Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-9486

HSA Employer Contribution Proration - Quincy

    Details

    • Type: Change Request
    • Status: In Development
    • Priority: High
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Environment:
      Production
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Client
    • Company:
      All Clients/Multiple Clients
    • Item State:
      Development - On Hold
    • Sprint:
      WT Sprint 38 - Enhancement, WT Sprint 39 - Enhancement, WT Sprint 40 - Enhancement
    • Severity:
      Simple
    • Reported by Customer:
      BCC

      Description

      We are trying to use the employer contribution proration "No Employer Contribution After Specific Cut Off Date" and there is nowhere to put a date? Please advise.

        Attachments

          Issue Links

            Activity

            dkulling Debbie Kulling created issue -
            rakeshr Rakesh Roy (Inactive) made changes -
            Field Original Value New Value
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: Enrollment(10107)
            Hide
            prasad.patil Prasad Patil (Inactive) added a comment -

            Hi Debbie Kulling,

            We are waiting for internal response on this issue, will update you tomorrow.
            Thank You,

            -------------------------------------------------------------------------

            CC: Mandar Kulkarni, Vijay Siddha, Jaideep Vinchurkar

            Show
            prasad.patil Prasad Patil (Inactive) added a comment - Hi Debbie Kulling , We are waiting for internal response on this issue, will update you tomorrow. Thank You, ------------------------------------------------------------------------- CC: Mandar Kulkarni , Vijay Siddha , Jaideep Vinchurkar
            prasad.patil Prasad Patil (Inactive) logged work - 15/May/17 07:04 PM
            • Time Spent:
              2h
               

              Analysis and discussion with team.

            prasad.patil Prasad Patil (Inactive) made changes -
            Attachment Stage Cost and coverage HSA.jpg [ 48222 ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 2h [ 7200 ]
            Worklog Id 45776 [ 45776 ]
            Hide
            prasad.patil Prasad Patil (Inactive) added a comment -

            Hi Jyoti Mayne,

            We checked this issue on production and stage.

            • For HSA plan there is a field in 'Cost and Coverage' tab to select Employer prorate level.
            • In this field after selecting 'No Employer Contribution After Specific Cut Off Date', there is no place to enter the cut off date.

            Please refer the screen shot below for stage.

            We discussed this issue with Jaideep and Amruta, they suggested that the field for specific date selection should appear after selecting 'No Employer Contribution After Specific Cut Off Date' option.

            Request you to please look into this.
            Thank you,
            --------------------------------------------------------------------------------------------------------------

            CC: Mandar Kulkarni, Vijay Siddha, Jaideep Vinchurkar, Amruta Lohiya

            Show
            prasad.patil Prasad Patil (Inactive) added a comment - Hi Jyoti Mayne , We checked this issue on production and stage. For HSA plan there is a field in 'Cost and Coverage' tab to select Employer prorate level. In this field after selecting 'No Employer Contribution After Specific Cut Off Date' , there is no place to enter the cut off date. Please refer the screen shot below for stage. We discussed this issue with Jaideep and Amruta, they suggested that the field for specific date selection should appear after selecting 'No Employer Contribution After Specific Cut Off Date' option. Request you to please look into this. Thank you, -------------------------------------------------------------------------------------------------------------- CC: Mandar Kulkarni , Vijay Siddha , Jaideep Vinchurkar , Amruta Lohiya
            prasad.patil Prasad Patil (Inactive) made changes -
            Assignee Mandar Kulkarni [ mandark ] Jyoti Mayne [ jyoti.mayne ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Time Spent 2h [ 7200 ] 3h [ 10800 ]
            Worklog Id 45931 [ 45931 ]
            Hide
            dkulling Debbie Kulling added a comment -

            I really need an update on this.

            Show
            dkulling Debbie Kulling added a comment - I really need an update on this.
            prasad.patil Prasad Patil (Inactive) logged work - 16/May/17 06:24 PM
            • Time Spent:
              1h
               

              Analysis and discussion with team.

            Hide
            Kira.Hamilton Kira Hamilton (Inactive) added a comment -

            Hi,

            Can we please have an update?

            Show
            Kira.Hamilton Kira Hamilton (Inactive) added a comment - Hi, Can we please have an update?
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            Currently No employer contribution after specific cutoff date flag is not implemented in system. It is just exposed on cost and coverage screen for flexible spending plans.

            For this, we need to add one field to store cut off date on cost and coverage screen.

            Could you please confirm the functionality of this flag for employer coverage so that we can analyzed this request further.

            Cc: Satya, Kira Hamilton

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , Currently No employer contribution after specific cutoff date flag is not implemented in system. It is just exposed on cost and coverage screen for flexible spending plans. For this, we need to add one field to store cut off date on cost and coverage screen. Could you please confirm the functionality of this flag for employer coverage so that we can analyzed this request further. Cc: Satya , Kira Hamilton
            jyoti.mayne Jyoti Mayne made changes -
            Status Open [ 1 ] Waiting for Customer Input [ 10500 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Debbie Kulling [ dkulling ]
            jyoti.mayne Jyoti Mayne logged work - 22/May/17 05:04 PM
            • Time Spent:
              0.25h
               

              analysis

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 3h [ 10800 ] 3.25h [ 11700 ]
            Worklog Id 47826 [ 47826 ]
            Hide
            dkulling Debbie Kulling added a comment -

            If the customization is set to "no employer contribution after specific cut of date" a date field needs to be present.

            Example: If they date is set to Aug 1 and enrollments with an effective date after Aug 1st should not receive the employer contribution.

            Please let me know if this is something that is going to be able to be done quickly. The group that needs this is going live in about 3 weeks. If it is not going to be able to be done in that timeframe. Please suggest a work around.

            Show
            dkulling Debbie Kulling added a comment - If the customization is set to "no employer contribution after specific cut of date" a date field needs to be present. Example: If they date is set to Aug 1 and enrollments with an effective date after Aug 1st should not receive the employer contribution. Please let me know if this is something that is going to be able to be done quickly. The group that needs this is going live in about 3 weeks. If it is not going to be able to be done in that timeframe. Please suggest a work around.
            jyoti.mayne Jyoti Mayne made changes -
            Status Waiting for Customer Input [ 10500 ] In Progress [ 3 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Debbie Kulling [ dkulling ] Jyoti Mayne [ jyoti.mayne ]
            jyoti.mayne Jyoti Mayne logged work - 24/May/17 09:15 AM
            • Time Spent:
              0.5h
               

              analysis and discussion

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 24/May/17 12:06 PM
            • Time Spent:
              0.5h
               

              Internal Discussion with jyoti

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 3.25h [ 11700 ] 3.75h [ 13500 ]
            Worklog Id 48408 [ 48408 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            We have below queries regarding this implementation.

