Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-3301

The plan is termed but it is not termed from the employee’s account

    Details

    • Type: Enhancement
    • Status: Closed
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - Enrollment
    • Reported by:
      Support
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Must Have 25
    • Sprint:
      WT Sprint 8

      Description

      1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.

      2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.

        Attachments

          Issue Links

            Activity

            rashmita.dudhe Rashmita Dudhe (Inactive) created issue -
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Field Original Value New Value
            Assignee Vijay Siddha [ vijays ] Avnish Yadav [ avnish.yadav ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Description



            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.



            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.
            Item State Parent values: Development(10200)
            shyam.sharma shyam sharma (Inactive) made changes -
            Sprint WT Sprint 8 [ 21 ]
            shyam.sharma shyam sharma (Inactive) made changes -
            Rank Ranked higher
            shyam.sharma shyam sharma (Inactive) made changes -
            Module Parent values: BenAdmin(10100) Parent values: BenAdmin(10100)Level 1 values: Enrollment(10107)
            shyam.sharma shyam sharma (Inactive) made changes -
            Component/s BenAdmin [ 10000 ]
            shyam.sharma shyam sharma (Inactive) made changes -
            Link This issue relates to WT-174 [ WT-174 ]
            shyam.sharma shyam sharma (Inactive) made changes -
            Description


            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.


            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.
            Issue Importance Must Have 25 [ 12200 ]
            avnish.yadav Avnish Yadav (Inactive) made changes -
            Assignee Avnish Yadav [ avnish.yadav ] Girija Potdar [ girija.potdar ]
            shyam.sharma shyam sharma (Inactive) made changes -
            Code Review Date 22/Jul/2016
            Code Reviewed By Amruta Lohiya [ 11906 ]
            Description

            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.

            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.
            Dev Due Date 22/Jul/2016
            Dev Estimates 40
            Developer Girija Potdar [ girija.potdar ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Status New Request [ 10029 ] Pending for Approval [ 10002 ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Status Pending for Approval [ 10002 ] Approved for Development [ 10003 ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Status Approved for Development [ 10003 ] In Development [ 10007 ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Description
            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.
            1. Enrollments Termination date:-If plan has termination date, a). Set termination date as Null value to the enrollments OR b). Set "Plan termination date" to enrollments at the time of enrollment. Need to discuss this with Amit.


             


            2. Enrollment Service :- If we decide to set NULL, then a Automated Service run one day before OE start date (OE start date -1), If plan has termination date then this service will terminate all enrollments of that planand from OE Start Date to Fiscal Year end date - 1, enrollments will terminate immediately.
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204)
            girija.potdar Girija Potdar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: In Progress(10206)
            girija.potdar Girija Potdar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            rakeshr Rakesh Roy (Inactive) made changes -
            Link This issue duplicates WT-2047 [ WT-2047 ]
            gokul.sonawane Gokul Sonawane (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            girija.potdar Girija Potdar (Inactive) made changes -
            Assignee Girija Potdar [ girija.potdar ] Rashmita Dudhe [ rashmita.dudhe ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Need to discussed scenarios with amruta

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Need to discussed scenarios with amruta
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Test_Scenarios_3301.xls [ 23021 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Started testing On LB .

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Started testing On LB .
            rakeshr Rakesh Roy (Inactive) made changes -
            Production Due Date 04/Aug/2016
            Stage Due Date 3/Aug/16 [ 2016-08-03 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Verified on LB Environment.
            Verified all attached scenarios.
            Working Fine as expected.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Verified on LB Environment. Verified all attached scenarios. Working Fine as expected.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Local Testing [ 10200 ] Pending for Stage Approval [ 10300 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Pending for Stage Approval [ 10300 ] Approved for Stage [ 10030 ]
            Hide
            shyam.sharma shyam sharma (Inactive) added a comment -

            Rashmita Dudhe Rakesh Roy : when this will move on stage as 5 days ago this was already verified on LB ?

            Show
            shyam.sharma shyam sharma (Inactive) added a comment - Rashmita Dudhe Rakesh Roy : when this will move on stage as 5 days ago this was already verified on LB ?
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            shyam sharma This is already requested to Developer to check-in on stage and if he does will go in today's stage patch. This depends on developer.

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - shyam sharma This is already requested to Developer to check-in on stage and if he does will go in today's stage patch. This depends on developer.
            Hide
            girija.potdar Girija Potdar (Inactive) added a comment -

            Hi shyam sharma,

            The development for the enhancement is complete but as per the discussion with Amruta, we need to discuss one scenario with Amit Thorve.
            Hence we are not pushing the enhancement to Stage as of now.

            Thanks.

            Show
            girija.potdar Girija Potdar (Inactive) added a comment - Hi shyam sharma , The development for the enhancement is complete but as per the discussion with Amruta, we need to discuss one scenario with Amit Thorve. Hence we are not pushing the enhancement to Stage as of now. Thanks.
            rakeshr Rakesh Roy (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: LB QA(10201)Level 1 values: On Hold(10211)
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -
            Show
            rakeshr Rakesh Roy (Inactive) added a comment - Girija Potdar Please update. Amruta Lohiya shyam sharma
            Hide
            shyam.sharma shyam sharma (Inactive) added a comment -

            Girija Potdar :
            what is the status now as this is pending since long time?
            did Amruta Lohiya discussed with Amit T for required pending scenario ?
            please speed up this, this needs to be completed as soon as possible.

            CC Amruta Lohiya

            Show
            shyam.sharma shyam sharma (Inactive) added a comment - Girija Potdar : what is the status now as this is pending since long time? did Amruta Lohiya discussed with Amit T for required pending scenario ? please speed up this, this needs to be completed as soon as possible. CC Amruta Lohiya
            Hide
            girija.potdar Girija Potdar (Inactive) added a comment -

            Hi shyam sharma,

            We will be moving this to Stage today.

