Type:
Enhancement
-
Status: Production Complete
-
Priority:
Medium
-
Resolution: Bug Fixed
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: OnBoard
-
Labels:None
-
Module:OnBoard
-
Reported by:Support
-
Company:MATT Construction
-
Item State:LB QA - On Hold
-
Issue Importance:Q1
-
Sprint:NF Sprint 5
- blocks
-
NF-532 Issues with 'E-Verify Case Status' report.
-
- Rejected
-
- is caused by
-
NF-757 Incorrect Issuing Authority code sending to E-verify
-
- Rejected
-
-
NF-1072 Case 1: The No Show Case
-
- Rejected
-
-
NF-1073 Case 4: The Naturalized Citizen Case - Block
-
- Rejected
-
-
NF-1074 Case 8: The COI Case - Block
-
- Closed
-
-
NF-1075 Case 7: The Two ReVerify Case Not complete tested - Block
-
- Rejected
-
-
NF-1325 Case 2: The Queuing Case
-
- Rejected
-
-
NF-1326 Case 3: The Passport Case
-
- Rejected
-
-
NF-1327 Case 6: The Second Step Case
-
- Rejected
-
- relates to
-
NF-741 I-9 Approval Status >> Dropdown control going out of Close Case popup.
-
- Rejected
-
-
NF-749 I-9 Approval Status >> Status Incomplete is not getting changed to DHS Tentative Non confirmation / SSA TNC
-
- Rejected
-
-
NF-751 I-9 Approval Status >> Issues observed in TNC Process popup
-
- Rejected
-
-
NF-758 I-9 Approval Status >> Action button has incorrect graphics.
-
- Closed
-
-
NF-914 I-9 Approval Status >> Error 'Hire Date is required' displayed
-
- Rejected
-
-
WT-3622 Issues observed in OnBoard Module on LB
-
- Rejected
-
-
WT-7106 Form I-9 Employment HTML UI re-design
-
- Closed
-
Field | Original Value | New Value |
---|---|---|
Sprint | WT Sprint 5 [ 13 ] |
Rank | Ranked higher |
Developer | Vaishali Dere [ vaishali.dere ] |
Status | New Request [ 10029 ] | Pending for Approval [ 10002 ] |
Status | Pending for Approval [ 10002 ] | Approved for Development [ 10003 ] |
Status | Approved for Development [ 10003 ] | In Development [ 10007 ] |
Code Reviewed By | Swapnil Pandhare [ 11900 ] | |
Dev Estimates | 56 |
Code Review Date | 13/Jun/2016 | |
Dev Due Date | 13/Jun/2016 |
Production Due Date | 23/Jun/2016 | |
QA | Rajendra Joshi [ rajendraj ] | |
QA Due Date | 16/Jun/2016 | |
Stage Due Date | 20/Jun/16 [ 2016-06-20 ] |
Item State | Parent values: Development(10200)Level 1 values: On Hold(10207) |
Sprint | WT Sprint 5 [ 13 ] | Sprint 6 [ 19 ] |
Rank | Ranked lower |
Assignee | Vaishali Dere [ vaishali.dere ] | Aarati Sabnis [ aarati.sabnis ] |
Assignee | Aarati Sabnis [ aarati.sabnis ] | Niteen Surwase [ niteen.surwase ] |
Sprint | WT Sprint 6 [ 19 ] |
Sprint | Must Have Oct-Dec [ 10 ] |
Rank | Ranked higher |
Remaining Estimate | 35h [ 126000 ] | |
Original Estimate | 35h [ 126000 ] |
Remaining Estimate | 35h [ 126000 ] | 26h [ 93600 ] |
Time Spent | 9h [ 32400 ] | |
Worklog Id | 10738 [ 10738 ] |
Remaining Estimate | 26h [ 93600 ] | 19h [ 68400 ] |
Time Spent | 9h [ 32400 ] | 16h [ 57600 ] |
Worklog Id | 10963 [ 10963 ] |
Remaining Estimate | 19h [ 68400 ] | 18h [ 64800 ] |
Time Spent | 16h [ 57600 ] | 17h [ 61200 ] |
Worklog Id | 10990 [ 10990 ] |
Remaining Estimate | 18h [ 64800 ] | 17h [ 61200 ] |
Time Spent | 17h [ 61200 ] | 18h [ 64800 ] |
Worklog Id | 11539 [ 11539 ] |
Remaining Estimate | 17h [ 61200 ] | 15h [ 54000 ] |
Time Spent | 18h [ 64800 ] | 20h [ 72000 ] |
Worklog Id | 11540 [ 11540 ] |
Remaining Estimate | 15h [ 54000 ] | 16h [ 57600 ] |
Time Spent | 20h [ 72000 ] | 19h [ 68400 ] |
Worklog Id | 11539 [ 11539 ] | |
Worklog Time Spent | 1 hour [ 3600 ] |
Remaining Estimate | 16h [ 57600 ] | 15h [ 54000 ] |
Time Spent | 19h [ 68400 ] | 20h [ 72000 ] |
Worklog Id | 10963 [ 10963 ] |
-
- Time Spent:
- 5h
-
Analysis and coding for I9 EVerify
Remaining Estimate | 15h [ 54000 ] | 9h [ 32400 ] |
Time Spent | 20h [ 72000 ] | 26h [ 93600 ] |
Worklog Id | 11612 [ 11612 ] |
Remaining Estimate | 9h [ 32400 ] | 10h [ 36000 ] |
Time Spent | 26h [ 93600 ] | 25h [ 90000 ] |
Worklog Id | 11612 [ 11612 ] |
-
- Time Spent:
- 2.5h
-
Checking E-verify replies and XMLs for I-9 submit functionality.