            1. Do we need to consider this change on export side on file?

            2. On Enroll now screen, following needs to implemented:

            • Text box will be added on cost and coverage screen for storing cut off date value.
            • On enroll now screen, we will compare election effective date with the cut off date and accordingly display employer Contribution.

            Fox example: If cut off date is 8/1/2017,

            • If today's date is less than cut off date
            • If today's date is exact cut off date
            • If today's date is greater than cut off date

            In all these 3 scenarios, following will be the output.

            Election Effective Date Display Employer Contribution
            5/24/2017 Yes
            8/1/2017 Yes
            10/1/2017 No

            Cc: Satya, Ganesh Sadawarte

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , We have below queries regarding this implementation. 1. Do we need to consider this change on export side on file? 2. On Enroll now screen, following needs to implemented: Text box will be added on cost and coverage screen for storing cut off date value. On enroll now screen, we will compare election effective date with the cut off date and accordingly display employer Contribution. Fox example: If cut off date is 8/1/2017, If today's date is less than cut off date If today's date is exact cut off date If today's date is greater than cut off date In all these 3 scenarios, following will be the output. Election Effective Date Display Employer Contribution 5/24/2017 Yes 8/1/2017 Yes 10/1/2017 No Cc: Satya , Ganesh Sadawarte
            jyoti.mayne Jyoti Mayne made changes -
            Status In Progress [ 3 ] Waiting for Customer Input [ 10500 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Debbie Kulling [ dkulling ]
            Hide
            dkulling Debbie Kulling added a comment -

            If the cutoff date is 8/1 any elections effective 8/1 or greater would not receive the ER contribution. You second scenario is incorrect.

            I don't understand what you are asking "Do we need to consider this change on export side on file?"

            Show
            dkulling Debbie Kulling added a comment - If the cutoff date is 8/1 any elections effective 8/1 or greater would not receive the ER contribution. You second scenario is incorrect. I don't understand what you are asking "Do we need to consider this change on export side on file?"
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            Ok. We will implement on Enroll Now Screen as per your above comment. But we will complete this task in 2nd week of June on Enrollment side.

            Election Effective Date Display Employer Contribution
            5/24/2017 Yes
            8/1/2017 No
            10/1/2017 No

            One query: Do we need to hide Employer Contribution after cut off date on 'View Enrollment Summary' and 'Confirmation Statement Page' also?

            Regarding export change Ganesh Sadawarte will give explanation.

            Cc: Satya, Vinayak Kulkarni

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , Ok. We will implement on Enroll Now Screen as per your above comment. But we will complete this task in 2nd week of June on Enrollment side. Election Effective Date Display Employer Contribution 5/24/2017 Yes 8/1/2017 No 10/1/2017 No One query: Do we need to hide Employer Contribution after cut off date on 'View Enrollment Summary' and 'Confirmation Statement Page' also? Regarding export change Ganesh Sadawarte will give explanation. Cc: Satya , Vinayak Kulkarni
            jyoti.mayne Jyoti Mayne made changes -
            Status Waiting for Customer Input [ 10500 ] In Progress [ 3 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Debbie Kulling [ dkulling ] Ganesh Sadawarte [ ganesh.sadawarte ]
            jyoti.mayne Jyoti Mayne logged work - 25/May/17 07:53 AM - edited
            • Time Spent:
              0.75h
               

              analysis

            Hide
            dkulling Debbie Kulling added a comment -

            No I do not hide the ER contribution. It should just show as zero

            Show
            dkulling Debbie Kulling added a comment - No I do not hide the ER contribution. It should just show as zero
            Hide
            dkulling Debbie Kulling added a comment -

            We need to have a call about this. I think that we need to change the way the proration works. There needs to be a rule for proration (Monthly, Per Pay Period, Quarterly) and then a separate rule for cut off date.

            I am available at 8am CST tomorrow (5/26).

            Show
            dkulling Debbie Kulling added a comment - We need to have a call about this. I think that we need to change the way the proration works. There needs to be a rule for proration (Monthly, Per Pay Period, Quarterly) and then a separate rule for cut off date. I am available at 8am CST tomorrow (5/26).
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            We will call you on Monday(5/29) at your 8 am CST. Is this fine?

            Cc: Satya, Ganesh Sadawarte, Vinayak Kulkarni

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , We will call you on Monday(5/29) at your 8 am CST. Is this fine? Cc: Satya , Ganesh Sadawarte , Vinayak Kulkarni
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Ganesh Sadawarte [ ganesh.sadawarte ] Jyoti Mayne [ jyoti.mayne ]
            Hide
            dkulling Debbie Kulling added a comment -

            We are on Holiday on Monday. Can we do 7:30 am CST on Tuesday. Please send invite

            Show
            dkulling Debbie Kulling added a comment - We are on Holiday on Monday. Can we do 7:30 am CST on Tuesday. Please send invite
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 3.75h [ 13500 ] 4h [ 14400 ]
            Worklog Id 49655 [ 49655 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 4h [ 14400 ] 4.5h [ 16200 ]
            Worklog Id 49655 [ 49655 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 4.5h [ 16200 ] 5h [ 18000 ]
            Worklog Id 49665 [ 49665 ]
            jyoti.mayne Jyoti Mayne made changes -
            Issue Type Support Activity [ 10301 ] Change Request [ 10002 ]
            Status In Progress [ 3 ] New Request [ 10029 ]
            Support Task Type Customization [ 11204 ]
            Workflow WT_Support [ 41444 ] WT_Features [ 42867 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            We have sent you invite of meeting 7:30 am CST Tuesday.

            Cc:Satya

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , We have sent you invite of meeting 7:30 am CST Tuesday. Cc: Satya
            jyoti.mayne Jyoti Mayne logged work - 30/May/17 05:55 PM
            • Time Spent:
              0.5h
               

              call

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 5h [ 18000 ] 5.5h [ 19800 ]
            Worklog Id 50812 [ 50812 ]
            Hide
            dkulling Debbie Kulling added a comment -

            are we have in a call this morning?

            Show
            dkulling Debbie Kulling added a comment - are we have in a call this morning?
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            Yes, we are in call. Please join us.

