Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-5664

CHMC - UAT - Status steps not showing for 1095-B report

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UI Refresh
    • Labels:
      None
    • Environment:
      Pre Production
    • Bug Type:
      Functional
    • Bug Severity:
      Medium
    • Module:
      BenAdmin
    • Reported by:
      Client
    • Company:
      All Clients/Multiple Clients
    • Item State:
      Stage QA - Production Deployment on Hold
    • UAT For:
      UI Refresh

      Description

      strong textCredentials Used:
      Account: CHMC
      User ID: dianawg
      Password: Password@1

      Issue:
      I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

      Side note: I have been waiting for long but report is still not generated but without the steps, I cannot tell if it is stuck on one status or still running.

      How it should work:
      All the statuses should be shown so user know the page is still running.

        Attachments

        1. 304.png
          304.png
          150 kB
        2. NF-5664.png
          NF-5664.png
          74 kB

          Issue Links

            Activity

            diana Diana Wong (Inactive) created issue -
            diana Diana Wong (Inactive) made changes -
            Field Original Value New Value
            Link This issue clones NF-5460 [ NF-5460 ]
            diana Diana Wong (Inactive) made changes -
            Attachment NF-5664.png [ 71327 ]
            diana Diana Wong (Inactive) made changes -
            Description *Credentials Used:*
            Account:
            User ID:
            Password:

            *Issue:*
            To fill in

            *How it should work:*
            To fill in


            *Credentials Used:*
            Account: CHMC
            User ID: dianawg
            Password: Password@1

            *Issue:*
            I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

            *How it should work:*
            All the statuses should be shown so user know the page is still running.

             !NF-5664.png|thumbnail!


            diana Diana Wong (Inactive) made changes -
            Description *Credentials Used:*
            Account: CHMC
            User ID: dianawg
            Password: Password@1

            *Issue:*
            I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

            *How it should work:*
            All the statuses should be shown so user know the page is still running.

             !NF-5664.png|thumbnail!


            *Credentials Used:*
            Account: CHMC
            User ID: dianawg
            Password: Password@1

            *Issue:*
            I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

            Side note: I have been waiting for long but report is still not generated but without the steps, I cannot tell if it is stuck on one status or still running.

            *How it should work:*
            All the statuses should be shown so user know the page is still running.

             !NF-5664.png|thumbnail!


            nidhi.kaul Nidhi Kaul (Inactive) made changes -
            Assignee Nidhi Kaul [ nidhi.kaul ] Prasanna Karlekar [ prasanna ]
            Hide
            prasanna Prasanna Karlekar (Inactive) added a comment -

            Hi Ramya Tantry,

            Please look into this.

            Thank you!

            cc: Nandkumar Prabhakar Karlekar, Nidhi Kaul

            Show
            prasanna Prasanna Karlekar (Inactive) added a comment - Hi Ramya Tantry , Please look into this. Thank you! cc: Nandkumar Prabhakar Karlekar , Nidhi Kaul
            prasanna Prasanna Karlekar (Inactive) made changes -
            Assignee Prasanna Karlekar [ prasanna ] Ramya Tantry [ ramya.tantry ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Assignee Ramya Tantry [ ramya.tantry ] Mahendra Mungase [ mahendra.mungase ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Description *Credentials Used:*
            Account: CHMC
            User ID: dianawg
            Password: Password@1

            *Issue:*
            I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

            Side note: I have been waiting for long but report is still not generated but without the steps, I cannot tell if it is stuck on one status or still running.

            *How it should work:*
            All the statuses should be shown so user know the page is still running.

             !NF-5664.png|thumbnail!


            *strong text**Credentials Used:*
            Account: CHMC
            User ID: dianawg
            Password: Password@1

            *Issue:*
            I logged in as a Partner and access CHMC account. I clicked on IRS Report, added a new report and opted for 1095-B report. It is taking a long time but the issue is that in the interim there is a popup for the status but it is only showing a blank box. Only when one status is done and moving to next status, it flashes the listing and status momentarily (unable to capture screenshot for that)

            Side note: I have been waiting for long but report is still not generated but without the steps, I cannot tell if it is stuck on one status or still running.

            *How it should work:*
            All the statuses should be shown so user know the page is still running.

