Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-13036

BioRad - e-Trade plan not showing up in Enroll Now when eligible

    Details

    • Type: Bug
    • Status: Production Complete
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Environment:
      Production
    • Bug Type:
      UI
    • Bug Severity:
      Medium
    • Level:
      Partner
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Implementation
    • Company:
      Bio-Rad
    • Stage Company Name:
      BioRad
    • Item State:
      Production Complete - Closed
    • Browser:
      IE 11, Google Chrome
    • Sprint:
      WT- Sprint 42

      Description

      When enrolling in the e-Trade plan, in production for BioRad, I have noticed that the type shows in the enroll now drop down however when selecting the type to enroll no plan shows. I checked the plan to see if maybe the plan needed to be resaved and I found that the increments are missing on production. I checked the cost and coverage tab for both the e-Trade plans against stage and production which then I noticed that on stage the increments show however on production they do not. I believe this could be why the plan is not showing in my enroll now section to enroll in. I am unable to get the increments to show. Please advise when this is updated on production. See screen shots attached.

        Attachments

          Issue Links

            Activity

            Transition Time In Source Status Execution Times
            Umesh Kadam (Inactive) made transition -
            Open In Development
            43s 1
            Umesh Kadam (Inactive) made transition -
            In Development Rejected
            18s 1
            Umesh Kadam (Inactive) made transition -
            Rejected Reopen
            23m 11s 1
            Umesh Kadam (Inactive) made transition -
            Reopen In Development
            3s 1
            Umesh Kadam (Inactive) made transition -
            In Development In LB Testing
            3s 1
            Umesh Kadam (Inactive) made transition -
            In LB Testing Stage Testing
            4s 1
            Rashmita Dudhe (Inactive) made transition -
            Stage Testing In Production Testing
            14d 21h 19m 1
            Rashmita Dudhe (Inactive) made transition -
            In Production Testing Production Complete
            3h 46m 1

              People

              Assignee:
              amjohnson Amannda Johnson
              Reporter:
              umesh.kadam Umesh Kadam (Inactive)
              Account Executive:
              Amannda Johnson
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 8h
                  8h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 5.75h Time Not Required
                  5.75h