WT -> Election Termination Screens -> Show the calculated effective dates before user terminates any election

    Details

    • Type: Enhancement
    • Status: Production Complete
    • Priority: High
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Support
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Must have Additional
    • Sprint:
      WT Sprint 23

      Description

      This might be apply for screens like Terminate Election, terminate as never effective, terminate dependent's benefit

      Here we want to notify an user - with which actual dates the elections are going to get terminated after he puts the termination dates.

      Example - the termination rule is set as End of Month

      User terminates an election with date 15th May 2016 - before the actual termination system should notify an user these changes are going to be effective from 31st May 2016
      After this user can click on cancel or go further with the termination

      This is as per the Dave's suggestion

        Attachments

          Issue Links

            Activity

            Hide
            amnesh.goel Amnesh Goel (Inactive) added a comment -

            Hi Satya,

            Please check this ticket.

            Thanks,
            Amnesh Goel

            Show
            amnesh.goel Amnesh Goel (Inactive) added a comment - Hi Satya, Please check this ticket. Thanks, Amnesh Goel
            Hide
            harshawardhan Harshawardhan Phalake (Inactive) added a comment -

            Hi Alankar Chavan,
            As per discussion in design team meeting we have done the code changes for the Election termination screen.
            We have added new column in greed Actual Termination Date and on termination date change event we have show the Actual term date for the election as per the plan and company level policy.

            Impacted areas to be tested.
            1. Terminate plan election
            2. Terminate Dependent Benefit
            3. Terminate as never effective

            All three screen need to be tested properly as validation for Terminate plan election is not present on Terminate Dependent Benefit we also done those changes as well.

            Known issue:
            On production for for screen Terminate Dependent Benefit multiple election date termination is not working we are creating separate JIRA for the same.

            Please revert if you need any help to understand the scenario.

            Thanks,
            Harshawardhan.

            CC: Jyoti Mayne

            Show
            harshawardhan Harshawardhan Phalake (Inactive) added a comment - Hi Alankar Chavan , As per discussion in design team meeting we have done the code changes for the Election termination screen. We have added new column in greed Actual Termination Date and on termination date change event we have show the Actual term date for the election as per the plan and company level policy. Impacted areas to be tested. 1. Terminate plan election 2. Terminate Dependent Benefit 3. Terminate as never effective All three screen need to be tested properly as validation for Terminate plan election is not present on Terminate Dependent Benefit we also done those changes as well. Known issue: On production for for screen Terminate Dependent Benefit multiple election date termination is not working we are creating separate JIRA for the same. Please revert if you need any help to understand the scenario. Thanks, Harshawardhan. CC: Jyoti Mayne
            Hide
            harshawardhan Harshawardhan Phalake (Inactive) added a comment -

            Known issue on production.

            Show
            harshawardhan Harshawardhan Phalake (Inactive) added a comment - Known issue on production.
            Hide
            alankar.chavan Alankar Chavan (Inactive) added a comment -

            Attaching the Test Cases related to this enhancement - 03rd Jan 2016

            CC - Rakesh Roy Prasad Pise Hrishikesh Deshpande Sachin Hingole Jayshree Nagpure

            Show
            alankar.chavan Alankar Chavan (Inactive) added a comment - Attaching the Test Cases related to this enhancement - 03rd Jan 2016 CC - Rakesh Roy Prasad Pise Hrishikesh Deshpande Sachin Hingole Jayshree Nagpure
            Hide
            prasadp Prasad Pise (Inactive) added a comment -

            Hi Jayshree Nagpure

            As discussed, please start execution of the task and revert in case of any queries.

            Thanks

            • Prasad
            Show
            prasadp Prasad Pise (Inactive) added a comment - Hi Jayshree Nagpure As discussed, please start execution of the task and revert in case of any queries. Thanks Prasad
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi,

            Verification on LB is completed.
            Working as Expected.
            Thus updating item state as ready for stage.

            Thanks,
            Jayshree

            CC; Alankar Chavan Prasad Pise Harshawardhan Phalake Rakesh Roy

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi, Verification on LB is completed. Working as Expected. Thus updating item state as ready for stage. Thanks, Jayshree CC; Alankar Chavan Prasad Pise Harshawardhan Phalake Rakesh Roy
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi,

            Verification on Stage is done.
            While verifying i have encountered an issue on stage in "Terminate Dependent benefits".
            After Selecting termination date, In Actual termination date column its showing "<!DOCTYPE" instead of actual termination date.

