Uploaded image for project: 'WT Regression'
  1. WT Regression
  2. WR-58

WT -> LIFE Regression -> In case of contingency, contingent plan gets terminated with wrong termination date - employee gets the plan for ONE DAY

    Details

    • Type: Bug
    • Status: Closed
    • Priority: High
    • Resolution: Done
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Harbinger
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Can Wait

      Description

      Stage
      Davis-Moore Automotive, Inc. For HSPL
      Parent plan - Emp Supp Life
      Contingent plan - Spouse Supp Life [forced contingency]

      • both plan does not having plan level termination date rule specified
      • company level termination rule is - end of the month
      • employee enrolled in emp supp life - automatically his spouse gets enrolled in spouse life plan too
      • now partner changed the employee's class and made him ineligible for emp supp life plan

      Actual Result : spouse supp life plan should have been terminated with the same termination date as that f the mp supp life plan - but the plan got terminated on the plan effective date it self

        Attachments

          Activity

          alankar.chavan Alankar Chavan (Inactive) created issue -
          alankar.chavan Alankar Chavan (Inactive) made changes -
          Field Original Value New Value
          Attachment Alan 1.png [ 21235 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Issue Importance Must Have [ 11800 ]
          satyap Satya made changes -
          Assignee Satya [ ID10004 ] Amruta Lohiya [ amruta.baheti ]
          amruta.lohiya Amruta Lohiya made changes -
          Assignee Amruta Lohiya [ amruta.baheti ] Umesh Kadam [ umesh.kadam ]
          umesh.kadam Umesh Kadam (Inactive) made changes -
          Assignee Umesh Kadam [ umesh.kadam ] Abhijeet Khandagale [ abhijeet.khandagale ]
          satyap Satya made changes -
          Assignee Abhijeet Khandagale [ abhijeet.khandagale ] Amruta Lohiya [ amruta.baheti ]
          amruta.lohiya Amruta Lohiya made changes -
          Assignee Amruta Lohiya [ amruta.baheti ] Avnish Yadav [ avnish.yadav ]
          Hide
          avnish.yadav Avnish Yadav (Inactive) added a comment -

          Alankar Chavan

          Generally Spouse life plan is not force on Employee Life. If you know any company then please let us know. Else we change this issue's status as can wait.

          Show
          avnish.yadav Avnish Yadav (Inactive) added a comment - Alankar Chavan Generally Spouse life plan is not force on Employee Life. If you know any company then please let us know. Else we change this issue's status as can wait.
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Assignee Avnish Yadav [ avnish.yadav ] Alankar Chavan [ alankar.chavan ]
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Dev Due Date 10/Aug/2016
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Assignee Alankar Chavan [ alankar.chavan ] Avnish Yadav [ avnish.yadav ]
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Status Open [ 1 ] In Development [ 10007 ]
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Dev Due Date 10/Aug/2016 19/Aug/2016
          amruta.lohiya Amruta Lohiya made changes -
          Assignee Avnish Yadav [ avnish.yadav ] Girija Potdar [ girija.potdar ]
          amruta.lohiya Amruta Lohiya made changes -
          Assignee Girija Potdar [ girija.potdar ] Avnish Yadav [ avnish.yadav ]
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Dev Due Date 19/Aug/2016 01/Sep/2016
          vijays Vijay Siddha (Inactive) made changes -
          Assignee Avnish Yadav [ avnish.yadav ] Alankar Chavan [ alankar.chavan ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Issue Importance Must Have [ 11800 ] Can Wait [ 11801 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Assignee Alankar Chavan [ alankar.chavan ] Avnish Yadav [ avnish.yadav ]
          avnish.yadav Avnish Yadav (Inactive) made changes -
          Assignee Avnish Yadav [ avnish.yadav ] Girija Potdar [ girija.potdar ]
          girija.potdar Girija Potdar (Inactive) made changes -
          Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208)
          ashwin.wankhede Ashwin Wankhede (Inactive) made changes -
          Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
          girija.potdar Girija Potdar (Inactive) made changes -
          Status In Development [ 10007 ] Local Testing [ 10200 ]
          girija.potdar Girija Potdar (Inactive) made changes -
          Assignee Girija Potdar [ girija.potdar ] Alankar Chavan [ alankar.chavan ]
          Hide
          alankar.chavan Alankar Chavan (Inactive) added a comment -

          Hello Girija Potdar,

          Can you please mention the associated 3Cs with the ticket ? So as I can decide the scope for testing.

