Uploaded image for project: 'WORKTERRA'
  1. WORKTERRA
  2. WT-3377

Remove "Change will affect future enrollment "pop up from demographic page

    Details

    • Type: Change Request
    • Status: Production Complete
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: BenAdmin
    • Labels:
      None
    • Module:
      BenAdmin - EDS
    • Reported by:
      Support
    • Item State:
      Production Complete - Closed
    • Issue Importance:
      Must Have
    • Sprint:
      WT Sprint 32 - Enhancement
    • Severity:
      Medium

      Description

      Remove "Change will affect future enrollment "pop up from demographic page
      During demo walk through Dave suggested this change.

        Attachments

          Issue Links

            Activity

            rakeshr Rakesh Roy (Inactive) created issue -
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment - - edited
            Show
            rakeshr Rakesh Roy (Inactive) added a comment - - edited shyam sharma Satya Vijay Siddha FYI
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Field Original Value New Value
            Item State Parent values: Development(10200)Level 1 values: Development Backlog(10205)
            Hide
            rakeshr Rakesh Roy (Inactive) added a comment -

            As per Yesterday's discussion with Dave, this pop up should be removed from the system.

            Show
            rakeshr Rakesh Roy (Inactive) added a comment - As per Yesterday's discussion with Dave, this pop up should be removed from the system.
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Dev Estimates 40
            Hide
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment -

            As per the discussion with Dave, enhancements are prioritized for EDS team till 9th Sept.
            This enhancement will be taken after 9th Sept.

            CC: shyam sharma Satya Vijay Siddha

            Show
            swapnil.pandhare Swapnil Pandhare (Inactive) added a comment - As per the discussion with Dave, enhancements are prioritized for EDS team till 9th Sept. This enhancement will be taken after 9th Sept. CC: shyam sharma Satya Vijay Siddha
            swapnil.pandhare Swapnil Pandhare (Inactive) made changes -
            Assignee Swapnil Pandhare [ swapnil.pandhare ] Sheetal Bodhale [ sheetal.bodhale ]
            satyap Satya made changes -
            Sprint Enhancements: March-June 2017 [ 48 ]
            rakeshr Rakesh Roy (Inactive) made changes -
            Link This issue relates to NF-1433 [ NF-1433 ]
            satyap Satya made changes -
            Sprint Enhancements: March-June 2017 [ 48 ] WT Sprint 32 - Enhancement [ 75 ]
            hrishikesh.deshpande Hrishikesh Deshpande (Inactive) made changes -
            QA Deepali Tidke [ deepalit ] Rashmita Dudhe [ rashmita.dudhe ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status New Request [ 10029 ] Product Backlog [ 10100 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status Product Backlog [ 10100 ] Pending for Approval [ 10002 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status Pending for Approval [ 10002 ] Approved for Development [ 10003 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Status Approved for Development [ 10003 ] In Development [ 10007 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Development Backlog(10205) Parent values: Development(10200)Level 1 values: In Analysis(10204)
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 04/Jul/17 12:08 AM
            • Time Spent:
              4h
               
              <No comment>
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Dev Due Date 14/Jul/2017
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Remaining Estimate 0h [ 0 ]
            Time Spent 1.5h [ 5400 ]
            Worklog Id 62745 [ 62745 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 13/Jul/17 02:18 AM
            • Time Spent:
              1.5h
               

              code latest
              updated all configs
              resolved code issues

            jyotibala Jyotibala Pardeshi (Inactive) made changes -
            Time Spent 1.5h [ 5400 ] 5.5h [ 19800 ]
            Worklog Id 63416 [ 63416 ]
            jyotibala Jyotibala Pardeshi (Inactive) logged work - 15/Jul/17 12:29 AM
            • Time Spent:
              4h
               

              verified the changes on the local instance through partner, admin and employee login with various scenarios.