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , Yes, we are in call. Please join us.
            Ganesh.sadawarte Ganesh Sadawarte (Inactive) logged work - 31/May/17 01:27 PM
            • Time Spent:
              0.5h
               

              HSA Discusion Call

            Ganesh.sadawarte Ganesh Sadawarte (Inactive) made changes -
            Time Spent 5.5h [ 19800 ] 6h [ 21600 ]
            Worklog Id 51249 [ 51249 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            For HSA, We need to add one more option of Semi-Annually with facility to choose cutoff date for each option.

            Currently there are 4 options available for Employer Proration:
            1. Monthly
            2. Quarterly
            3. Pay Period
            4. No Employer Contribution after specific cutoff date

            User should be able to use either or combination like Monthly + cutoff date or only cutoff date.

            If cut off date is say 8/1/2017, for new election only we need to implment following:
            1. Elections made on 8/1/17 or greater would receive $0 employer contribution.
            2. Election made before cut off date will receive full employer contribution.

            Note: This is generic change for HSA employer contribution.

            We will share mock up and scenario document with you Debbie Kulling once we take this for analysis.
            This is expected to complete by 1st of August.

            Cc: Debbie Kulling,Satya,Amruta Lohiya,Vijay Siddha,Vinayak Kulkarni,Ganesh Sadawarte,Rakesh Roy

            Show
            jyoti.mayne Jyoti Mayne added a comment - For HSA, We need to add one more option of Semi-Annually with facility to choose cutoff date for each option. Currently there are 4 options available for Employer Proration: 1. Monthly 2. Quarterly 3. Pay Period 4. No Employer Contribution after specific cutoff date User should be able to use either or combination like Monthly + cutoff date or only cutoff date. If cut off date is say 8/1/2017, for new election only we need to implment following: 1. Elections made on 8/1/17 or greater would receive $0 employer contribution. 2. Election made before cut off date will receive full employer contribution. Note: This is generic change for HSA employer contribution. We will share mock up and scenario document with you Debbie Kulling once we take this for analysis. This is expected to complete by 1st of August. Cc: Debbie Kulling , Satya , Amruta Lohiya , Vijay Siddha , Vinayak Kulkarni , Ganesh Sadawarte , Rakesh Roy
            jyoti.mayne Jyoti Mayne logged work - 31/May/17 03:51 PM
            • Time Spent:
              0.75h
               

              call and shared MOM

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 6h [ 21600 ] 6.75h [ 24300 ]
            Worklog Id 51410 [ 51410 ]
            Hide
            dkulling Debbie Kulling added a comment -

            I need an update on completion. We are now in the second week of June?

            Show
            dkulling Debbie Kulling added a comment - I need an update on completion. We are now in the second week of June?
            Hide
            dkulling Debbie Kulling added a comment -

            Can I please get an update on this

            Show
            dkulling Debbie Kulling added a comment - Can I please get an update on this
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hello Debbie Kulling,

            In current sprint we are working on bugs. We will take this task in next sprint 7/3 to 7/14 for analysis and will share updates.

            Cc: Satya, Jaideep Vinchurkar

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hello Debbie Kulling , In current sprint we are working on bugs. We will take this task in next sprint 7/3 to 7/14 for analysis and will share updates. Cc: Satya , Jaideep Vinchurkar
            jyoti.mayne Jyoti Mayne made changes -
            Developer Rohit Shete [ rohit.shete ]
            Original Estimate 0h [ 0 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Rohit Shete [ rohit.shete ]
            Hide
            dkulling Debbie Kulling added a comment -

            Is there an ETA on completing this?

            Show
            dkulling Debbie Kulling added a comment - Is there an ETA on completing this?
            jaideep.vinchurkar Jaideep Vinchurkar (Inactive) made changes -
            Sprint WT Sprint 32 - Enhancement [ 75 ]
            jaideep.vinchurkar Jaideep Vinchurkar (Inactive) made changes -
            Rank Ranked lower
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hello Debbie Kulling,

            We have taken this task for Sprint 7/3 - 7/14. We will share ETA on 7/3.

            Cc: Satya

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hello Debbie Kulling , We have taken this task for Sprint 7/3 - 7/14. We will share ETA on 7/3. Cc: Satya
            rohit.shete Rohit Shete (Inactive) made changes -
            Attachment WT_9486_Change_Request_Implementation.doc [ 53942 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Attachment WT_9486_Change_Request_Implementation.doc [ 53942 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Comment [ Hi Jyoti,

            Please Find following attachment.


            Thanks And Reagrds,
            Rohit shete
            ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Attachment WT-9486 Estimates.xls [ 53996 ]
            Hide
            rohit.shete Rohit Shete (Inactive) added a comment -

            Hi Debbie Kulling

            Please find attached ETA.
            WT-9486 Estimates.xls

            Thanks And Regards,
            Rohit Shete.

            CC:Jyoti Mayne

            Show
            rohit.shete Rohit Shete (Inactive) added a comment - Hi Debbie Kulling Please find attached ETA. WT-9486 Estimates.xls Thanks And Regards, Rohit Shete. CC: Jyoti Mayne
            rohit.shete Rohit Shete (Inactive) logged work - 03/Jul/17 03:53 PM - edited
            • Time Spent:
              7.5h
               

              ETA Documentation And Scenario discussion and Analysis and code debug and development

            rohit.shete Rohit Shete (Inactive) logged work - 04/Jul/17 11:50 AM
            • Time Spent:
              6h
               

              Work on enhancement and development and analysis and unit testing

            jyoti.mayne Jyoti Mayne logged work - 04/Jul/17 03:06 PM
            • Time Spent:
              1h
               

              discussion and code debug

            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 12/Jul/2017
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            QA Rashmita Dudhe [ rashmita.dudhe ]
            rohit.shete Rohit Shete (Inactive) logged work - 06/Jul/17 03:43 PM
            • Time Spent:
              7.5h
               

              Discussion With Jyoti And debug solve issue on cost and coverage page add textbox,show semi annually option, and insert update operation

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 6.75h [ 24300 ] 14.25h [ 51300 ]
            Worklog Id 61286 [ 61286 ]
            jyoti.mayne Jyoti Mayne logged work - 06/Jul/17 03:49 PM
            • Time Spent:
              0.5h
               

              discussion

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 14.25h [ 51300 ] 21.25h [ 76500 ]
            Worklog Id 61289 [ 61289 ]
            rohit.shete Rohit Shete (Inactive) logged work - 07/Jul/17 02:21 PM
            • Time Spent:
              5.5h
               

