Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-13335

SMMC-Selerix/CHUBB - Map a single Workterra Plan with Multiple Selerix Plans

    XMLWordPrintable

    Details

    • Type: Change Request
    • Status: Production Complete
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Environment:
      Production, Pre Production
    • Module:
      BenAdmin - SSO
    • Reported by:
      Harbinger
    • Company:
      SMMC
    • Item State:
      Stage QA - Stage Deployed
    • Sprint:
      WT - Sprint 44
    • Severity:
      Simple
    • Dev Estimates:
      8
    • QA Estimates:
      6

      Description

      SMMC-Selerix/CHUBB - Map a single Workterra Plan with Three Selerix Plans

      CHUBB has configured three accident plans for SMMC - Accident Gold, Accident Platinum and Accident Diamond.
      But , as per existing Workterra system implementation, we can support maximum two plans like this. We have configured Accident Gold and Accident Platinum, if they want to provide support for Accident Diamond, then we need to remove either Accident Gold or Accident Platinum.
      If we need to provide support for all the three Accident plans , then we need code change for that.

      Cc: Debbie Kulling, Kunal Kedari, Jaideep Vinchurkar, WT-Admin

        Attachments

        1. FW SMMC - Selerix CHUBB Set up.msg
          227 kB
          Santosh Balid
        2. screenshot-1.png
          600 kB
          Santosh Balid
        3. WT-13335_TestScenarios.xlsx
          15 kB
          Kunal Kedari

          Issue Links

            Activity

              People

              Assignee:
              dkulling Debbie Kulling
              Reporter:
              santosh.balid Santosh Balid (Inactive)
              Account Executive:
              Debbie Kulling
              Developer:
              Santosh Balid (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 14h Original Estimate - 14h
                  14h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 16.5h
                  16.5h