Uploaded image for project: 'New Features 2017'
  1. New Features 2017
  2. NF-2821

Show preboard and onboard tours only when New Hire mode is available

    Details

    • Type: Change Request
    • Status: Production Complete
    • Priority: Critical
    • Resolution: Bug Fixed
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: OnBoard
    • Labels:
      None
    • Module:
      OnBoard
    • Reported by:
      CareerBuilder
    • Item State:
      Stage QA - Production Deployment on Hold
    • Feature Category:
      New
    • Severity:
      Complex

      Description

      1. Calculate New hire eligibility
      2. Calculate Tour window based on New hire
      and Tour eligibility and window periods
      3. Handle window period scenario

        Attachments

          Issue Links

            Activity

            komal.barde Komal Barde (Inactive) logged work - 15/Jun/17 10:08 AM
            • Time Spent:
              4h
               

              Went through the Onboard document shared by Swapnil

            ramya.tantry Ramya Tantry (Inactive) logged work - 15/Jun/17 03:15 PM
            • Time Spent:
              2.5h
               

              Analysis
              Went through the Onboard document shared by Swapnil
              Discussion with Swapnil and Komal

            ramya.tantry Ramya Tantry (Inactive) logged work - 16/Jun/17 12:11 PM
            • Time Spent:
              1.5h
               

              Analysis

            komal.barde Komal Barde (Inactive) logged work - 16/Jun/17 12:28 PM
            • Time Spent:
              2.5h
               

              Finding the places where OES_SP_FetchEligibleTourIDs stored procedure is called and the value of @IsNewHireWorkflow while calling

            komal.barde Komal Barde (Inactive) logged work - 19/Jun/17 10:15 AM
            • Time Spent:
              7.5h
               
              • Analysis of the affected place of OES_SP_FetchEligibleTourIDs with parameter IsNewHireWorkflow value as 'No' and 'Yes'
              • Discussion with Ramya and Swapnil
            ramya.tantry Ramya Tantry (Inactive) logged work - 19/Jun/17 12:50 PM
            • Time Spent:
              6h
               

              Analysis.
              New hire SP debugging
              Discussion with Komal and Swapnil.
              Discussion with Nandu on performance wise approach.
              Implementation doc creation and estimate excel creation.

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 20/Jun/17 08:44 AM
            • Time Spent:
              2h
               

              Analysis and WBD preparation

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 20/Jun/17 09:40 AM
            • Time Spent:
              1.5h
               

              Meeting and call discusion

            komal.barde Komal Barde (Inactive) logged work - 20/Jun/17 09:52 AM
            • Time Spent:
              6.5h
               
              • Checking New hire scenarios
              • Discussion with Komal, Satya, Ramya.
              • Modifying OES_SP_GENERIC_EFFECTIVEDATE_CALCULATION SP to set New hire start date and end date
            ramya.tantry Ramya Tantry (Inactive) logged work - 20/Jun/17 04:00 PM
            • Time Spent:
              2h
               

              Discussion with Komal on Approach
              Discussion with Swapnil, Satya and Komal.

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 21/Jun/17 08:06 AM
            • Time Spent:
              2h
               

              Checking New hire scenarios
              Discussion with Komal, Satya, Ramya.

            ramya.tantry Ramya Tantry (Inactive) logged work - 21/Jun/17 11:01 AM
            • Time Spent:
              2h
               

              Discussion with Swapnil,Satya and Komal.Resolve Komal's Queries

            komal.barde Komal Barde (Inactive) logged work - 21/Jun/17 12:54 PM
            • Time Spent:
              6.5h
               

              1) Modified OES_SP_GENERIC_EFFECTIVEDATE_CALCULATION to get New hire start and end date
              2) Discussion with Swapnil, Satya and Ramya about IgnoreRetroactiveEffectiveDate flag

            ramya.tantry Ramya Tantry (Inactive) logged work - 22/Jun/17 10:56 AM
            • Time Spent:
              1h
               

              Discussion with Komal on Scenarios.
              Resolve her queries

            komal.barde Komal Barde (Inactive) logged work - 22/Jun/17 12:56 PM - edited
            • Time Spent:
              4.5h
               

              Changes in OES_SP_FetchEligibleTourIDs - In-progress (Remain set Tour Start date and handle non-eligible tour ids removal query))

            komal.barde Komal Barde (Inactive) logged work - 23/Jun/17 08:40 AM
            • Time Spent:
              6.5h
               