              Code debug,Analysis, discussion with jyoti, development and unit testing

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 21.25h [ 76500 ] 26.75h [ 96300 ]
            Worklog Id 61754 [ 61754 ]
            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 12/Jul/2017 13/Jul/2017
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 26.75h [ 96300 ] 27.75h [ 99900 ]
            Worklog Id 61772 [ 61772 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 27.75h [ 99900 ] 28.25h [ 101700 ]
            Worklog Id 61788 [ 61788 ]
            jyoti.mayne Jyoti Mayne logged work - 07/Jul/17 04:07 PM
            • Time Spent:
              1h
               

              discussion, analysis and code debugging

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 28.25h [ 101700 ] 29.25h [ 105300 ]
            Worklog Id 61797 [ 61797 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            rohit.shete Rohit Shete (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206)
            jyoti.mayne Jyoti Mayne logged work - 10/Jul/17 03:14 PM
            • Time Spent:
              0.5h
               

              discussion and code analysis

            rohit.shete Rohit Shete (Inactive) logged work - 10/Jul/17 03:50 PM - edited
            • Time Spent:
              4.5h
               

              Analysis And Unit testing and development and discussion

            Hide
            dkulling Debbie Kulling added a comment -

            Can you please provide an ETA for completion

            Show
            dkulling Debbie Kulling added a comment - Can you please provide an ETA for completion
            jyoti.mayne Jyoti Mayne logged work - 11/Jul/17 03:26 PM
            • Time Spent:
              0.5h
               

              enroll now discussion

            rohit.shete Rohit Shete (Inactive) logged work - 11/Jul/17 03:41 PM - edited
            • Time Spent:
              6.5h
               

              Analysis, unit Testing,Development,discussion related ui with jyoti and umesh

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 29.25h [ 105300 ] 34.75h [ 125100 ]
            Worklog Id 62483 [ 62483 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 34.75h [ 125100 ] 39.25h [ 141300 ]
            Worklog Id 62486 [ 62486 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Worklog Id 62486 [ 62486 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 39.25h [ 141300 ] 40.25h [ 144900 ]
            Worklog Id 62483 [ 62483 ]
            umesh.kadam Umesh Kadam (Inactive) logged work - 11/Jul/17 04:30 PM
            • Time Spent:
              1h
               

              Cut off date : code debugging and discussion with Rohit Shete for DateTimePicker issue.

            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            It will be available on Local Environment by 7/13. After QA Approval, we will move it further and share Stage and Production due dates.

            Cc: Satya, Vijay Siddha, Gaurav Sodani

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , It will be available on Local Environment by 7/13. After QA Approval, we will move it further and share Stage and Production due dates. Cc: Satya , Vijay Siddha , Gaurav Sodani
            rohit.shete Rohit Shete (Inactive) logged work - 12/Jul/17 03:24 PM
            • Time Spent:
              7.5h
               

              Analysis and unit testing and development and discussion and debug code

            jyoti.mayne Jyoti Mayne logged work - 12/Jul/17 03:36 PM
            • Time Spent:
              1h
               

              code debugging and discussion

            jyoti.mayne Jyoti Mayne made changes -
            Status New Request [ 10029 ] Pending for Approval [ 10002 ]
            jyoti.mayne Jyoti Mayne made changes -
            Status Pending for Approval [ 10002 ] Approved for Development [ 10003 ]
            jyoti.mayne Jyoti Mayne made changes -
            Status Approved for Development [ 10003 ] In Development [ 10007 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 13/Jul/17 12:06 PM
            • Time Spent:
              0.5h
               

              Discussion with Rashmita @ Enhancement Analysis

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 40.25h [ 144900 ] 40.75h [ 146700 ]
            Worklog Id 63086 [ 63086 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Hi Debbie Kulling

            We need to confirm expected result of below two scenarios:

            #Scenario 1

            Suppose Cut off date is 06/01/2017

            Employee 1st Election 01/01/2017 - 05/31/2017 with EE coverage
            2nd election 06/01/2017 - Null with EE+Family Coverage

            Expected: Here for 04/01/2017 election, we will not consider cut off date functionality as it is continue election not new one. Is this correct?

            #Scenario 2

            Suppose Cut off date is 06/01/2017

            Employee 1st Election 01/01/2017 - 01/31/2017 with EE coverage
            2nd election 05/15/2017 - Null with EE+Family Coverage

            Expected: Here for second election 05/015/2017, we will consider cut off functionality as it is new election. Is this correct?

            Could please review above scenario and let us know about output?

            Thanks,
            Rashmita

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Hi Debbie Kulling We need to confirm expected result of below two scenarios: #Scenario 1 Suppose Cut off date is 06/01/2017 Employee 1st Election 01/01/2017 - 05/31/2017 with EE coverage 2nd election 06/01/2017 - Null with EE+Family Coverage Expected: Here for 04/01/2017 election, we will not consider cut off date functionality as it is continue election not new one. Is this correct? #Scenario 2 Suppose Cut off date is 06/01/2017 Employee 1st Election 01/01/2017 - 01/31/2017 with EE coverage 2nd election 05/15/2017 - Null with EE+Family Coverage Expected: Here for second election 05/015/2017, we will consider cut off functionality as it is new election. Is this correct? Could please review above scenario and let us know about output? Thanks, Rashmita
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment WT_New_prorateoption_Scenarios.xls [ 55339 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 13/Jul/17 12:59 PM
            • Time Spent:
              6h
               
              <No comment>
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Attached some scenarios.
            Scenarios writing is still continue.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Attached some scenarios. Scenarios writing is still continue.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 40.75h [ 146700 ] 46.75h [ 168300 ]
            Worklog Id 63125 [ 63125 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Code Review Date 13/Jul/2017
            Code Reviewed By Jyoti Mayne [ 11910 ]
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            jyoti.mayne Jyoti Mayne logged work - 13/Jul/17 03:12 PM
            • Time Spent:
              3.25h
               

              code debugging and fixing, code review, unit and impact testing

            rohit.shete Rohit Shete (Inactive) logged work - 13/Jul/17 03:24 PM - edited
            • Time Spent:
              8h
               

              Analysis and Discussion and Development and unit testing

            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Sprint WT Sprint 32 - Enhancement [ 75 ] WT Sprint 33 - Enhancement [ 78 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            We have some queries regarding few scenarios mentioned above. Can we discuss this in today's report team call?