             !NF-5664.png|thumbnail!


            Hide
            mahendra.mungase Mahendra Mungase (Inactive) added a comment -

            Hi Kumar Chhajed

            We have analyzed this issue on Preprod and observed that it exists.For Step to repro please follow above steps.

            Mahendra

            Cc- Smita Pawar Sachin Hingole Ramya Tantry

            Show
            mahendra.mungase Mahendra Mungase (Inactive) added a comment - Hi Kumar Chhajed We have analyzed this issue on Preprod and observed that it exists.For Step to repro please follow above steps. Mahendra Cc- Smita Pawar Sachin Hingole Ramya Tantry
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Assignee Mahendra Mungase [ mahendra.mungase ] Kumar Chhajed [ kumar.chhajed ]
            kumar.chhajed Kumar Chhajed (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: On Hold(10207)
            diana Diana Wong (Inactive) made changes -
            Attachment 304.png [ 71342 ]
            Hide
            diana Diana Wong (Inactive) added a comment -

            Mahendra Mungase Kumar Chhajed To help illustrate the issue, I have recorded the issue. You can see that the cursor will flash and the bottom left corner will indicate periodically it is still interacting with site. At around 3:04, you can see the slight moment when the statuses are shown before disappearing again.

            Show
            diana Diana Wong (Inactive) added a comment - Mahendra Mungase Kumar Chhajed To help illustrate the issue, I have recorded the issue . You can see that the cursor will flash and the bottom left corner will indicate periodically it is still interacting with site. At around 3:04, you can see the slight moment when the statuses are shown before disappearing again.
            nidhi.kaul Nidhi Kaul (Inactive) made changes -
            Status Open [ 1 ] In Development [ 10007 ]
            nidhi.kaul Nidhi Kaul (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: On Hold(10207) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            mahendra.mungase Mahendra Mungase (Inactive) logged work - 06/Jan/18 07:11 AM
            • Time Spent:
              0.5h
               

              Bug verification

            kumar.chhajed Kumar Chhajed (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209)
            kumar.chhajed Kumar Chhajed (Inactive) made changes -
            Code Review Date 08/Jan/2018
            Code Reviewed By Ramya Tantry [ 13001 ]
            Dev Due Date 08/Jan/2018
            Root Cause Bug [ 18430 ]
            Hide
            kumar.chhajed Kumar Chhajed (Inactive) added a comment -

            3C's -
            Concern - CHMC - UAT - Status steps not showing for 1095-B report
            Cause - We have used an jquery callback function $.when which includes an .then() method. When the ajax call is completed means the report processing is complete, after that .then() method is called. In azure environment the .then() method is not getting executed.
            Correction - We have used Jquery.Deferred function to resolve this issue.

            Show
            kumar.chhajed Kumar Chhajed (Inactive) added a comment - 3C's - Concern - CHMC - UAT - Status steps not showing for 1095-B report Cause - We have used an jquery callback function $.when which includes an .then() method. When the ajax call is completed means the report processing is complete, after that .then() method is called. In azure environment the .then() method is not getting executed. Correction - We have used Jquery.Deferred function to resolve this issue.
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Local Testing(10209) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            kumar.chhajed Kumar Chhajed (Inactive) made changes -
            Assignee Kumar Chhajed [ kumar.chhajed ] Mahendra Mungase [ mahendra.mungase ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            Hide
            mahendra.mungase Mahendra Mungase (Inactive) added a comment -

            We have verified this issue on CodeMap on "For QA-CHMC-Azure" and we observed that it showing current progress for 1095B.

            Mahendra

            Show
            mahendra.mungase Mahendra Mungase (Inactive) added a comment - We have verified this issue on CodeMap on "For QA-CHMC-Azure" and we observed that it showing current progress for 1095B. Mahendra
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
            Hide
            mahendra.mungase Mahendra Mungase (Inactive) added a comment -

            Hi Diana Wong

            We have verified this issue on Pre-prod " JE Dunn For HSPL" and we observed that it showing current progress for 1095B.