              Changes in OES_SP_FetchEligibleTourIDs - In-progress (Handle non-eligible tour ids removal query)

            ramya.tantry Ramya Tantry (Inactive) logged work - 23/Jun/17 12:51 PM
            • Time Spent:
              0.5h
               

              Discussion with Komal

            komal.barde Komal Barde (Inactive) logged work - 27/Jun/17 08:43 AM
            • Time Spent:
              7.5h
               
              • Add onboard module condition in SP
              • Unit testing
              • Add flag of fetch non-eligible tour ids.
            ramya.tantry Ramya Tantry (Inactive) logged work - 27/Jun/17 04:02 PM
            • Time Spent:
              0.5h
               

              Discussion with Komal

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 28/Jun/17 11:20 AM
            • Time Spent:
              0.5h
               

              Discussion

            komal.barde Komal Barde (Inactive) logged work - 28/Jun/17 12:46 PM
            • Time Spent:
              0.5h
               

              Discussion with QA team and Dev team on Bullhorn and Manage Onboard Status page Impact

            komal.barde Komal Barde (Inactive) logged work - 28/Jun/17 12:49 PM
            • Time Spent:
              7h
               
              • Add Onboard condition
              • Unit test Remove non-eligible calls
            ramya.tantry Ramya Tantry (Inactive) logged work - 28/Jun/17 03:45 PM
            • Time Spent:
              1h
               

              Discussion with Komal.
              Meeting with Onboard Team

            rajendraj Rajendra Joshi (Inactive) logged work - 29/Jun/17 11:24 AM
            • Time Spent:
              4h
               

              Analysis and Test cases writing

            ramya.tantry Ramya Tantry (Inactive) logged work - 29/Jun/17 12:42 PM
            • Time Spent:
              0.5h
               

              Discussion with Komal.

            komal.barde Komal Barde (Inactive) logged work - 29/Jun/17 12:46 PM
            • Time Spent:
              6.5h
               
              • Discussion with Swapnil about testing scenario
              • Handle condition on Tour widget
              • Handle condition of Preboard tour in OES_SP_FetchEligibleTourIDs SP
            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 29/Jun/17 04:28 PM
            • Time Spent:
              0.8h
               

              Discussion with Komal for Preboard scenario

            komal.barde Komal Barde (Inactive) logged work - 30/Jun/17 10:26 AM - edited
            • Time Spent:
              8h
               
              • Tour Status widget change
              • Unit testing
              • Discussion with Swapnil
              • Manage Onboard Status page change
            komal.barde Komal Barde (Inactive) logged work - 03/Jul/17 10:24 AM - edited
            • Time Spent:
              7.5h
               

              1. Bullhorn page Unit testing
              2. Tour widget -Sent scenario to QA team
              3. IsVerificationRequired flag check
              4. Discussion with Swapnil

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 03/Jul/17 04:19 PM
            • Time Spent:
              1h
               

              Discussion with Komal, Mahendra, Nidhi

            komal.barde Komal Barde (Inactive) logged work - 04/Jul/17 11:36 AM
            • Time Spent:
              8h
               

              1. Tour widget - With mode display of tour widget
              2. IsVerificationRequired flag check

            komal.barde Komal Barde (Inactive) logged work - 05/Jul/17 10:27 AM
            • Time Spent:
              6.5h
               

              1. Tour widget - With mode display of tour widget
              2. IsVerificationRequired flag check

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 05/Jul/17 01:44 PM
            • Time Spent:
              0.5h
               

              Internal discussion

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 05/Jul/17 03:03 PM
            • Time Spent:
              1h
               

              Meeting for Tour widget Komal & QA
              Discussion with Komal

            rajendraj Rajendra Joshi (Inactive) logged work - 06/Jul/17 06:16 AM
            • Time Spent:
              0.5h
               

              Discussion with komal, mahendra and swapnil on tour widget change.

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 06/Jul/17 01:51 PM
            • Time Spent:
              0.5h
               

              Internal discussion

            komal.barde Komal Barde (Inactive) logged work - 06/Jul/17 05:51 PM - edited
            • Time Spent:
              1h
               
              • Discussion with Rajendraj, Mahendra and Swapnil on tour widget change.
              • Prepared document for the same.
            komal.barde Komal Barde (Inactive) logged work - 06/Jul/17 05:52 PM
            • Time Spent:
              6.5h
               