            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Analysis(10204) Parent values: Development(10200)Level 1 values: In Progress(10206)
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Attachment Analysis_PopMessage.doc [ 55710 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Attachment Unit Test Scanarioes.doc [ 55714 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: In Progress(10206) Parent values: Development(10200)Level 1 values: Ready for Review(10208)
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Attached analysis document and unit testing scenarios.
            CC:SatyaGaurav Sodani
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Attached analysis document and unit testing scenarios. CC: Satya Gaurav Sodani Thanks, Sheetal Bodhale
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Development(10200)Level 1 values: Ready for Review(10208) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Code Review Date 18/Jul/2017
            Code Reviewed By Satya Prakash [ 12300 ]
            Original Estimate 0h [ 0 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Assignee Sheetal Bodhale [ sheetal.bodhale ] Hrishikesh Deshpande [ hrishikesh.deshpande ]
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi Hrishikesh Deshpande,

            I have attached all possible test case scenarios.Please go through it.
            This enhancement should be tested thoroughly and this affects on all employee forms.

            CC:SatyaGaurav Sodani
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi Hrishikesh Deshpande , I have attached all possible test case scenarios.Please go through it. This enhancement should be tested thoroughly and this affects on all employee forms. CC: Satya Gaurav Sodani Thanks, Sheetal Bodhale
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 18/Jul/17 06:11 AM
            • Time Spent:
              5h
               

              coding
              testing
              discussion with rohan
              attached analysis and unit test scenarios.

            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 5.5h [ 19800 ] 10.5h [ 37800 ]
            Worklog Id 64134 [ 64134 ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            QA Rashmita Dudhe [ rashmita.dudhe ] Meghana Joshi [ meghana.kulkarni ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Assignee Hrishikesh Deshpande [ hrishikesh.deshpande ] Meghana Joshi [ meghana.kulkarni ]
            sachin.hingole Sachin Hingole (Inactive) made changes -
            Status In Development [ 10007 ] Local Testing [ 10200 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 25/Jul/2017
            Stage Due Date 24/Jul/17 [ 2017-07-24 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Link This issue relates to WT-10231 [ WT-10231 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Attachment WT 3377_Testing Scenarios.xls [ 56056 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Started testing on LB.

            Found One issue WT - 10231 and one Observation which are mentioned in attached sheet.

            Observation :
            Some time I observed that data saved successfully without save information pop up. ( Replicated Issue Ratio : 2 / 10)

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Started testing on LB. Found One issue WT - 10231 and one Observation which are mentioned in attached sheet. Observation : Some time I observed that data saved successfully without save information pop up. ( Replicated Issue Ratio : 2 / 10) CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 25/Jul/2017 27/Jul/2017
            Stage Due Date 24/Jul/17 [ 2017-07-24 ] 26/Jul/17 [ 2017-07-26 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 19/Jul/17 01:30 PM
            • Time Spent:
              6h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 10.5h [ 37800 ] 16.5h [ 59400 ]
            Worklog Id 64742 [ 64742 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 27/Jul/2017 01/Aug/2017
            meghana.joshi Meghana Joshi (Inactive) logged work - 20/Jul/17 07:52 AM
            • Time Spent:
              1h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 16.5h [ 59400 ] 17.5h [ 63000 ]
            Worklog Id 65199 [ 65199 ]
            ashwin.wankhede Ashwin Wankhede (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Link This issue relates to WT-10256 [ WT-10256 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 21/Jul/17 12:13 PM
            • Time Spent:
              4h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 17.5h [ 63000 ] 21.5h [ 77400 ]
            Worklog Id 65419 [ 65419 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Changed Stage Due date due to other found issues [ WT-10231 and WT-10256 ] are in Progress.

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Changed Stage Due date due to other found issues [ WT-10231 and WT-10256 ] are in Progress. CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 01/Aug/2017 03/Aug/2017
            Stage Due Date 26/Jul/17 [ 2017-07-26 ] 31/Jul/17 [ 2017-07-31 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 24/Jul/17 12:25 PM
            • Time Spent:
              7h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Link This issue relates to WT-10285 [ WT-10285 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 03/Aug/2017 08/Aug/2017
            Stage Due Date 31/Jul/17 [ 2017-07-31 ] 2/Aug/17 [ 2017-08-02 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 25/Jul/17 12:52 PM
            • Time Spent:
              8h
               

              Testing on LB

              Tested through QE Mode by Partner , Admin and Employee Login on IE 11 , Chrome Browsers
              Tested through Class wise Mode by Partner , Admin and Employee Login on IE 11 , Chrome Browsers

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 21.5h [ 77400 ] 29.5h [ 106200 ]
            Worklog Id 66229 [ 66229 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 26/Jul/17 12:24 PM
            • Time Spent:
              2h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 29.5h [ 106200 ] 31.5h [ 113400 ]
            Worklog Id 66568 [ 66568 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 31.5h [ 113400 ] 38.5h [ 138600 ]
            Worklog Id 66570 [ 66570 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Attachment WT 3377_Testing Scenarios.xls [ 56056 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Attachment WT 3377_Testing Scenarios.xls [ 56845 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Completed testing of WT-3377 on LB.

