Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-10910

Enroll Now text in Spanish is mismatch in SequenceBar and WORKTERRAResource File

    Details

    • Type: Bug
    • Status: Production Complete
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Bug Severity:
      Medium
    • Module:
      BenAdmin - EDS
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Sprint:
      WT Sprint 37 - Bugs

      Description

      • In SequenceBar Spanish translation of Enroll Now is "EInscríbase ahora"
        And In WORKTERRAResource it is "Inscríbase ahora" both are different and it create issue in following case:
        When EE login with Spanish localization and if Enrollment Mode is Qualifying Event i.e 3 at that time the Spanish Enroll Now text of SequenceBar is compared with Spanish Enroll Now text of WORKTERRAResource and both are different and it remove the enroll now page from workflow.
      • There is hard coded Enroll Now text compared with Enroll Now text of SequenceBar .The Hard coded value must be replaced with WORKTERRAResource value.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Jaideep Vinchurkar (Inactive) made transition -
            Open In Development
            11d 23h 56m 1
            Mahendra Mungase (Inactive) made transition -
            In LB Testing Reopen in Local
            2h 23m 1
            Akash Thakur (Inactive) made transition -
            Reopen in Local In Development
            5h 20m 1
            Mahendra Mungase (Inactive) made transition -
            In Development In LB Testing
            9d 9h 31m 2
            Mahendra Mungase (Inactive) made transition -
            In LB Testing Stage Testing
            5d 5h 31m 1
            Rakesh Roy (Inactive) made transition -
            Stage Testing In Production Testing
            2d 4h 6m 1
            Rakesh Roy (Inactive) made transition -
            In Production Testing Production Complete
            18s 1

              People

              Assignee:
              mahendra.mungase Mahendra Mungase (Inactive)
              Reporter:
              snehal.shabade Snehal Shabade (Inactive)
              Developer:
              Akash Thakur (Inactive)
              QA:
              Hrishikesh Deshpande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 10h Original Estimate - 10h
                  10h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 24h
                  24h