          CC - Deepali Tidke Rakesh Roy

          Show
          alankar.chavan Alankar Chavan (Inactive) added a comment - Hello Girija Potdar , Can you please mention the associated 3Cs with the ticket ? So as I can decide the scope for testing. CC - Deepali Tidke Rakesh Roy
          Hide
          girija.potdar Girija Potdar (Inactive) added a comment -

          Hi Alankar,

          You can test the following test cases :

          Dental is force on Medical.
          1) Termination Rule Medical : End of the Month
          Termination Rule Dental: End of the Month
          Result: Termination Date for both plans End of the Month

          2) Termination Rule Medical : End of the Month
          Termination Rule Dental: Date Of Termination
          Result: Termination date for Medical End of the Month
          Termination date for Dental Date Of Termination

          3) Termination Rule Medical : Date Of Termination
          Termination Rule Dental: End of the Month
          Result: Termination Date for both plans Date Of Termination

          4) Termination Rule Medical : Date Of Termination
          Termination Rule Dental: Date Of Termination
          Result: Termination Date for both plans Date Of Termination

          Verify for future current and combination of elections.
          CC: Amruta Lohiya

          Thanks.

          Show
          girija.potdar Girija Potdar (Inactive) added a comment - Hi Alankar, You can test the following test cases : Dental is force on Medical. 1) Termination Rule Medical : End of the Month Termination Rule Dental: End of the Month Result : Termination Date for both plans End of the Month 2) Termination Rule Medical : End of the Month Termination Rule Dental: Date Of Termination Result : Termination date for Medical End of the Month Termination date for Dental Date Of Termination 3) Termination Rule Medical : Date Of Termination Termination Rule Dental: End of the Month Result : Termination Date for both plans Date Of Termination 4) Termination Rule Medical : Date Of Termination Termination Rule Dental: Date Of Termination Result : Termination Date for both plans Date Of Termination Verify for future current and combination of elections. CC: Amruta Lohiya Thanks.
          girija.potdar Girija Potdar (Inactive) made changes -
          Code Reviewed By Amruta Lohiya [ 11906 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Assignee Alankar Chavan [ alankar.chavan ] Priya Dhamande [ priya.dhamande ]
          hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
          Remaining Estimate 7h [ 25200 ]
          Original Estimate 7h [ 25200 ]
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
          Hide
          priya.dhamande Priya Dhamande (Inactive) added a comment -

          Environment: LB
          Company: Five Guys
          Plan: Medical and Dental

          Testing in progress., verified the issue with below scenarios:
          1. Company Level Termination Date: End Of Month
          Plan Termination Date [ For both Dental and Medical Plan]: No
          Result: Plan Terminated Date at end of month

          2. Company Level Termination Date: End Of Month
          Medical Plan Termination Date: End of month
          Dental Plan Termination Date: No Rule
          Result: Plan terminated at end of month

          3. Company Level Termination Date: End Of Month
          Medical Plan Termination Date: No Rule
          Dental Plan Termination Date: End of month
          Result: Plan Terminated Date at end of month

          4. Company Level Termination Date: End Of Month
          Medical Plan Termination Date: Date of Termination
          Dental Plan Termination Date: End of month
          Result: Plan Terminated on Date of Termination

          5. Company Level Termination Date: End Of Month
          Medical Plan Termination Date: No
          Dental Plan Termination Date: Date of Termination
          Result: Plan Terminated on End of month

          Will be completing remaining scenarios tomorrow.