            Cc: Satya, Rashmita Dudhe, Prasanna Karlekar

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , We have some queries regarding few scenarios mentioned above. Can we discuss this in today's report team call? Cc: Satya , Rashmita Dudhe , Prasanna Karlekar
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment WT_New_prorateoption_Scenarios.xls [ 55339 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Hsa_Cut_off_scenario.xls [ 55576 ]
            Hide
            dkulling Debbie Kulling added a comment -

            You are correct in both scenarios below you are correct. I did change the date in bold because I think it was a typo

            #Scenario 1

            Suppose Cut off date is 06/01/2017

            Employee 1st Election 01/01/2017 - 05/31/2017 with EE coverage
            2nd election 06/01/2017 - Null with EE+Family Coverage

            Expected: Here for *06/01/2017 *election, we will not consider cut off date functionality as it is continue election not new one. Is this correct?

            #Scenario 2

            Suppose Cut off date is 06/01/2017

            Employee 1st Election 01/01/2017 - 01/31/2017 with EE coverage
            2nd election 05/15/2017 - Null with EE+Family Coverage

            Expected: Here for second election 05/015/2017, we will consider cut off functionality as it is new election. Is this correct?

            Show
            dkulling Debbie Kulling added a comment - You are correct in both scenarios below you are correct. I did change the date in bold because I think it was a typo #Scenario 1 Suppose Cut off date is 06/01/2017 Employee 1st Election 01/01/2017 - 05/31/2017 with EE coverage 2nd election 06/01/2017 - Null with EE+Family Coverage Expected: Here for *06/01/2017 *election, we will not consider cut off date functionality as it is continue election not new one. Is this correct? #Scenario 2 Suppose Cut off date is 06/01/2017 Employee 1st Election 01/01/2017 - 01/31/2017 with EE coverage 2nd election 05/15/2017 - Null with EE+Family Coverage Expected: Here for second election 05/015/2017, we will consider cut off functionality as it is new election. Is this correct?
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            As discussed in today's call, if on plan only No Employer Contribution After Specific Cut Off Date is customized, in that case for terminated HSA election, we will calculate ER coverage as per EE payroll schedule by considering lapsed pay cycle.

            Rashmita will attached detailed scenario document.

            Cc: Satya, Rashmita Dudhe

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , As discussed in today's call, if on plan only No Employer Contribution After Specific Cut Off Date is customized, in that case for terminated HSA election, we will calculate ER coverage as per EE payroll schedule by considering lapsed pay cycle. Rashmita will attached detailed scenario document. Cc: Satya , Rashmita Dudhe
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 46.75h [ 168300 ] 47.25h [ 170100 ]
            Worklog Id 63562 [ 63562 ]
            rohit.shete Rohit Shete (Inactive) logged work - 14/Jul/17 03:19 PM
            • Time Spent:
              4h
               

              Analysis and discussion with team and client and development and unit testing

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 47.25h [ 170100 ] 51.25h [ 184500 ]
            Worklog Id 63566 [ 63566 ]
            jyoti.mayne Jyoti Mayne logged work - 14/Jul/17 03:21 PM - edited
            • Time Spent:
              4h
               

              HSA Pro ration existing scenarios checking, cut off, semi-annually and cut off+ semi annually scenario creation and review with Rashmita, discussion with amruta, call with debbie

            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 51.25h [ 184500 ] 57.25h [ 206100 ]
            Worklog Id 63571 [ 63571 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 57.25h [ 206100 ] 64.75h [ 233100 ]
            Worklog Id 63572 [ 63572 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 64.75h [ 233100 ] 65.25h [ 234900 ]
            Worklog Id 63574 [ 63574 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 65.25h [ 234900 ] 66.25h [ 238500 ]
            Worklog Id 63584 [ 63584 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Hsa_Cut_off_scenario.xls [ 55576 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA Cut Off.xls [ 55600 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 14/Jul/17 03:50 PM
            • Time Spent:
              7h
               

              test scenario writing discussion with Jyoti and call with Debbie

            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Hi Debbie Kulling,

            Please refer attached Scenario sheet HSA cut off for calculation of Semi-annually, Semi annually+Cut-off and Only Cut-off with expected result.

            Thanks,
            Rashmita

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Hi Debbie Kulling , Please refer attached Scenario sheet HSA cut off for calculation of Semi-annually, Semi annually+Cut-off and Only Cut-off with expected result. Thanks, Rashmita
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 66.25h [ 238500 ] 73.25h [ 263700 ]
            Worklog Id 63594 [ 63594 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Comment [
                We are reproduce this issue on stage but we down same company on local and check but issue not reproduce. May be patch build issue on stage.

             Thanks And Regards,
              Rohit Shete.

            CC: [~jyoti.mayne], [~alankar.chavan] ]
            jyoti.mayne Jyoti Mayne made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: Development(10200)Level 1 values: On Hold(10207)
            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 13/Jul/2017 19/Jul/2017
            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 19/Jul/2017 20/Jul/2017
            umesh.kadam Umesh Kadam (Inactive) made changes -
            Time Spent 73.25h [ 263700 ] 74.25h [ 267300 ]
            Worklog Id 63762 [ 63762 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hello Debbie Kulling,

            Could you please go through attached 'HSA Cut Off.xls' once and confirmed, so that we can continue with development for related scenarios.

            Cc: Satya, Gaurav Sodani, Amruta Lohiya

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hello Debbie Kulling , Could you please go through attached 'HSA Cut Off.xls' once and confirmed, so that we can continue with development for related scenarios. Cc: Satya , Gaurav Sodani , Amruta Lohiya
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 74.25h [ 267300 ] 77.5h [ 279000 ]
            Worklog Id 64069 [ 64069 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 77.5h [ 279000 ] 81.5h [ 293400 ]
            Worklog Id 64071 [ 64071 ]
            jyoti.mayne Jyoti Mayne made changes -
            Worklog Id 64071 [ 64071 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 81.5h [ 293400 ] 82.5h [ 297000 ]
            Worklog Id 63571 [ 63571 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 82.5h [ 297000 ] 83h [ 298800 ]
            Worklog Id 61289 [ 61289 ]
            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 20/Jul/2017
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hello Debbie Kulling,

            Did you get chance to look at scenarios? Please confirm so that we can start development for same.