            Found Issue Status :

            1) WT - 10231 - Working Fine on LB
            2) WT - 10256 - Working Fine on LB.
            3) WT - 10285 - Development in Progress.

            We will move that patch on Azure ones WT - 10285 is completed on LB.

            PFA Test Scenrios.

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Completed testing of WT-3377 on LB. Found Issue Status : 1) WT - 10231 - Working Fine on LB 2) WT - 10256 - Working Fine on LB. 3) WT - 10285 - Development in Progress. We will move that patch on Azure ones WT - 10285 is completed on LB. PFA Test Scenrios. CC - Sachin Hingole
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 38.5h [ 138600 ] 42.5h [ 153000 ]
            Worklog Id 67217 [ 67217 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Attachment WT-3377_AdditionalScenarioes.xls [ 57008 ]
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi [~meghana joshi],

            Please find attached sheet of additional scenarios.

            CC:SatyaGaurav Sodani
            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi [~meghana joshi] , Please find attached sheet of additional scenarios. CC: Satya Gaurav Sodani Thanks, Sheetal Bodhale
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 42.5h [ 153000 ] 43h [ 154800 ]
            Worklog Id 67511 [ 67511 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 29/Jul/17 06:17 AM
            • Time Spent:
              0.5h
               

              Attached additional scenarios
              LB and truck check in

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment - - edited

            Verified all the attached scenarios on LB and reported issues on LB.
            All are working fine.

            Please deploy on Azure.

            CC - Sachin Hingole Satya

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - - edited Verified all the attached scenarios on LB and reported issues on LB. All are working fine. Please deploy on Azure. CC - Sachin Hingole Satya
            meghana.joshi Meghana Joshi (Inactive) logged work - 31/Jul/17 10:17 AM
            • Time Spent:
              2h
               

              LB Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 43h [ 154800 ] 45h [ 162000 ]
            Worklog Id 68226 [ 68226 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 45h [ 162000 ] 45.5h [ 163800 ]
            Worklog Id 68506 [ 68506 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 01/Aug/17 01:42 AM
            • Time Spent:
              0.5h
               

              code check in on azure
              scenario discussion with meghana

            ashwin.wankhede Ashwin Wankhede (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: LB Deployed(11600)
            Hide
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment -

            Hi [~meghana joshi],

            It is deployed on Azure.Please verify.
            CC:Satya

            Thanks,
            Sheetal Bodhale

            Show
            sheetal.bodhale Sheetal Bodhale (Inactive) added a comment - Hi [~meghana joshi] , It is deployed on Azure.Please verify. CC: Satya Thanks, Sheetal Bodhale
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) Parent values: LB QA(10201)Level 1 values: In Testing(10210)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Developer Sheetal Bodhale [ sheetal.bodhale ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 08/Aug/2017 10/Aug/2017
            Stage Due Date 2/Aug/17 [ 2017-08-02 ] 7/Aug/17 [ 2017-08-07 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Changed Stage and Production due date because testing on Azure is in Progress.
            Will change testing status one's testing will complete on Azure.

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Changed Stage and Production due date because testing on Azure is in Progress. Will change testing status one's testing will complete on Azure. CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) logged work - 01/Aug/17 01:05 PM
            • Time Spent:
              2.5h
               

              Azure Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 45.5h [ 163800 ] 48h [ 172800 ]
            Worklog Id 68689 [ 68689 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Link This issue relates to NF-4036 [ NF-4036 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 02/Aug/17 12:34 PM
            • Time Spent:
              1h
               

              Testing on Azure

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 48h [ 172800 ] 49h [ 176400 ]
            Worklog Id 68969 [ 68969 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Link This issue relates to NF-4053 [ NF-4053 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 03/Aug/17 12:51 PM
            • Time Spent:
              1h
               

              Testing

            meghana.joshi Meghana Joshi (Inactive) logged work - 03/Aug/17 12:56 PM - edited
            • Time Spent:
              4h
               

              Testing on Azure

            Hide
            satyap Satya added a comment -

            Let's deploy this on Stage & keep verifying all scenarios for at least 2 week. Once sure, only then we will move this to production.