              Development and unit testing of "Tour widget - With and without mode display" change

            rajendraj Rajendra Joshi (Inactive) logged work - 07/Jul/17 04:18 AM
            • Time Spent:
              0.5h
               

              onboard status team meeting. discussion with nidhi, swapnil, dev team, mahendra etc

            rajendraj Rajendra Joshi (Inactive) logged work - 07/Jul/17 04:19 AM
            • Time Spent:
              5h
               

              test case writing on tour widget

            rajendraj Rajendra Joshi (Inactive) logged work - 07/Jul/17 04:21 AM
            • Time Spent:
              2h
               

              Test scenario writing on new hire-employee tour

            komal.barde Komal Barde (Inactive) logged work - 07/Jul/17 08:12 AM - edited
            • Time Spent:
              3.5h
               

              Development and unit testing of "Tour widget - With and without mode display" change

            komal.barde Komal Barde (Inactive) logged work - 07/Jul/17 08:14 AM
            • Time Spent:
              4h
               

              Review of this JIRA by Swapnil and apply changes as per suggestion given in review.

            komal.barde Komal Barde (Inactive) logged work - 10/Jul/17 08:17 AM
            • Time Spent:
              1h
               

              Deploy changes on LB branch

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 10/Jul/17 04:09 PM
            • Time Spent:
              0.75h
               

              Code review for related issues and Discussion

            rajendraj Rajendra Joshi (Inactive) logged work - 11/Jul/17 05:01 AM - edited
            • Time Spent:
              5h
               

              Testing on LB using production company For QA LONG For HSPL

            rajendraj Rajendra Joshi (Inactive) logged work - 11/Jul/17 05:06 AM - edited
            • Time Spent:
              2h
               

              Test case analysis and Scenario writing

            swapnil.pandhare Swapnil Pandhare (Inactive) logged work - 11/Jul/17 04:42 PM
            • Time Spent:
              1h
               

              Discussion & Checking LB build issue

            rajendraj Rajendra Joshi (Inactive) logged work - 12/Jul/17 05:13 AM
            • Time Spent:
              6.5h
               

              Testing on LB using production company For QA LONG For HSPL

            rajendraj Rajendra Joshi (Inactive) logged work - 12/Jul/17 12:16 PM
            • Time Spent:
              8h
               

              Verified New hire Mode changes on LB as per test cases created.

            rajendraj Rajendra Joshi (Inactive) logged work - 13/Jul/17 12:17 PM
            • Time Spent:
              8h
               

              Verified New hire Mode changes on LB as per test cases created.

            rajendraj Rajendra Joshi (Inactive) logged work - 14/Jul/17 12:18 PM - edited
            • Time Spent:
              8h
               

              Verified New hire Mode changes on LB as per test cases created. Plus, verified MATT from production as per client setting on LB.

            rajendraj Rajendra Joshi (Inactive) logged work - 17/Jul/17 11:21 AM
            • Time Spent:
              3h
               

              Verification LB using company For QA LONG For HSPL

            rajendraj Rajendra Joshi (Inactive) logged work - 18/Jul/17 08:03 AM - edited
            • Time Spent:
              1h
               

              Verification on LB

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 18/Jul/17 01:29 PM
            • Time Spent:
              8h
               

              New hire mode testing on Azure

            rajendraj Rajendra Joshi (Inactive) logged work - 19/Jul/17 12:35 PM
            • Time Spent:
              3.5h
               

              Started testing above test cases on stage using company Long for HSPL

            mahendra.mungase Mahendra Mungase (Inactive) logged work - 19/Jul/17 01:31 PM
            • Time Spent:
              4h
               

              New hire mode testing on Azure

            rajendraj Rajendra Joshi (Inactive) logged work - 20/Jul/17 12:39 PM
            • Time Spent:
              8h
               

              In stage testing. Executed attached test cases.

            rajendraj Rajendra Joshi (Inactive) logged work - 24/Jul/17 12:07 PM
            • Time Spent:
              2.5h
               

              Verified on Stage using restored company Long for HSPL

            rajendraj Rajendra Joshi (Inactive) logged work - 03/Aug/17 12:42 PM
            • Time Spent:
              2.75h
               

              discussion, verification and reply

            rajendraj Rajendra Joshi (Inactive) logged work - 14/Aug/17 10:34 AM
            • Time Spent:
              2.5h
               

              Verified cross-board and off-board tours on stage.

              People

              Assignee:
              sachin.hingole Sachin Hingole (Inactive)
              Reporter:
              swapnil.pandhare Swapnil Pandhare (Inactive)
              Developer:
              Komal Barde (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 144h Original Estimate - 144h
                  144h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 219.3h
                  219.3h