Remaining Estimate | 10h [ 36000 ] | 8.5h [ 30600 ] |
Time Spent | 25h [ 90000 ] | 26.5h [ 95400 ] |
Worklog Id | 11730 [ 11730 ] |
-
- Time Spent:
- 8h
-
Checked Everify service issue
Remaining Estimate | 8.5h [ 30600 ] | 0.5h [ 1800 ] |
Time Spent | 26.5h [ 95400 ] | 34.5h [ 124200 ] |
Worklog Id | 11762 [ 11762 ] |
Original Estimate | 35h [ 126000 ] | 51h [ 183600 ] |
-
- Time Spent:
- 1.5h
-
Checking XML troubleshooting from e-verify reply
-
- Time Spent:
- 5h
-
Coding and verifying I9 verification details on web service
Remaining Estimate | 0.5h [ 1800 ] | 0h [ 0 ] |
Time Spent | 34.5h [ 124200 ] | 39.5h [ 142200 ] |
Worklog Id | 11993 [ 11993 ] |
Time Spent | 39.5h [ 142200 ] | 42h [ 151200 ] |
Worklog Id | 12048 [ 12048 ] |
-
- Time Spent:
- 8h
-
SubmitInitalVerification() : Working on this case and Mapping data from model to web service object.
Time Spent | 42h [ 151200 ] | 50h [ 180000 ] |
Worklog Id | 12156 [ 12156 ] |
Developer | Vaishali Dere [ vaishali.dere ] | Niteen Surwase [ niteen.surwase ] |
-
- Time Spent:
- 4h
-
Working on SupportingDocType and Model Values for SubmitInitialVerification
Time Spent | 50h [ 180000 ] | 53h [ 190800 ] |
Worklog Id | 12370 [ 12370 ] |
Time Spent | 53h [ 190800 ] | 54h [ 194400 ] |
Worklog Id | 12370 [ 12370 ] |
-
- Time Spent:
- 3h
-
Checked for UI and Validation
Time Spent | 54h [ 194400 ] | 57h [ 205200 ] |
Worklog Id | 12494 [ 12494 ] |
-
- Time Spent:
- 2h
-
Working for validation and UI for I-9
Time Spent | 57h [ 205200 ] | 59h [ 212400 ] |
Worklog Id | 12805 [ 12805 ] |
-
- Time Spent:
- 6h
-
UI revamp for I9 form Section I Section ii - List A Docs
Time Spent | 59h [ 212400 ] | 65h [ 234000 ] |
Worklog Id | 13122 [ 13122 ] |
-
- Time Spent:
- 7h
-
UI revamp for Section 2 A B C Lists
Original Estimate | 51h [ 183600 ] | 120h [ 432000 ] |
Time Spent | 65h [ 234000 ] | 72h [ 259200 ] |
Worklog Id | 13526 [ 13526 ] |
Time Spent | 72h [ 259200 ] | 74.5h [ 268200 ] |
Worklog Id | 14006 [ 14006 ] |
-
- Time Spent:
- 2.5h
-
Worked on I9-Form validations
-
- Time Spent:
- 3h
-
Client side validations for I-9 form fields
Time Spent | 74.5h [ 268200 ] | 77.5h [ 279000 ] |
Worklog Id | 14288 [ 14288 ] |
-
- Time Spent:
- 5.5h
-
I-9 Form validation and analysis and UI Discussion and Validation on I-9 form
Time Spent | 77.5h [ 279000 ] | 83h [ 298800 ] |
Worklog Id | 14540 [ 14540 ] |
-
- Time Spent:
- 3.5h
-
I-9 Form UI and USCIS validations - View and Model
Time Spent | 83h [ 298800 ] | 86.5h [ 311400 ] |
Worklog Id | 14748 [ 14748 ] |
-
- Time Spent:
- 1.5h
-
Worked on UI and Model Validation and States Dropdwon
Time Spent | 86.5h [ 311400 ] | 88h [ 316800 ] |
Worklog Id | 15069 [ 15069 ] |
-
- Time Spent:
- 1h
-
Communication with E-verify team.
-
- Time Spent:
- 5.5h
-
Issue Authority Validation and Fields at Model
Time Spent | 88h [ 316800 ] | 93.5h [ 336600 ] |
Worklog Id | 15205 [ 15205 ] |
-
- Time Spent:
- 2.5h
-
Excel-sheet issues analysed and checked
Time Spent | 93.5h [ 336600 ] | 96h [ 345600 ] |
Worklog Id | 15208 [ 15208 ] |
Time Spent | 96h [ 345600 ] | 99h [ 356400 ] |
Worklog Id | 15276 [ 15276 ] |
Time Spent | 99h [ 356400 ] | 100h [ 360000 ] |
Worklog Id | 15284 [ 15284 ] |
-
- Time Spent:
- 3h
-
R & D on docs given by E-verify team.
-
- Time Spent:
- 3h
-
Analysis of self test cases given by E-verify team.
Time Spent | 100h [ 360000 ] | 103h [ 370800 ] |
Worklog Id | 15631 [ 15631 ] |
-
- Time Spent:
- 7.5h
-
Analysis on I9 Documents and Technical Discussion with Swapnil.
Checking Document scenario to Submit I9 form
Time Spent | 103h [ 370800 ] | 110.5h [ 397800 ] |
Worklog Id | 15781 [ 15781 ] |
-
- Time Spent:
- 5h
-
Technical discussion with Niteen and R&D on Issuing authorities and ICA document by E-verify
Time Spent | 110.5h [ 397800 ] | 115.5h [ 415800 ] |
Worklog Id | 15834 [ 15834 ] |
Time Spent | 115.5h [ 415800 ] | 118.5h [ 426600 ] |
Worklog Id | 15936 [ 15936 ] |
Remaining Estimate | 0h [ 0 ] | 1.5h [ 5400 ] |
-
- Time Spent:
- 4h
-
R&D and Analysis on I-9 E-verify web service and Documents
Remaining Estimate | 1.5h [ 5400 ] | 33.5h [ 120600 ] |
Original Estimate | 120h [ 432000 ] | 152h [ 547200 ] |
Remaining Estimate | 33.5h [ 120600 ] | 29.5h [ 106200 ] |
Time Spent | 118.5h [ 426600 ] | 122.5h [ 441000 ] |
Worklog Id | 15991 [ 15991 ] |
-
- Time Spent:
- 3h
-
Trying different cases for Initial Verification
Remaining Estimate | 29.5h [ 106200 ] | 26.5h [ 95400 ] |
Time Spent | 122.5h [ 441000 ] | 125.5h [ 451800 ] |
Worklog Id | 15993 [ 15993 ] |
-
- Time Spent:
- 2h
-
Worked on SubmitInitialVerification() and ContinueDuplicateCase() method for case 1
Remaining Estimate | 26.5h [ 95400 ] | 24.5h [ 88200 ] |
Time Spent | 125.5h [ 451800 ] | 127.5h [ 459000 ] |
Worklog Id | 16179 [ 16179 ] |
-
- Time Spent:
- 2h
-
Worked on SubmitDHSReverify() method for case 1
-
- Time Spent:
- 1.5h
-
Worked on SetDHSTnCNotifications method for case 1
Remaining Estimate | 24.5h [ 88200 ] | 22.5h [ 81000 ] |
Time Spent | 127.5h [ 459000 ] | 129.5h [ 466200 ] |
Worklog Id | 16180 [ 16180 ] |
Remaining Estimate | 22.5h [ 81000 ] | 21h [ 75600 ] |
Time Spent | 129.5h [ 466200 ] | 131h [ 471600 ] |
Worklog Id | 16181 [ 16181 ] |
-
- Time Spent:
- 1.5h
-
Worked on SubmitDHSReferrel method for case 1
-
- Time Spent:
- 1.5h
-
Worked on RetrieveLatter() method for case 1
Remaining Estimate | 21h [ 75600 ] | 19.5h [ 70200 ] |
Time Spent | 131h [ 471600 ] | 132.5h [ 477000 ] |
Worklog Id | 16182 [ 16182 ] |
Remaining Estimate | 19.5h [ 70200 ] | 18h [ 64800 ] |
Time Spent | 132.5h [ 477000 ] | 134h [ 482400 ] |
Worklog Id | 16183 [ 16183 ] |
Sprint | Must Have Oct-Dec [ 10 ] |
Rank | Ranked lower |
-
- Time Spent:
- 3h
-
Checking Test cases for I-9 and Analyzing Documents List
Remaining Estimate | 18h [ 64800 ] | 15h [ 54000 ] |
Time Spent | 134h [ 482400 ] | 137h [ 493200 ] |
Worklog Id | 16916 [ 16916 ] |
-
- Time Spent:
- 3h
-
Coding for self test cases and saving to database , Discussion with Niteen.