          Show
          priya.dhamande Priya Dhamande (Inactive) added a comment - Environment: LB Company: Five Guys Plan: Medical and Dental Testing in progress., verified the issue with below scenarios: 1. Company Level Termination Date: End Of Month Plan Termination Date [ For both Dental and Medical Plan]: No Result: Plan Terminated Date at end of month 2. Company Level Termination Date: End Of Month Medical Plan Termination Date: End of month Dental Plan Termination Date: No Rule Result: Plan terminated at end of month 3. Company Level Termination Date: End Of Month Medical Plan Termination Date: No Rule Dental Plan Termination Date: End of month Result: Plan Terminated Date at end of month 4. Company Level Termination Date: End Of Month Medical Plan Termination Date: Date of Termination Dental Plan Termination Date: End of month Result: Plan Terminated on Date of Termination 5. Company Level Termination Date: End Of Month Medical Plan Termination Date: No Dental Plan Termination Date: Date of Termination Result: Plan Terminated on End of month Will be completing remaining scenarios tomorrow.
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Original Estimate 7h [ 25200 ] 19h [ 68400 ]
          priya.dhamande Priya Dhamande (Inactive) logged work - 04/Dec/16 10:32 AM
          • Time Spent:
            3.5h
             
            <No comment>
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Remaining Estimate 7h [ 25200 ] 3.5h [ 12600 ]
          Time Spent 3.5h [ 12600 ]
          Worklog Id 11399 [ 11399 ]
          priya.dhamande Priya Dhamande (Inactive) logged work - 05/Dec/16 01:20 PM - edited
          • Time Spent:
            2h
             
            <No comment>
          Hide
          priya.dhamande Priya Dhamande (Inactive) added a comment -

          Environment: LB
          Company: Five Guys
          Plan: Voluntary Employee Life and Voluntary Spouse Life

          Scenarios covered:
          1. Company Level Termination Date: End Of Month
          Plan Termination Date [ For both Plans]: No
          Result: Plan Terminated Date at end of month

          2. Company Level Termination Date: End Of Month
          Plan Termination Date for Voluntary Employee Life: End of following month
          Plan Termination Date for Voluntary Spouse Life: End of following month
          Result: Plan Terminated Date at End of following month

          3. Company Level Termination Date: End Of Month
          Plan Termination Date for Voluntary Employee Life: End of following month
          Plan Termination Date for Voluntary Spouse Life: Date of Termination
          Result: Plan Terminated Date at End of following month

          4. Company Level Termination Date: End Of Month
          Plan Termination Date for Voluntary Employee Life: Date of Termination
          Plan Termination Date for Voluntary Spouse Life: End of following month
          Result: Plan Terminated Date: Date of Termination

          As all the scenarios were passed moving jira on Stage.

          Show
          priya.dhamande Priya Dhamande (Inactive) added a comment - Environment: LB Company: Five Guys Plan: Voluntary Employee Life and Voluntary Spouse Life Scenarios covered: 1. Company Level Termination Date: End Of Month Plan Termination Date [ For both Plans]: No Result: Plan Terminated Date at end of month 2. Company Level Termination Date: End Of Month Plan Termination Date for Voluntary Employee Life: End of following month Plan Termination Date for Voluntary Spouse Life: End of following month Result: Plan Terminated Date at End of following month 3. Company Level Termination Date: End Of Month Plan Termination Date for Voluntary Employee Life: End of following month Plan Termination Date for Voluntary Spouse Life: Date of Termination Result: Plan Terminated Date at End of following month 4. Company Level Termination Date: End Of Month Plan Termination Date for Voluntary Employee Life: Date of Termination Plan Termination Date for Voluntary Spouse Life: End of following month Result: Plan Terminated Date: Date of Termination As all the scenarios were passed moving jira on Stage.
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
          priya.dhamande Priya Dhamande (Inactive) logged work - 07/Dec/16 01:30 AM
          • Time Spent:
            2h
             
            <No comment>
          rakeshr Rakesh Roy (Inactive) made changes -
          Developer Girija Potdar [ girija.potdar ]
          khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
          Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
          rakeshr Rakesh Roy (Inactive) made changes -
          Status Local Testing [ 10200 ] Stage Testing [ 10201 ]
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
          Hide
          priya.dhamande Priya Dhamande (Inactive) added a comment -

          Environment: Stage
          Company: Five Guys 2016 for hspl
          Plan: Medical and Dental

