-
Type:
Enhancement
-
Status: Closed
-
Priority:
Medium
-
Resolution: Done
-
Component/s: BenAdmin
-
Labels:
-
Module:Platform
-
Reported by:Client
-
Item State:Stage QA - Production Deployment on Hold
-
Severity:Simple
Rates Recalculation - Ability to Calculate Multiple Rates
Checked list box for Rate.
Multiple rate recalculation.
- is blocked by
-
WT-10518 LB | SA Utility | Fields are not appearing as expected
-
- Closed
-
- relates to
-
ST-287 LB | SA Utility | Recalculate Rates | Plan Design | Default should be displayed as Select your plan
-
- Closed
-
-
ST-288 LB | SA Utility | Rate Recal | Incorrect Plan Name is displayed
-
- Closed
-
-
ST-289 LB | SA Utility | Extend and Rate Recal | Multiple Rate selection but Plan Selection is not multiple so only one Plan specific rate is getting recalculated
-
- Closed
-
-
ST-290 LB | SA Utility | Multiple Rate Recal | After Rate recal Popup appears | All three buttons perform same action
-
- Resolution Setting
-
-
WT-11145 Recalc Error -Cambrian School District
-
- Closed
-
-
NF-5313 SA Utility Betterment - Ability to Calculate Multiple Rates
-
- Production Complete
-
Environment: Production
Login: Partner
Company: BioRad for hspl
Browser: Chrome
Steps:
Employee > Check Plans and their respective plans cost
2. Change in Rates
3. SA Utility Recal for multiple plans
4. Check employees change in cost is changed as per rates
So, closing jira on Production.
Sachin Hingole Hrishikesh Deshpande