            Regards,
            Satya Prakash

            Show
            satyap Satya added a comment - Let's deploy this on Stage & keep verifying all scenarios for at least 2 week. Once sure, only then we will move this to production. Regards, Satya Prakash
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Production Due Date 10/Aug/2017 22/Aug/2017
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: In Testing(10210) Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213)
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Verified all attached scenarios on Azure. Its working Fine

            Ready For Stage

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Verified all attached scenarios on Azure. Its working Fine Ready For Stage CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) logged work - 04/Aug/17 12:55 PM
            • Time Spent:
              8h
               

              Testing on Azure

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 49h [ 176400 ] 57h [ 205200 ]
            Worklog Id 69538 [ 69538 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 57h [ 205200 ] 62h [ 223200 ]
            Worklog Id 69541 [ 69541 ]
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602)
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 07/Aug/17 10:21 PM
            • Time Spent:
              20m
               

              stage check in

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) Parent values: Stage QA(10202)Level 1 values: In Testing(10214)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Local Testing [ 10200 ] Pending for Stage Approval [ 10300 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Pending for Stage Approval [ 10300 ] Approved for Stage [ 10030 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Approved for Stage [ 10030 ] Stage Testing [ 10201 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Severity Medium [ 13102 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 62h [ 223200 ] 62h 20m [ 224400 ]
            Worklog Id 70033 [ 70033 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 62h 20m [ 224400 ] 65h 20m [ 235200 ]
            Worklog Id 70065 [ 70065 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 08/Aug/17 12:53 PM
            • Time Spent:
              3h
               

              Stage Testing

            meghana.joshi Meghana Joshi (Inactive) logged work - 09/Aug/17 01:08 PM
            • Time Spent:
              2h
               

              Stage Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 65h 20m [ 235200 ] 67h 20m [ 242400 ]
            Worklog Id 70533 [ 70533 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 10/Aug/17 12:50 PM
            • Time Spent:
              1.5h
               

              Stage Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 67h 20m [ 242400 ] 68h 50m [ 247800 ]
            Worklog Id 70894 [ 70894 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 68h 50m [ 247800 ] 73h 20m [ 264000 ]
            Worklog Id 71147 [ 71147 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Tested all attached scenarios on Stage.
            Working Fine.

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Tested all attached scenarios on Stage. Working Fine. CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) logged work - 11/Aug/17 12:45 PM
            • Time Spent:
              4.5h
               

              Stage Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 73h 20m [ 264000 ] 74h 20m [ 267600 ]
            Worklog Id 71375 [ 71375 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Remaining Estimate 0h [ 0 ] 1h [ 3600 ]
            Time Spent 74h 20m [ 267600 ] 73h 20m [ 264000 ]
            Worklog Id 69541 [ 69541 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: In Testing(10214) Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217)
            khandu.kshirsagar Khandu Kshirsagar (Inactive) made changes -
            Item State Parent values: Stage QA(10202)Level 1 values: Ready for Production(10217) Parent values: Production QA(10203)Level 1 values: Production Deployed(10221)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) Parent values: Production QA(10203)Level 1 values: In Testing(10218)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Stage Testing [ 10201 ] Pending for Production Approval [ 10301 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Pending for Production Approval [ 10301 ] Approved for production [ 10034 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Status Approved for production [ 10034 ] Production Testing [ 10202 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 23/Aug/17 12:51 PM
            • Time Spent:
              1h
               

              Production Testing

            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Started Testing on Production.

            Tested through OE, New Hire, New Hire and OE at a time, QE with OE, Admin Login.

            Testing through Other login is in Progress.