            Please refer attached screen shot:

            Thanks,
            Jayshree

            CC; Alankar Chavan Prasad Pise Harshawardhan Phalake Rakesh Roy

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi, Verification on Stage is done. While verifying i have encountered an issue on stage in "Terminate Dependent benefits". After Selecting termination date, In Actual termination date column its showing "<!DOCTYPE" instead of actual termination date. Please refer attached screen shot: Thanks, Jayshree CC; Alankar Chavan Prasad Pise Harshawardhan Phalake Rakesh Roy
            Hide
            harshawardhan Harshawardhan Phalake (Inactive) added a comment -

            Hi Jayshree Nagpure,

            Above issue is caused due to page lave access.

            Please find the bellow 3c's for the issue:

            *Concern : * Actual termination date column its showing "<!DOCTYPE" instead of actual termination date.

            Cause : As on stage page level access in on because of that need to make entry in Page level access table for the new action.

            Correction : We have write a script for the page level access for this particular action.

            Thanks,
            Harshawardahn.

            CC: Jyoti Mayne,Aniruddha Dev

            Show
            harshawardhan Harshawardhan Phalake (Inactive) added a comment - Hi Jayshree Nagpure , Above issue is caused due to page lave access. Please find the bellow 3c's for the issue: *Concern : * Actual termination date column its showing "<!DOCTYPE" instead of actual termination date. Cause : As on stage page level access in on because of that need to make entry in Page level access table for the new action. Correction : We have write a script for the page level access for this particular action. Thanks, Harshawardahn. CC: Jyoti Mayne , Aniruddha Dev
            Hide
            jyoti.mayne Jyoti Mayne added a comment -

            Hi Alankar Chavan,

            Please test all related issues link to this enhancement.

            Cc: Prasad Pise,Satya

            Show
            jyoti.mayne Jyoti Mayne added a comment - Hi Alankar Chavan , Please test all related issues link to this enhancement. Cc: Prasad Pise , Satya
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi Umesh Kadam,

            Verified this enhancement on Caiso on LB.
            Plan name: Anthem HDHP
            While terminating plan, Termination date is to be set and In Actual termination date its showing date as per rule set in company information, But terminating plan according to plan design.
            But it should display date of termination on screen as per plan design only when plan is terminating as per plan design rule.
            Hence as discussed with Alankar Chavan Re-opening this enhancement.
            Please refer Attached ScreenShots:

            Thanks,
            Jayshree

            CC: Alankar Chavan Prasad Pise Rakesh Roy

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi Umesh Kadam , Verified this enhancement on Caiso on LB. Plan name: Anthem HDHP While terminating plan, Termination date is to be set and In Actual termination date its showing date as per rule set in company information, But terminating plan according to plan design. But it should display date of termination on screen as per plan design only when plan is terminating as per plan design rule. Hence as discussed with Alankar Chavan Re-opening this enhancement. Please refer Attached ScreenShots: Thanks, Jayshree CC: Alankar Chavan Prasad Pise Rakesh Roy
            Hide
            umesh.kadam Umesh Kadam (Inactive) added a comment -

            Hi Jayshree Nagpure,

            Please find 3Cs below

            Concern While terminating plan, termination date is to be set in 'Actual Termination Date' column is showing as per company level rule but terminating election according to plan level termination date rule
            Cause While getting termination date for 'Actual Termination Date' column, EnrollmentID were passed instead of PlanDesignID
            Correction Required code change has been done and committed to LB branch. Please test once it is deployed to LB

            Thanks and Regards,
            :: Umesh Kadam

            CC : Jyoti Mayne

            Show
            umesh.kadam Umesh Kadam (Inactive) added a comment - Hi Jayshree Nagpure , Please find 3Cs below Concern While terminating plan, termination date is to be set in 'Actual Termination Date' column is showing as per company level rule but terminating election according to plan level termination date rule Cause While getting termination date for 'Actual Termination Date' column, EnrollmentID were passed instead of PlanDesignID Correction Required code change has been done and committed to LB branch. Please test once it is deployed to LB Thanks and Regards, :: Umesh Kadam CC : Jyoti Mayne
            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - CC; Prasad Pise Alankar Chavan Rakesh Roy
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi,

            Verified this enhancement on LB on JCCC,Caiso
            Verified for Three scenarios:
            1. Terminate plan election
            2. Terminate Dependent Benefit
            3. Terminate as never effective
            For Plan level and company level
            System actually terminate the election with the termination date shown in Actual Termination Date column.
            Working as expected.
            Thus Updating item state as ready for Stage.

