Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-13335

SMMC-Selerix/CHUBB - Map a single Workterra Plan with Multiple Selerix Plans

    Details

    • Type: Change Request
    • Status: Production Complete
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Environment:
      Production, Pre Production
    • Module:
      BenAdmin - SSO
    • Reported by:
      Harbinger
    • Company:
      SMMC
    • Item State:
      Stage QA - Stage Deployed
    • Sprint:
      WT - Sprint 44
    • Severity:
      Simple

      Description

      SMMC-Selerix/CHUBB - Map a single Workterra Plan with Three Selerix Plans

      CHUBB has configured three accident plans for SMMC - Accident Gold, Accident Platinum and Accident Diamond.
      But , as per existing Workterra system implementation, we can support maximum two plans like this. We have configured Accident Gold and Accident Platinum, if they want to provide support for Accident Diamond, then we need to remove either Accident Gold or Accident Platinum.
      If we need to provide support for all the three Accident plans , then we need code change for that.

      Cc: Debbie Kulling, Kunal Kedari, Jaideep Vinchurkar, Satya

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Santosh Balid (Inactive) made transition -
            New Request Pending for Approval
            6d 19h 7m 1
            Santosh Balid (Inactive) made transition -
            Pending for Approval Approved for Development
            5s 1
            Santosh Balid (Inactive) made transition -
            Approved for Development In Development
            5s 1
            Santosh Balid (Inactive) made transition -
            In Development In LB Testing
            2d 22h 10m 1
            Santosh Balid (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            5s 1
            Santosh Balid (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            4s 1
            Santosh Balid (Inactive) made transition -
            Approved for Stage Stage Testing
            4s 1
            Santosh Balid (Inactive) made transition -
            Stage Testing Pending for Production Approval
            4s 1
            Santosh Balid (Inactive) made transition -
            Pending for Production Approval Approved for production
            4s 1
            Santosh Balid (Inactive) made transition -
            Approved for production In Production Testing
            4s 1
            Kunal Kedari (Inactive) made transition -
            In Production Testing Production Complete
            5h 13m 1

              People

              Assignee:
              dkulling Debbie Kulling
              Reporter:
              santosh.balid Santosh Balid (Inactive)
              Account Executive:
              Debbie Kulling
              Developer:
              Santosh Balid (Inactive)
              QA:
              Kunal Kedari (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 14h Original Estimate - 14h
                  14h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 16.5h
                  16.5h