          Testing in Progress

          Scenarios covered Today:
          1. Company Level Termination Date: End Of Month
          Plan Termination Date [ For both Plans]: No
          Result: Plan Terminated Date at end of month
          2. Company Level Termination Date: End Of Month
          Plan Termination Date for Voluntary Employee Life: End of following month
          Plan Termination Date for Voluntary Spouse Life: End of following month
          Result: Plan Terminated Date at End of following month

          Show
          priya.dhamande Priya Dhamande (Inactive) added a comment - Environment: Stage Company: Five Guys 2016 for hspl Plan: Medical and Dental Testing in Progress Scenarios covered Today: 1. Company Level Termination Date: End Of Month Plan Termination Date [ For both Plans]: No Result: Plan Terminated Date at end of month 2. Company Level Termination Date: End Of Month Plan Termination Date for Voluntary Employee Life: End of following month Plan Termination Date for Voluntary Spouse Life: End of following month Result: Plan Terminated Date at End of following month
          priya.dhamande Priya Dhamande (Inactive) logged work - 12/Dec/16 02:03 PM
          • Time Spent:
            2.5h
             
            <No comment>
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Remaining Estimate 3.5h [ 12600 ] 1.5h [ 5400 ]
          Time Spent 3.5h [ 12600 ] 5.5h [ 19800 ]
          Worklog Id 13653 [ 13653 ]
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Worklog Id 13653 [ 13653 ]
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Remaining Estimate 1.5h [ 5400 ] 0h [ 0 ]
          Time Spent 5.5h [ 19800 ] 7.5h [ 27000 ]
          Worklog Id 13664 [ 13664 ]
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Time Spent 7.5h [ 27000 ] 10h [ 36000 ]
          Worklog Id 13717 [ 13717 ]
          priya.dhamande Priya Dhamande (Inactive) logged work - 22/Dec/16 04:19 AM
          • Time Spent:
            2.5h
             
            <No comment>
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Time Spent 10h [ 36000 ] 12.5h [ 45000 ]
          Worklog Id 14865 [ 14865 ]
          priya.dhamande Priya Dhamande (Inactive) logged work - 27/Dec/16 09:17 AM
          • Time Spent:
            1.5h
             
            <No comment>
          priya.dhamande Priya Dhamande (Inactive) made changes -
          Time Spent 12.5h [ 45000 ] 14h [ 50400 ]
          Worklog Id 15886 [ 15886 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
          ashwin.wankhede Ashwin Wankhede (Inactive) made changes -
          Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
          girija.potdar Girija Potdar (Inactive) logged work - 05/Jan/17 01:15 PM
          • Time Spent:
            0.5h
             

            Production deployment

          girija.potdar Girija Potdar (Inactive) made changes -
          Time Spent 14h [ 50400 ] 14.5h [ 52200 ]
          Worklog Id 17540 [ 17540 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Status Stage Testing [ 10201 ] Production Testing [ 10202 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Resolution Fixed [ 1 ]
          Status Production Testing [ 10202 ] Production Complete [ 10028 ]
          rakeshr Rakesh Roy (Inactive) made changes -
          Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
          hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
          Status Production Complete [ 10028 ] Closed [ 6 ]
          Transition Time In Source Status Execution Times
          Avnish Yadav (Inactive) made transition -
          Open In Development
          35d 4h 9m 1
          Girija Potdar (Inactive) made transition -
          In Development In LB Testing
          64d 3h 31m 1
          Rakesh Roy (Inactive) made transition -
          In LB Testing Stage Testing
          59d 18h 32m 1
          Rakesh Roy (Inactive) made transition -
          Stage Testing In Production Testing
          27d 22h 45m 1
          Rakesh Roy (Inactive) made transition -
          In Production Testing Production Complete
          8s 1
          Hrishikesh Deshpande (Inactive) made transition -
          Production Complete Closed
          366d 3h 1m 1

            People

            Assignee:
            priya.dhamande Priya Dhamande (Inactive)
            Reporter:
            alankar.chavan Alankar Chavan (Inactive)
            Developer:
            Girija Potdar (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:
              Dev Due Date:

                Time Tracking

                Estimated:
                Original Estimate - 19h
                19h
                Remaining:
                Remaining Estimate - 0h
                0h
                Logged:
                Time Spent - 14.5h Time Not Required
                14.5h