            CC - Sachin Hingole

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Started Testing on Production. Tested through OE, New Hire, New Hire and OE at a time, QE with OE, Admin Login. Testing through Other login is in Progress. CC - Sachin Hingole
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Remaining Estimate 1h [ 3600 ] 0h [ 0 ]
            Time Spent 73h 20m [ 264000 ] 74h 20m [ 267600 ]
            Worklog Id 73832 [ 73832 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 74h 20m [ 267600 ] 74h 40m [ 268800 ]
            Worklog Id 73865 [ 73865 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 24/Aug/17 01:13 AM
            • Time Spent:
              20m
               

              code check in in production branch

            meghana.joshi Meghana Joshi (Inactive) logged work - 24/Aug/17 01:25 PM
            • Time Spent:
              3h
               

              Production Testing

            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 74h 40m [ 268800 ] 77h 40m [ 279600 ]
            Worklog Id 74137 [ 74137 ]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Item State Parent values: Production QA(10203)Level 1 values: In Testing(10218) Parent values: Production Complete(10222)Level 1 values: Closed(10223)
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Time Spent 77h 40m [ 279600 ] 78h 40m [ 283200 ]
            Worklog Id 74354 [ 74354 ]
            sheetal.bodhale Sheetal Bodhale (Inactive) made changes -
            Time Spent 78h 40m [ 283200 ] 78h 55m [ 284100 ]
            Worklog Id 74356 [ 74356 ]
            Hide
            meghana.joshi Meghana Joshi (Inactive) added a comment -

            Hi Jennifer Leugers ,

            I have verified all the attached scenarios on Production.
            Working Fine.

            Kindly , Check from your side and close jira accordingly.

            CC - Sachin Hingole

            Thanks,
            [~meghana joshi]

            Show
            meghana.joshi Meghana Joshi (Inactive) added a comment - Hi Jennifer Leugers , I have verified all the attached scenarios on Production. Working Fine. Kindly , Check from your side and close jira accordingly. CC - Sachin Hingole Thanks, [~meghana joshi]
            meghana.joshi Meghana Joshi (Inactive) made changes -
            Assignee Meghana Joshi [ meghana.kulkarni ] Jennifer Leugers [ jennifer.leugers ]
            Resolution Fixed [ 1 ]
            Status Production Testing [ 10202 ] Production Complete [ 10028 ]
            meghana.joshi Meghana Joshi (Inactive) logged work - 28/Aug/17 12:40 PM
            • Time Spent:
              1h
               

              Production Testing

            sheetal.bodhale Sheetal Bodhale (Inactive) logged work - 29/Aug/17 06:42 AM
            • Time Spent:
              0.25h
               

              discussion with Meghana on signature control issue

            Transition Time In Source Status Execution Times
            Sheetal Bodhale (Inactive) made transition -
            New Request Product Backlog
            363d 12h 35m 1
            Sheetal Bodhale (Inactive) made transition -
            Product Backlog Pending for Approval
            6s 1
            Sheetal Bodhale (Inactive) made transition -
            Pending for Approval Approved for Development
            3s 1
            Sheetal Bodhale (Inactive) made transition -
            Approved for Development In Development
            2s 1
            Sachin Hingole (Inactive) made transition -
            In Development In LB Testing
            15d 2h 51m 1
            Meghana Joshi (Inactive) made transition -
            In LB Testing Pending for Stage Approval
            20d 20h 11m 1
            Meghana Joshi (Inactive) made transition -
            Pending for Stage Approval Approved for Stage
            3s 1
            Meghana Joshi (Inactive) made transition -
            Approved for Stage Stage Testing
            3s 1
            Meghana Joshi (Inactive) made transition -
            Stage Testing Pending for Production Approval
            15d 2h 1
            Meghana Joshi (Inactive) made transition -
            Pending for Production Approval Approved for production
            2s 1
            Meghana Joshi (Inactive) made transition -
            Approved for production In Production Testing
            2s 1
            Meghana Joshi (Inactive) made transition -
            In Production Testing Production Complete
            4d 23h 33m 1

              People

              Assignee:
              jennifer.leugers Jennifer Leugers
              Reporter:
              rakeshr Rakesh Roy (Inactive)
              Account Executive:
              David Rhodes (Inactive)
              Developer:
              Sheetal Bodhale (Inactive)
              QA:
              Meghana Joshi (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Dev Due Date:
                Pre-Prod Due Date:
                Production Due Date:
                Code Review Date:

                  Time Tracking

                  Estimated:
                  Original Estimate - 0h
                  0h
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 78h 55m
                  78h 55m