            Thanks.

            Show
            girija.potdar Girija Potdar (Inactive) added a comment - Hi shyam sharma , We will be moving this to Stage today. Thanks.
            gokul.sonawane Gokul Sonawane (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: On Hold(10211) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Approved for Stage [ 10030 ] Stage Testing [ 10201 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Started Working On This Verified some scenarios.
            Some scenarios are pending will continue testing tomorrow.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Started Working On This Verified some scenarios. Some scenarios are pending will continue testing tomorrow.
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Verified on Stage Environment.
            Verified all attached scenarios.
            Working Fine as expected.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Verified on Stage Environment. Verified all attached scenarios. Working Fine as expected.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Test_Scenarios_3301.xls [ 23021 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Test_Scenarios_3301 (2).xls [ 24758 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            Hide
            girija.potdar Girija Potdar (Inactive) added a comment - - edited

            Hi Rashmita Dudhe,

            As per our discussion, please verify all the scenarios discussed. Also give the new test cases and get it reviewed from Amruta.
            We have added a new service for this implementation with Case 28 for 'Terminate Election On Plan End Date'. Please verify if the service works as expected.

            Thanks.
            CC Amruta Lohiya

            Show
            girija.potdar Girija Potdar (Inactive) added a comment - - edited Hi Rashmita Dudhe , As per our discussion, please verify all the scenarios discussed. Also give the new test cases and get it reviewed from Amruta. We have added a new service for this implementation with Case 28 for 'Terminate Election On Plan End Date'. Please verify if the service works as expected. Thanks. CC Amruta Lohiya
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            as per discussion with Girija.
            Verified this on stage through UI and Service.
            Verified all attached scenarios and actual results are mention on sheet.
            It working fine as expected.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - as per discussion with Girija. Verified this on stage through UI and Service. Verified all attached scenarios and actual results are mention on sheet. It working fine as expected.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Test_Scenarios_3301 (2).xls [ 24758 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Attachment Test_Scenarios_3301_Updated.xls [ 25221 ]
            satyap Satya made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Verified on production.
            UI scenarios it is working fine.

            But Not able to test through Services.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Verified on production. UI scenarios it is working fine. But Not able to test through Services.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Stage Testing [ 10201 ] Pending for Production Approval [ 10301 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Pending for Production Approval [ 10301 ] Approved for production [ 10034 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Status Approved for production [ 10034 ] Production Testing [ 10202 ]
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Girija Potdar

            The service 28 for 'Terminate Election On Plan End Date' not available on production.
            Please check this so i can test this Enhancement through service scenarios.

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Girija Potdar The service 28 for 'Terminate Election On Plan End Date' not available on production. Please check this so i can test this Enhancement through service scenarios.
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production QA(10203)Level 1 values: Re-open(10220)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Assignee Rashmita Dudhe [ rashmita.dudhe ] Girija Potdar [ girija.potdar ]
            girija.potdar Girija Potdar (Inactive) made changes -
            Assignee Girija Potdar [ girija.potdar ] Rashmita Dudhe [ rashmita.dudhe ]
            Hide
            girija.potdar Girija Potdar (Inactive) added a comment -

            Hi Rashmita Dudhe,

            The batch file for this service was missing on production. Please verify now.

            Thanks

            Show
            girija.potdar Girija Potdar (Inactive) added a comment - Hi Rashmita Dudhe , The batch file for this service was missing on production. Please verify now. Thanks
            Hide
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment -

            Verified on production.
            Through services.
            termination date set to the plan properly.

            But Service execution showing Failed message .
            Creating another Jira for this WT4798

            Show
            rashmita.dudhe Rashmita Dudhe (Inactive) added a comment - Verified on production. Through services. termination date set to the plan properly. But Service execution showing Failed message . Creating another Jira for this WT4798
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Re-open(10220) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Link This issue relates to WT-4798 [ WT-4798 ]
            rashmita.dudhe Rashmita Dudhe (Inactive) made changes -
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Status Production Complete [ 10028 ] Closed [ 6 ]
            abhay.patil Abhay Patil (Inactive) made changes -
            Link This issue causes WT-13417 [ WT-13417 ]
            Transition Time In Source Status Execution Times
            Girija Potdar (Inactive) made transition -
            New Request Pending for Approval
            22d 1h 6m 1
            Girija Potdar (Inactive) made transition -
            Pending for Approval Approved for Development
            2s 1
            Girija Potdar (Inactive) made transition -
            Approved for Development In Development
            1s 1
            Girija Potdar (Inactive) made transition -
            In Development In LB Testing
            5d 6h 1m 1
            Rashmita Dudhe (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            5d 23h 46m 1
            Rashmita Dudhe (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            5s 1
            Rashmita Dudhe (Inactive) made transition -
            Approved for Stage Stage Testing
            19d 23h 15m 1
            Rashmita Dudhe (Inactive) made transition -
            Stage Testing Pending for Production Approval
            15d 54m 1
            Rashmita Dudhe (Inactive) made transition -
            Pending for Production Approval Approved for production
            2s 1
            Rashmita Dudhe (Inactive) made transition -
            Approved for production In Production Testing
            2s 1
            Rashmita Dudhe (Inactive) made transition -
            In Production Testing Production Complete
            7d 7m 1
            Rakesh Roy (Inactive) made transition -
            Production Complete Closed
            98d 23m 1

              People

              Assignee:
              rashmita.dudhe Rashmita Dudhe (Inactive)
              Reporter:
              rashmita.dudhe Rashmita Dudhe (Inactive)
              Developer:
              Girija Potdar (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date:
                Code Review Date: