Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-5534

UiRefresh - NH effective date rules on plan design is overriding the additional eligibility

    Details

    • Type: Bug
    • Status: Resolution Setting
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Environment:
      Stage
    • Bug Type:
      Functional
    • Bug Severity:
      Critical
    • Module:
      BenAdmin - EDS
    • Reported by:
      Implementation
    • Company:
      All Clients/Multiple Clients
    • Stage Company Name:
      BioRad
    • Item State:
      Stage QA - Production Deployment on Hold
    • Sprint:
      WT Sprint 41

      Description

      When the New Hire rule is setup on the plan design, in the Eligibility tab, to be effective 6 months from DOH this rules overrides the Additional Eligibility rule (AND IS new hire = to NO) this means when the new hire rule is setup on the plan the NH ends up seeing the plan in the NH enrollment tunnel. They should not be able to see the plan if they are a NH.

      Speaking with Amit Thorve it was advised that the "The eligibility should always take a precedence. If eligibility fails then plans should not be available for employee."

      Please review and provide feedback on when this bug can be corrected.

      CC:Gary Cunninghampeggy fiedlerRobyn AdkisonYamilka CocaAmit Thorve

        Attachments

          Issue Links

            Activity

            niteen.surwase Niteen Surwase (Inactive) created issue -
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Field Original Value New Value
            Link This issue clones WT-12271 [ WT-12271 ]
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Component/s UI Refresh [ 10902 ]
            Component/s BenAdmin [ 10000 ]
            Key WT-12816 NF-5534
            Project WORKTERRA [ 10000 ] New Features 2017 [ 11000 ]
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Summary CLONE - NH effective date rules on plan design is overriding the additional eligibility UiRefresh - NH effective date rules on plan design is overriding the additional eligibility
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Code Reviewed By Swapnil Pandhare [ 11900 ]
            Developer Niteen Surwase [ niteen.surwase ]
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Assignee Priya Dhamande [ priya.dhamande ] Niteen Surwase [ niteen.surwase ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Assignee Niteen Surwase [ niteen.surwase ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Link This issue relates to NF-5566 [ NF-5566 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Link This issue relates to NF-5567 [ NF-5567 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Remaining Estimate 15h [ 54000 ] 10h [ 36000 ]
            Time Spent 5h [ 18000 ]
            Worklog Id 97328 [ 97328 ]
            niteen.surwase Niteen Surwase (Inactive) made changes -
            Remaining Estimate 10h [ 36000 ] 9.25h [ 33300 ]
            Time Spent 5h [ 18000 ] 5.75h [ 20700 ]
            Worklog Id 97449 [ 97449 ]
            priya.dhamande Priya Dhamande (Inactive) made changes -
            Remaining Estimate 9.25h [ 33300 ] 8.25h [ 29700 ]
            Time Spent 5.75h [ 20700 ] 6.75h [ 24300 ]
            Worklog Id 97328 [ 97328 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status Stage Testing [ 10201 ] Resolution Setting [ 11616 ]

              People

              Assignee:
              hrishikesh.deshpande Hrishikesh Deshpande (Inactive)
              Reporter:
              niteen.surwase Niteen Surwase (Inactive)
              Developer:
              Niteen Surwase (Inactive)
              QA:
              Hrishikesh Deshpande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 15h
                  15h
                  Remaining:
                  Time Spent - 6.75h Remaining Estimate - 8.25h
                  8.25h
                  Logged:
                  Time Spent - 6.75h Remaining Estimate - 8.25h
                  6.75h