            Cc: Satya, Gaurav Sodani

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hello Debbie Kulling , Did you get chance to look at scenarios? Please confirm so that we can start development for same. Cc: Satya , Gaurav Sodani
            Hide
            dkulling Debbie Kulling added a comment -

            Yes and BCC is reviewing them. I followed up with them today and they said they will have a response on Monday

            Show
            dkulling Debbie Kulling added a comment - Yes and BCC is reviewing them. I followed up with them today and they said they will have a response on Monday
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 83h [ 298800 ] 89h [ 320400 ]
            Worklog Id 66190 [ 66190 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 89h [ 320400 ] 90h [ 324000 ]
            Worklog Id 63571 [ 63571 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hello Debbie Kulling,

            Do we have any update on this?

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hello Debbie Kulling , Do we have any update on this?
            Hide
            dkulling Debbie Kulling added a comment -

            They are still working on it. The scenarios have brought to light some different issues. We are trying to figure out what we are going to do. I will get back to you as soon as possible.

            Show
            dkulling Debbie Kulling added a comment - They are still working on it. The scenarios have brought to light some different issues. We are trying to figure out what we are going to do. I will get back to you as soon as possible.
            jyoti.mayne Jyoti Mayne made changes -
            Sprint WT Sprint 33 - Enhancement [ 78 ]
            Hide
            dkulling Debbie Kulling added a comment -

            Hi There,

            Attached are the responses to the scenarios. I think that we should have a call to discuss.

            Show
            dkulling Debbie Kulling added a comment - Hi There, Attached are the responses to the scenarios. I think that we should have a call to discuss.
            dkulling Debbie Kulling made changes -
            Attachment Copy of HSA Cut Off.xls [ 57245 ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment - - edited

            Hi Debbie Kulling,

            Thank you for the verification of scenarios. We will go through all scenarios and update you about call.

            Cc: Satya, Gaurav Sodani

            Show
            jyoti.mayne Jyoti Mayne added a comment - - edited Hi Debbie Kulling , Thank you for the verification of scenarios. We will go through all scenarios and update you about call. Cc: Satya , Gaurav Sodani
            jyoti.mayne Jyoti Mayne logged work - 08/Aug/17 04:49 PM
            • Time Spent:
              1h
               

              analysis

            jyoti.mayne Jyoti Mayne logged work - 14/Aug/17 08:06 AM
            • Time Spent:
              0.5h
               

              analysis

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 90h [ 324000 ] 91h [ 327600 ]
            Worklog Id 71543 [ 71543 ]
            Hide
            dkulling Debbie Kulling added a comment -

            Can I please get an update on this

            Show
            dkulling Debbie Kulling added a comment - Can I please get an update on this
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,,

            We are done with analysis. Can we have call today at 7 am CST?

            Cc: Satya, Gaurav Sodani, Rashmita Dudhe

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling ,, We are done with analysis. Can we have call today at 7 am CST? Cc: Satya , Gaurav Sodani , Rashmita Dudhe
            jyoti.mayne Jyoti Mayne logged work - 16/Aug/17 08:27 AM
            • Time Spent:
              1h
               

              call with Debbie

            jyoti.mayne Jyoti Mayne made changes -
            Assignee Rohit Shete [ rohit.shete ] Jyoti Mayne [ jyoti.mayne ]
            jyoti.mayne Jyoti Mayne made changes -
            Developer Rohit Shete [ rohit.shete ] Jyoti Mayne [ jyoti.mayne ]
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            As discussed in 8/16 call, could you please confirm with client what ER contribution should be for attached scenario of Semi-annually also regarding One time Pro ration where to specify prorate period?

            Cc: Satya, Gaurav Sodani, Rashmita Dudhe

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , As discussed in 8/16 call, could you please confirm with client what ER contribution should be for attached scenario of Semi-annually also regarding One time Pro ration where to specify prorate period? Cc: Satya , Gaurav Sodani , Rashmita Dudhe
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Debbie Kulling [ dkulling ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 91h [ 327600 ] 91.5h [ 329400 ]
            Worklog Id 74194 [ 74194 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 91.5h [ 329400 ] 92.5h [ 333000 ]
            Worklog Id 74208 [ 74208 ]
            Hide
            dkulling Debbie Kulling added a comment -

            Can we please have a call to discuss this. Tuesday at 8am CST or Wednesday at 8am CST

            Show
            dkulling Debbie Kulling added a comment - Can we please have a call to discuss this. Tuesday at 8am CST or Wednesday at 8am CST
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Debbie Kulling,

            Yes Debbie, can we can discuss today at 8.30 am CST?

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Debbie Kulling , Yes Debbie, can we can discuss today at 8.30 am CST?
            jyoti.mayne Jyoti Mayne logged work - 29/Aug/17 05:33 PM
            • Time Spent:
              0.25h
               

              webx invitation and waiting for reply to join for call

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 92.5h [ 333000 ] 92.75h [ 333900 ]
            Worklog Id 75580 [ 75580 ]
            jyoti.mayne Jyoti Mayne made changes -
            Code Review Date 13/Jul/2017
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 20/Sep/17 04:28 AM
            • Time Spent:
              1h
               

              call with debbie

            jyoti.mayne Jyoti Mayne logged work - 20/Sep/17 03:29 PM - edited
            • Time Spent:
              1.5h
               

              scenario discussion with Amit and Call with Client

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 92.75h [ 333900 ] 93.75h [ 337500 ]
            Worklog Id 80052 [ 80052 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 93.75h [ 337500 ] 95.25h [ 342900 ]
            Worklog Id 80753 [ 80753 ]
            jyoti.mayne Jyoti Mayne made changes -
            Worklog Id 80753 [ 80753 ]
            jyoti.mayne Jyoti Mayne made changes -
            Assignee Debbie Kulling [ dkulling ] Jyoti Mayne [ jyoti.mayne ]
            jyoti.mayne Jyoti Mayne made changes -
            Dev Due Date 13/Oct/2017
            Dev Estimates 120
            jyoti.mayne Jyoti Mayne made changes -
            Item State Parent values: Development(10200)Level 1 values: On Hold(10207) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            jyoti.mayne Jyoti Mayne made changes -
            Sprint WT Sprint 38 - Enhancement [ 88 ]
            rohit.shete Rohit Shete (Inactive) logged work - 28/Sep/17 02:49 PM
            • Time Spent:
              5h
               
              • meeting with amruta, jyoti,rashmita
              • disbursment implement
              • scenario analysis
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 95.25h [ 342900 ] 100.25h [ 360900 ]
            Worklog Id 82379 [ 82379 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Attachment DisbursementImplementation.png [ 62991 ]
            Hide
            rohit.shete Rohit Shete (Inactive) added a comment -

            Hi Debbie Kulling,

            We will be adding following fields on cost and coverage screen. Please find below screen shot.

