh Deshpande Alankar Chavan
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Re-open(10212)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Local Testing [ 10200 ] Reopen in Local [ 10018 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Assignee Sanjana Jadhav [ sanjana.jadhav ] Rohit Shete [ rohit.shete ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - - edited

            Verified On LB.
            clone to company working properly for same date and By changing start and end date.
            Not able to clone rate on same company.Log jira for same issue WT-9424.

            CC: Hrishikesh Deshpande Alankar Chavan

            Thanks,
            Sanjana Jadhav

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - - edited Verified On LB. clone to company working properly for same date and By changing start and end date. Not able to clone rate on same company.Log jira for same issue WT-9424 . CC: Hrishikesh Deshpande Alankar Chavan Thanks, Sanjana Jadhav
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Reopen in Local [ 10018 ] In Development [ 10007 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Assignee Rohit Shete [ rohit.shete ] Sanjana Jadhav [ sanjana.jadhav ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Re-open(10212) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 19/May/17 12:58 PM
            • Time Spent:
              3.2h
               

              Verified on LB

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 6.75h [ 24300 ] 9.95h [ 35820 ]
            Worklog Id 47195 [ 47195 ]
            rohit.shete Rohit Shete (Inactive) logged work - 19/May/17 01:08 PM - edited
            • Time Spent:
              0.5h
               

              Discussion With Alankar and Sanjana and Analysis

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 9.95h [ 35820 ] 10.95h [ 39420 ]
            Worklog Id 47218 [ 47218 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Remaining Estimate 0h [ 0 ] 0.5h [ 1800 ]
            Time Spent 10.95h [ 39420 ] 10.45h [ 37620 ]
            Worklog Id 47218 [ 47218 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Remaining Estimate 0.5h [ 1800 ] 0h [ 0 ]
            Time Spent 10.45h [ 37620 ] 11.45h [ 41220 ]
            Worklog Id 46434 [ 46434 ]
            alankar.chavan Alankar Chavan (Inactive) logged work - 19/May/17 01:33 PM
            • Time Spent:
              0.2h
               

              Discussion

            alankar.chavan Alankar Chavan (Inactive) made changes -
            Time Spent 11.45h [ 41220 ] 11.65h [ 41940 ]
            Worklog Id 47262 [ 47262 ]
            umesh.kadam Umesh Kadam (Inactive) made changes -
            Link This issue relates to WT-9424 [ WT-9424 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            rohit.shete Rohit Shete (Inactive) logged work - 24/May/17 01:10 PM
            • Time Spent:
              0.25h
               

              merge on stage

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 11.65h [ 41940 ] 11.9h [ 42840 ]
            Worklog Id 48474 [ 48474 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 26/May/17 05:03 AM
            • Time Spent:
              1h
               

              Testing on stage
              internal discussion

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 11.9h [ 42840 ] 12.9h [ 46440 ]
            Worklog Id 49027 [ 49027 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Attachment clone rate.png [ 49376 ]
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Verified on stage
            Austin for HSPL
            1.Try cloning a rate(Basic life) to another company(another company should be Austin for Hspl) - with same start and end date and also with different start and end date
            2.click on apply.Popup will occur such as"This rate will clone with inactive status eligibility. Do you want continue?" then click on OK
            3.Another popup occur such as "Do you want to clone rate plan design mapping?"
            4.Try to click on OK and CANCEL button

            Issue: OK and CANCEL button is not clickable
            refer attached screen shot:

            CC: Hrishikesh Deshpande Alankar Chavan

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Verified on stage Austin for HSPL 1.Try cloning a rate(Basic life) to another company(another company should be Austin for Hspl) - with same start and end date and also with different start and end date 2.click on apply.Popup will occur such as"This rate will clone with inactive status eligibility. Do you want continue?" then click on OK 3.Another popup occur such as "Do you want to clone rate plan design mapping?" 4.Try to click on OK and CANCEL button Issue: OK and CANCEL button is not clickable refer attached screen shot: CC: Hrishikesh Deshpande Alankar Chavan
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Re-open(10216)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Assignee Sanjana Jadhav [ sanjana.jadhav ] Rohit Shete [ rohit.shete ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Local Testing [ 10200 ] Reopen in Local [ 10018 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 26/May/17 12:54 PM
            • Time Spent:
              0.7h
               

              Log issue

            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 12.9h [ 46440 ] 13.6h [ 48960 ]
            Worklog Id 49404 [ 49404 ]
            Hide
            rohit.shete Rohit Shete (Inactive) added a comment -

            Hi Sanjana Jadhav,

            This is existing functionality when you try to cloning a rate to another company(another company should be Austin for Hspl) with same start and end date and also with different start and end date in this scenario OK and CANCEL button is not clickable.