            For ACA - We run ACA for last tax year, not for current year so we would suggest customization for 1095B is

            From date - 01/01/2017 - 12/31/2017

            Benefit Type - Medical

            Mahendra

            Show
            mahendra.mungase Mahendra Mungase (Inactive) added a comment - Hi Diana Wong We have verified this issue on Pre-prod " JE Dunn For HSPL" and we observed that it showing current progress for 1095B. For ACA - We run ACA for last tax year, not for current year so we would suggest customization for 1095B is From date - 01/01/2017 - 12/31/2017 Benefit Type - Medical Mahendra
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Assignee Mahendra Mungase [ mahendra.mungase ] Diana Wong [ diana ]
            Hide
            diana Diana Wong (Inactive) added a comment -

            Kumar Chhajed Mahendra Mungase I was still able to reproduce the flashing error for 1095-B report. You can see the recording here. Note: the video is 10mins long because that's how long it took for report to be ready but you don't need to sit through).

            Additionally now that 1095-C is fixed, I am getting the same flashing error there (recording here).

            Can please see the recording and advise if this is intended?

            Show
            diana Diana Wong (Inactive) added a comment - Kumar Chhajed Mahendra Mungase I was still able to reproduce the flashing error for 1095-B report. You can see the recording here . Note: the video is 10mins long because that's how long it took for report to be ready but you don't need to sit through). Additionally now that 1095-C is fixed, I am getting the same flashing error there (recording here ). Can please see the recording and advise if this is intended?
            diana Diana Wong (Inactive) made changes -
            Assignee Diana Wong [ diana ] Kumar Chhajed [ kumar.chhajed ]
            mahendra.mungase Mahendra Mungase (Inactive) logged work - 10/Jan/18 07:18 AM
            • Time Spent:
              0.5h
               

              Bug verification on CodeMap

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 10/Jan/18 07:26 AM
            • Time Spent:
              0.5h
               

              Bug verification on Preprod

            nidhi.kaul Nidhi Kaul (Inactive) made changes -
            Assignee Kumar Chhajed [ kumar.chhajed ] Mahendra Mungase [ mahendra.mungase ]
            Hide
            nidhi.kaul Nidhi Kaul (Inactive) added a comment -

            Please check.

            Show
            nidhi.kaul Nidhi Kaul (Inactive) added a comment - Please check.
            Hide
            ramya.tantry Ramya Tantry (Inactive) added a comment -

            Hi Diana Wong,

            It is not a flashing error.It is intended. Since 1095B/C are long running report,processing status is shown on the popup.Every 5 seconds,the popup data is refreshed to show the latest status of the report.
            However, sometimes due to network slowness issue, popup data is refreshed after some interval.

            CC:Nandkumar Prabhakar Karlekar,Sachin Hingole,Mahendra Mungase,Smita Pawar,Nidhi Kaul

            Show
            ramya.tantry Ramya Tantry (Inactive) added a comment - Hi Diana Wong , It is not a flashing error.It is intended. Since 1095B/C are long running report,processing status is shown on the popup.Every 5 seconds,the popup data is refreshed to show the latest status of the report. However, sometimes due to network slowness issue, popup data is refreshed after some interval. CC: Nandkumar Prabhakar Karlekar , Sachin Hingole , Mahendra Mungase , Smita Pawar , Nidhi Kaul
            ramya.tantry Ramya Tantry (Inactive) made changes -
            Assignee Mahendra Mungase [ mahendra.mungase ] Diana Wong [ diana ]
            Hide
            diana Diana Wong (Inactive) added a comment -

            Ramya Tantry, thanks for the update. Can advise if this is the same user experience in production? Nonetheless, we can leave it for now and see if we hear any feedback on concern on this performance. Thank you.

            Show
            diana Diana Wong (Inactive) added a comment - Ramya Tantry , thanks for the update. Can advise if this is the same user experience in production? Nonetheless, we can leave it for now and see if we hear any feedback on concern on this performance. Thank you.
            diana Diana Wong (Inactive) made changes -
            Assignee Diana Wong [ diana ] Ramya Tantry [ ramya.tantry ]
            Hide
            ramya.tantry Ramya Tantry (Inactive) added a comment -

            Hi Diana Wong,

            Yes, the functionality is the same on Production environment too.