            User is able to customized either Employer Proration or Disbursement.

            We also want to discuss some scenarios with client. Can we have call tomorrow? Please share time for same.

            Cc: Amruta Lohiya, Jyoti Mayne

            Show
            rohit.shete Rohit Shete (Inactive) added a comment - Hi Debbie Kulling , We will be adding following fields on cost and coverage screen. Please find below screen shot. User is able to customized either Employer Proration or Disbursement . We also want to discuss some scenarios with client. Can we have call tomorrow? Please share time for same. Cc: Amruta Lohiya , Jyoti Mayne
            rohit.shete Rohit Shete (Inactive) made changes -
            Assignee Jyoti Mayne [ jyoti.mayne ] Rohit Shete [ rohit.shete ]
            jyoti.mayne Jyoti Mayne logged work - 28/Sep/17 05:13 PM
            • Time Spent:
              1h
               

              disbursement scenario discussion

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 100.25h [ 360900 ] 101.25h [ 364500 ]
            Worklog Id 82479 [ 82479 ]
            rohit.shete Rohit Shete (Inactive) logged work - 29/Sep/17 02:39 PM
            • Time Spent:
              6h
               
              • analysis
              • scenario discussion with jyoti,amruta,rashmita
              • unit testing
              • code development
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 101.25h [ 364500 ] 107.25h [ 386100 ]
            Worklog Id 82885 [ 82885 ]
            jyoti.mayne Jyoti Mayne logged work - 29/Sep/17 06:04 PM
            • Time Spent:
              0.5h
               

              Disbursement requirement explanation to Rohit and scenario analysis

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 107.25h [ 386100 ] 107.75h [ 387900 ]
            Worklog Id 82928 [ 82928 ]
            rohit.shete Rohit Shete (Inactive) logged work - 03/Oct/17 02:43 PM
            • Time Spent:
              8h
               
              • Discusion
              • Analysis
              • Unit Testing
              • Development
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 107.75h [ 387900 ] 115.75h [ 416700 ]
            Worklog Id 83051 [ 83051 ]
            jyoti.mayne Jyoti Mayne logged work - 04/Oct/17 07:02 AM
            • Time Spent:
              0.25h
               

              Semi-annual scenario review

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA_Semiannally Scenario.xls [ 63436 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 04/Oct/17 11:47 AM
            • Time Spent:
              1h
               

              Scenario Creation

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 115.75h [ 416700 ] 116.75h [ 420300 ]
            Worklog Id 83190 [ 83190 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA_Semiannally Scenario.xls [ 63436 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA_Semiannally Scenario.xls [ 63437 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA_Semiannally Scenario.xls [ 63437 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment HSA_Semiannally Scenario.xls [ 63439 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 04/Oct/17 02:17 PM
            • Time Spent:
              0.5h
               

              call with Debbie

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 116.75h [ 420300 ] 117.25h [ 422100 ]
            Worklog Id 83262 [ 83262 ]
            rohit.shete Rohit Shete (Inactive) logged work - 04/Oct/17 03:57 PM
            • Time Spent:
              8h
               
              • working on disbursement enhancement
              • development
              • analysis
              • discussion with jyoti and rashmita
              • unit testing
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 117.25h [ 422100 ] 125.25h [ 450900 ]
            Worklog Id 83273 [ 83273 ]
            jyoti.mayne Jyoti Mayne logged work - 05/Oct/17 08:22 AM
            • Time Spent:
              0.75h
               

              scenario explanation to Rohit

            rohit.shete Rohit Shete (Inactive) logged work - 05/Oct/17 02:57 PM
            • Time Spent:
              3h
               
              • unit testing
              • analysis
            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 06/Oct/17 02:45 AM
            • Time Spent:
              1h
               

              Scenario creation

            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Sprint WT Sprint 38 - Enhancement [ 88 ] WT Sprint 38 - Enhancement, WT Sprint 39 - Enhancement [ 88, 91 ]
            satyap Satya made changes -
            Link This issue relates to ST-370 [ ST-370 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 125.25h [ 450900 ] 128.25h [ 461700 ]
            Worklog Id 83974 [ 83974 ]
            jyoti.mayne Jyoti Mayne logged work - 12/Oct/17 10:09 AM - edited
            • Time Spent:
              2h
               

              scenario writing

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 128.25h [ 461700 ] 129.25h [ 465300 ]
            Worklog Id 84648 [ 84648 ]
            jyoti.mayne Jyoti Mayne logged work - 13/Oct/17 10:09 AM - edited
            • Time Spent:
              3h
               

              scenario writing for semi annual, cut off and semi annual+cut off

            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 129.25h [ 465300 ] 130.25h [ 468900 ]
            Worklog Id 85069 [ 85069 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 130.25h [ 468900 ] 134.25h [ 483300 ]
            Worklog Id 85070 [ 85070 ]
            jyoti.mayne Jyoti Mayne made changes -
            Remaining Estimate 0h [ 0 ] 1h [ 3600 ]
            Time Spent 134.25h [ 483300 ] 133.25h [ 479700 ]
            Worklog Id 85070 [ 85070 ]
            jyoti.mayne Jyoti Mayne made changes -
            Remaining Estimate 1h [ 3600 ] 0h [ 0 ]
            Time Spent 133.25h [ 479700 ] 134.25h [ 483300 ]
            Worklog Id 85069 [ 85069 ]
            jyoti.mayne Jyoti Mayne made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: On Hold(10207)
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Amruta Lohiya will be taking call for disbursement discussion with client.