            Thanks,
            Jayshree

            CC: Umesh Kadam Jyoti Mayne

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi, Verified this enhancement on LB on JCCC,Caiso Verified for Three scenarios: 1. Terminate plan election 2. Terminate Dependent Benefit 3. Terminate as never effective For Plan level and company level System actually terminate the election with the termination date shown in Actual Termination Date column. Working as expected. Thus Updating item state as ready for Stage. Thanks, Jayshree CC: Umesh Kadam Jyoti Mayne
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi Umesh Kadam,

            We have verified this enhancement on Stage on Caiso for HSPL.
            Verified for three scenario's:
            1)Terminate Election
            2)Terminate as never effective
            3)Terminate dependent's benefit
            Elections are going to get terminated after user puts the termination dates.
            Termination will be as per rules applied in Plan level if not then company level.
            And if rule is applied in Plan level as well as company level it terminates the election as per plan level rule.
            Working as expected.
            Thus updating item state as Ready for Production

            Thanks,
            Jayshree

            CC: Alankar Chavan Prasad Pise Rakesh Roy Jyoti Mayne

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi Umesh Kadam , We have verified this enhancement on Stage on Caiso for HSPL. Verified for three scenario's: 1)Terminate Election 2)Terminate as never effective 3)Terminate dependent's benefit Elections are going to get terminated after user puts the termination dates. Termination will be as per rules applied in Plan level if not then company level. And if rule is applied in Plan level as well as company level it terminates the election as per plan level rule. Working as expected. Thus updating item state as Ready for Production Thanks, Jayshree CC: Alankar Chavan Prasad Pise Rakesh Roy Jyoti Mayne
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi Umesh Kadam,

            Tested on Production for Austin for hspl,Long for hspl.
            No dates are showing in Actual termination date column And Cannot terminate Plan.
            Hence Re-opening this jira.

            Thanks,
            Jayshree

            CC; Alankar Chavan Prasad Pise Rakesh Roy Jyoti Mayne

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi Umesh Kadam , Tested on Production for Austin for hspl,Long for hspl. No dates are showing in Actual termination date column And Cannot terminate Plan. Hence Re-opening this jira. Thanks, Jayshree CC; Alankar Chavan Prasad Pise Rakesh Roy Jyoti Mayne
            Hide
            umesh.kadam Umesh Kadam (Inactive) added a comment -

            Hi Jayshree Nagpure,

            Please find 3Cs below.

            Concern No dates are showing in Actual termination date column And Cannot terminate Plan
            Cause Javascript required to convert datetime object in correct format was missing in production and hence it was throwing javascript error
            Correction We have deployed required Javascript in production and it is working fine now. Please check and confirm

            Thanks and Regards,
            :: Umesh Kadam

            CC : Jyoti Mayne, Alankar Chavan, Prasad Pise, Rakesh Roy

            Show
            umesh.kadam Umesh Kadam (Inactive) added a comment - Hi Jayshree Nagpure , Please find 3Cs below. Concern No dates are showing in Actual termination date column And Cannot terminate Plan Cause Javascript required to convert datetime object in correct format was missing in production and hence it was throwing javascript error Correction We have deployed required Javascript in production and it is working fine now. Please check and confirm Thanks and Regards, :: Umesh Kadam CC : Jyoti Mayne , Alankar Chavan , Prasad Pise , Rakesh Roy
            Hide
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment -

            Hi Umesh Kadam,

            Tested this enhancement on Production for long for hspl, austin for hspl.
            Verified for three scenario's:
            1)Terminate Election
            2)Terminate as never effective
            3)Terminate dependent's benefit
            Elections are going to get terminated after user puts the termination dates.
            Termination will be as per rules applied in Plan level if not then company level.
            And if rule is applied in Plan level as well as company level it terminates the election as per plan level rule.
            Working as expected.
            Thus updating item state as Production complete.

            Thanks,
            Jayshree

            CC: Jyoti Mayne Prasad Pise Alankar Chavan Rakesh Roy

            Show
            jayshree.nagpure Jayshree Nagpure (Inactive) added a comment - Hi Umesh Kadam , Tested this enhancement on Production for long for hspl, austin for hspl. Verified for three scenario's: 1)Terminate Election 2)Terminate as never effective 3)Terminate dependent's benefit Elections are going to get terminated after user puts the termination dates. Termination will be as per rules applied in Plan level if not then company level. And if rule is applied in Plan level as well as company level it terminates the election as per plan level rule. Working as expected. Thus updating item state as Production complete. Thanks, Jayshree CC: Jyoti Mayne Prasad Pise Alankar Chavan Rakesh Roy

              People

              Assignee:
              jayshree.nagpure Jayshree Nagpure (Inactive)
              Reporter:
              alankar.chavan Alankar Chavan (Inactive)
              Developer:
              Harshawardhan Phalake (Inactive)
              QA:
              Hrishikesh Deshpande (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 65h Original Estimate - 65h
                  65h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 95.25h
                  95.25h