            Thanks And Regards
            Rohit Shete.

            CC: Hrishikesh Deshpande, Alankar Chavan,Jyoti Mayne,Umesh Kadam,Harshawardhan Phalake

            Show
            rohit.shete Rohit Shete (Inactive) added a comment - Hi Sanjana Jadhav , This is existing functionality when you try to cloning a rate to another company(another company should be Austin for Hspl) with same start and end date and also with different start and end date in this scenario OK and CANCEL button is not clickable. Thanks And Regards Rohit Shete. CC: Hrishikesh Deshpande , Alankar Chavan , Jyoti Mayne , Umesh Kadam , Harshawardhan Phalake
            rohit.shete Rohit Shete (Inactive) made changes -
            Status Reopen in Local [ 10018 ] In Development [ 10007 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Assignee Rohit Shete [ rohit.shete ] Sanjana Jadhav [ sanjana.jadhav ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Link This issue relates to WT-9631 [ WT-9631 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 13.6h [ 48960 ] 13.9h [ 50040 ]
            Worklog Id 49593 [ 49593 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 30/May/17 06:18 AM
            • Time Spent:
              0.3h
               
              <No comment>
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Comment [ Verified on stage.
            able to clone Rate using same date or By changing start and end date.

            Thanks,
            Sanjana Jadhav.

            CC: [~hrishikesh.deshpande] [~alankar.chavan] ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Link This issue relates to NF-2486 [ NF-2486 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Re-open(10216) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Verified On stage.
            clone to company working properly for same date and By changing start and end date.
            Ready for production.

            Thanks,
            Sanjana jadhav

            CC: Rakesh Roy Hrishikesh Deshpande Sachin Hingole

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Verified On stage. clone to company working properly for same date and By changing start and end date. Ready for production. Thanks, Sanjana jadhav CC: Rakesh Roy Hrishikesh Deshpande Sachin Hingole
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 13.9h [ 50040 ] 14.4h [ 51840 ]
            Worklog Id 53962 [ 53962 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Worklog Id 53962 [ 53962 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 13/Jun/17 05:35 AM - edited
            • Time Spent:
              0.5h
               

              Verified on stage

            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            rohit.shete Rohit Shete (Inactive) logged work - 15/Jun/17 12:25 PM
            • Time Spent:
              0.25h
               

              Code check in on production

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 14.4h [ 51840 ] 14.65h [ 52740 ]
            Worklog Id 55487 [ 55487 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) logged work - 19/Jun/17 07:04 AM
            • Time Spent:
              0.4h
               

              Verified on production

            Hide
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment -

            Verified on production.
            clone to company working properly for same date and By changing start and end date.

            Thanks,
            Sanjana Jadhav

            CC:: Rakesh Roy Hrishikesh Deshpande Sachin Hingole

            Show
            sanjana.jadhav Sanjana Jadhav (Inactive) added a comment - Verified on production. clone to company working properly for same date and By changing start and end date. Thanks, Sanjana Jadhav CC:: Rakesh Roy Hrishikesh Deshpande Sachin Hingole
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Time Spent 14.65h [ 52740 ] 15.05h [ 54180 ]
            Worklog Id 56124 [ 56124 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            sanjana.jadhav Sanjana Jadhav (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Bug Severity Medium [ 16702 ]
            satyap Satya made changes -
            Environment_New Stage [ 18443 ]
            Transition Time In Source Status Execution Times
            Rohit Shete (Inactive) made transition -
            Open In Development
            8d 20h 46m 1
            Sanjana Jadhav (Inactive) made transition -
            In LB Testing Reopen in Local
            6d 19h 1m 2
            Rohit Shete (Inactive) made transition -
            Reopen in Local In Development
            3d 21m 2
            Rakesh Roy (Inactive) made transition -
            In Development In LB Testing
            18d 13h 5m 3
            Rakesh Roy (Inactive) made transition -
            In LB Testing Stage Testing
            3s 1
            Sanjana Jadhav (Inactive) made transition -
            Stage Testing In Production Testing
            6d 18h 20m 1
            Sanjana Jadhav (Inactive) made transition -
            In Production Testing Production Complete
            2d 23h 41m 1
            Sanjana Jadhav (Inactive) made transition -
            Production Complete Closed
            4s 1

              People

              Assignee:
              sanjana.jadhav Sanjana Jadhav (Inactive)
              Reporter:
              alankar.chavan Alankar Chavan (Inactive)
              Developer:
              Rohit Shete (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 5h Original Estimate - 5h
                  5h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 15.05h
                  15.05h