            Show
            jyoti.mayne Jyoti Mayne added a comment - Amruta Lohiya will be taking call for disbursement discussion with client.
            rohit.shete Rohit Shete (Inactive) logged work - 20/Oct/17 04:51 PM - edited
            • Time Spent:
              3h
               
              • Analysis document
              • scenario read
            rohit.shete Rohit Shete (Inactive) logged work - 23/Oct/17 12:44 PM
            • Time Spent:
              7h
               
              • Disbursement scenario unit testing
              • Disbursement + Cutoff implementation
              • Disbursement + Cutoff unit testing
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 134.25h [ 483300 ] 141.25h [ 508500 ]
            Worklog Id 86081 [ 86081 ]
            rohit.shete Rohit Shete (Inactive) logged work - 24/Oct/17 12:48 PM
            • Time Spent:
              7.5h
               
              • Disbursement scenario unit testing
              • Disbursement + Cutoff unit testing
              • Prorate - bi-weekly implementation and discussion with rashmita and jyoti
              • Analysis
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 141.25h [ 508500 ] 148.75h [ 535500 ]
            Worklog Id 86083 [ 86083 ]
            jyoti.mayne Jyoti Mayne logged work - 24/Oct/17 05:10 PM
            • Time Spent:
              0.5h
               

              scenario discussion

            rashmita.dudhe Rashmita Dudhe (Inactive) logged work - 25/Oct/17 04:07 AM
            • Time Spent:
              1h
               

              Scenario discussion with rohit

            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Time Spent 148.75h [ 535500 ] 149.75h [ 539100 ]
            Worklog Id 86169 [ 86169 ]
            jyoti.mayne Jyoti Mayne logged work - 25/Oct/17 08:39 AM
            • Time Spent:
              0.5h
               

              cut off scenario discussion

            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Sprint WT Sprint 38 - Enhancement, WT Sprint 39 - Enhancement [ 88, 91 ] WT Sprint 38 - Enhancement, WT Sprint 39 - Enhancement, WT Sprint 40 - Enhancement [ 88, 91, 93 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: On Hold(10207) Parent values: Development(10200)Level 1 values: In Progress(10206)
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Dev Due Date 13/Oct/2017 03/Nov/2017
            rohit.shete Rohit Shete (Inactive) logged work - 25/Oct/17 03:37 PM
            • Time Spent:
              8h
               
              • Disbursement Development
              • Unit Testing Scenario
              • Cut off Logic implementation
              • Table Creation
              • metadata code creation
              • Anlysis
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 149.75h [ 539100 ] 150.25h [ 540900 ]
            Worklog Id 86520 [ 86520 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 150.25h [ 540900 ] 150.75h [ 542700 ]
            Worklog Id 86591 [ 86591 ]
            rohit.shete Rohit Shete (Inactive) logged work - 26/Oct/17 03:29 PM
            • Time Spent:
              5h
               
              • Disbursement unit testing
              • UI Development (curd operation) and analysis , unit testing senario , jquery implementation
              • Unit Test cut off
              • Debug Code
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 150.75h [ 542700 ] 155.75h [ 560700 ]
            Worklog Id 86800 [ 86800 ]
            jyoti.mayne Jyoti Mayne logged work - 27/Oct/17 12:26 PM
            • Time Spent:
              0.5h
               

              plan design customization discussion
              additional scenarios testing

            rohit.shete Rohit Shete (Inactive) logged work - 27/Oct/17 02:35 PM
            • Time Spent:
              5.5h
               
              • Unit Testing Functionality
              • Time Spend on Svn issue
              • UI development (j query functionality)
              • Discussion with jyoti
              • Localization changes
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 155.75h [ 560700 ] 161.25h [ 580500 ]
            Worklog Id 87099 [ 87099 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 161.25h [ 580500 ] 169.25h [ 609300 ]
            Worklog Id 87107 [ 87107 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 169.25h [ 609300 ] 169.5h [ 610200 ]
            Worklog Id 87126 [ 87126 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 169.5h [ 610200 ] 170.25h [ 612900 ]
            Worklog Id 87143 [ 87143 ]
            jyoti.mayne Jyoti Mayne made changes -
            Time Spent 170.25h [ 612900 ] 170.75h [ 614700 ]
            Worklog Id 87174 [ 87174 ]
            rohit.shete Rohit Shete (Inactive) logged work - 28/Oct/17 05:07 PM - edited
            • Time Spent:
              1h
               
              • Unit Testing
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 170.75h [ 614700 ] 173.75h [ 625500 ]
            Worklog Id 87214 [ 87214 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Worklog Id 87214 [ 87214 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Time Spent 173.75h [ 625500 ] 174.75h [ 629100 ]
            Worklog Id 88036 [ 88036 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Worklog Id 88036 [ 88036 ]
            rohit.shete Rohit Shete (Inactive) made changes -
            Company All Clients/Multiple Clients [ 18434 ]
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            rohit.shete Rohit Shete (Inactive) made changes -
            Link This issue relates to NF-5067 [ NF-5067 ]
            Hide
            gaurav.sodani Gaurav Sodani (Inactive) added a comment -

            Hi All,
            Attaching development approval email to work on this ticket: Unable to embed resource: Re Sprint 38 Enhancement Starting from 925 and Ending on 1006.msg of type application/octet-stream
            Regards
            Gaurav

            Show
            gaurav.sodani Gaurav Sodani (Inactive) added a comment - Hi All, Attaching development approval email to work on this ticket: Unable to embed resource: Re Sprint 38 Enhancement Starting from 925 and Ending on 1006.msg of type application/octet-stream Regards Gaurav
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Environment Production [ 18442 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Approval status Approved for development [ 18453 ]
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: Development(10200)Level 1 values: On Hold(10207)
            gaurav.sodani Gaurav Sodani (Inactive) made changes -
            Development Approval Yes [ 18474 ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Link This issue relates to DEV-2126 [ DEV-2126 ]
            prasad.patil Prasad Patil (Inactive) made changes -
            Link This issue relates to DEV-2127 [ DEV-2127 ]
            Hide
            satyap Satya added a comment -

            This ticket has been linked to Dev-2126 just to track previous requirements & linked Jira tickets.

            Show
            satyap Satya added a comment - This ticket has been linked to Dev-2126 just to track previous requirements & linked Jira tickets.
            Transition Time In Source Status Execution Times
            Jyoti Mayne made transition -
            Open Waiting for Customer Input
            9d 19h 31m 1
            Jyoti Mayne made transition -
            In Progress Waiting for Customer Input
            6h 8m 1
            Jyoti Mayne made transition -
            Waiting for Customer Input In Progress
            2d 11h 12m 2
            Jyoti Mayne made transition -
            In Progress New Request
            4d 8h 59m 1
            Jyoti Mayne made transition -
            New Request Pending for Approval
            44d 13h 31m 1
            Jyoti Mayne made transition -
            Pending for Approval Approved for Development
            59s 1
            Jyoti Mayne made transition -
            Approved for Development In Development
            2s 1

              People

              Assignee:
              rohit.shete Rohit Shete (Inactive)
              Reporter:
              dkulling Debbie Kulling
              Account Executive:
              Debbie Kulling
              Developer:
              Jyoti Mayne
              QA:
              Rashmita Dudhe (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              9 Start watching this issue

                Dates

                Created:
                Updated:
                Dev Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0h
                  0h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 174.75h
                  174.75h