            Show
            ramya.tantry Ramya Tantry (Inactive) added a comment - Hi Diana Wong , Yes, the functionality is the same on Production environment too.
            ramya.tantry Ramya Tantry (Inactive) made changes -
            Assignee Ramya Tantry [ ramya.tantry ] Mahendra Mungase [ mahendra.mungase ]
            nidhi.kaul Nidhi Kaul (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Stage QA(10202)Level 1 values: Production Deployment on Hold(10224)
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Remaining Estimate 1h [ 3600 ]
            Original Estimate 1h [ 3600 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Remaining Estimate 1h [ 3600 ] 0.5h [ 1800 ]
            Time Spent 0.5h [ 1800 ]
            Worklog Id 102462 [ 102462 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Remaining Estimate 0.5h [ 1800 ] 0h [ 0 ]
            Time Spent 0.5h [ 1800 ] 1h [ 3600 ]
            Worklog Id 102472 [ 102472 ]
            mahendra.mungase Mahendra Mungase (Inactive) made changes -
            Time Spent 1h [ 3600 ] 1.5h [ 5400 ]
            Worklog Id 102482 [ 102482 ]
            Hide
            smita.pawar Smita Pawar (Inactive) added a comment -

            We have verified current status of 1095-B report is displaying correctly on pop up.
            Hence closing tickets.

            Show
            smita.pawar Smita Pawar (Inactive) added a comment - We have verified current status of 1095-B report is displaying correctly on pop up. Hence closing tickets.
            smita.pawar Smita Pawar (Inactive) made changes -
            Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
            smita.pawar Smita Pawar (Inactive) made changes -
            Assignee Mahendra Mungase [ mahendra.mungase ] Smita Pawar [ smita.pawar ]
            smita.pawar Smita Pawar (Inactive) logged work - 05/Mar/18 12:13 PM
            • Time Spent:
              20m
               

              Production Testing

            smita.pawar Smita Pawar (Inactive) made changes -
            Time Spent 1.5h [ 5400 ] 1h 50m [ 6600 ]
            Worklog Id 107070 [ 107070 ]
            smita.pawar Smita Pawar (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            smita.pawar Smita Pawar (Inactive) made changes -
            Resolution Bug Fixed [ 10402 ]
            Status Production Complete [ 10028 ] Closed [ 6 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Assignee Smita Pawar [ smita.pawar ] Sachin Hingole [ sachin.hingole ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Closed [ 6 ] Reopen in Production [ 10027 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Reopen in Production [ 10027 ] In Development [ 10007 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status In Development [ 10007 ] In LB Testing [ 10200 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status In LB Testing [ 10200 ] Reopen in Local [ 10018 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Reopen in Local [ 10018 ] In Development [ 10007 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Resolution Done [ 10000 ]
            Status In Development [ 10007 ] Rejected [ 10004 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status Rejected [ 10004 ] Closed [ 6 ]
            Transition Time In Source Status Execution Times
            Nidhi Kaul (Inactive) made transition -
            Open In Development
            4h 32m 1
            Sachin Hingole (Inactive) made transition -
            In LB Testing Stage Testing
            21h 15m 1
            Smita Pawar (Inactive) made transition -
            Stage Testing In Production Testing
            55d 1h 28m 1
            Smita Pawar (Inactive) made transition -
            In Production Testing Production Complete
            31m 25s 1
            Smita Pawar (Inactive) made transition -
            Production Complete Closed
            4s 1
            Sachin Hingole (Inactive) made transition -
            Closed Reopen in Production
            42d 13h 39m 1
            Sachin Hingole (Inactive) made transition -
            Reopen in Production In Development
            14s 1
            Sachin Hingole (Inactive) made transition -
            In Development In LB Testing
            3d 1h 58m 2
            Sachin Hingole (Inactive) made transition -
            In LB Testing Reopen in Local
            4s 1
            Sachin Hingole (Inactive) made transition -
            Reopen in Local In Development
            6s 1
            Sachin Hingole (Inactive) made transition -
            In Development Rejected
            11s 1
            Sachin Hingole (Inactive) made transition -
            Rejected Closed
            4s 1

              People

              Assignee:
              sachin.hingole Sachin Hingole (Inactive)
              Reporter:
              diana Diana Wong (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 1h Original Estimate - 1h
                  1h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 1h 50m
                  1h 50m