-
- Time Spent:
- 6h
-
Document Drop-down Validation for Citizenship Code wise and Save and Update data of I-9 section at DB.
Remaining Estimate | 15h [ 54000 ] | 9h [ 32400 ] |
Time Spent | 137h [ 493200 ] | 143h [ 514800 ] |
Worklog Id | 17184 [ 17184 ] |
-
- Time Spent:
- 3h
-
Created E-verify case 4 scenario and checked through code.
-
- Time Spent:
- 1h
-
Worked with Swapnil for E-verify to Retrieve Letters from Everify.
Remaining Estimate | 9h [ 32400 ] | 6h [ 21600 ] |
Time Spent | 143h [ 514800 ] | 146h [ 525600 ] |
Worklog Id | 17475 [ 17475 ] |
-
- Time Spent:
- 2h
-
Implemented SSATnCNofication() method and made RetrieveLetters() method Modular
Remaining Estimate | 6h [ 21600 ] | 5h [ 18000 ] |
Time Spent | 146h [ 525600 ] | 147h [ 529200 ] |
Worklog Id | 17476 [ 17476 ] |
Remaining Estimate | 5h [ 18000 ] | 3h [ 10800 ] |
Time Spent | 147h [ 529200 ] | 149h [ 536400 ] |
Worklog Id | 17478 [ 17478 ] |
Worklog Id | 17478 [ 17478 ] |
Worklog Id | 17478 [ 17478 ] |
-
- Time Spent:
- 4h
-
Coding and analysis for Self test cases execution
Remaining Estimate | 3h [ 10800 ] | 0h [ 0 ] |
Time Spent | 149h [ 536400 ] | 153h [ 550800 ] |
Worklog Id | 17506 [ 17506 ] |
Time Spent | 153h [ 550800 ] | 156h [ 561600 ] |
Worklog Id | 17510 [ 17510 ] |
Worklog Id | 17510 [ 17510 ] |
Time Spent | 156h [ 561600 ] | 159h [ 572400 ] |
Worklog Id | 17511 [ 17511 ] |
-
- Time Spent:
- 1h
-
Analysis of Document types and issuing authorities in I-9
-
- Time Spent:
- 2h
-
CloseCase() Modular and Code refactoring for better reusability
Time Spent | 159h [ 572400 ] | 161h [ 579600 ] |
Worklog Id | 17875 [ 17875 ] |
Item State | Parent values: Development(10200)Level 1 values: On Hold(10207) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Development(10200)Level 1 values: In Progress(10206) |
-
- Time Spent:
- 3h
-
Discussion with Niteen for I-9 queries.
Analysis of Issuing authority for List B documents.
Time Spent | 161h [ 579600 ] | 162h [ 583200 ] |
Worklog Id | 18053 [ 18053 ] |
-
- Time Spent:
- 2h
-
Type changing and testing on I94Adminssion and USCIS Number
-
- Time Spent:
- 2h
-
Working on I-9 Data saving and Session management
Time Spent | 162h [ 583200 ] | 164h [ 590400 ] |
Worklog Id | 18080 [ 18080 ] |
Time Spent | 164h [ 590400 ] | 166h [ 597600 ] |
Worklog Id | 18082 [ 18082 ] |
-
- Time Spent:
- 2h
-
Scenario testing and Discussion with swapnil
-
- Time Spent:
- 2h
-
Preparing code for Self Test Case five
Time Spent | 166h [ 597600 ] | 168h [ 604800 ] |
Worklog Id | 18084 [ 18084 ] |
Time Spent | 168h [ 604800 ] | 170h [ 612000 ] |
Worklog Id | 18085 [ 18085 ] |
-
- Time Spent:
- 4h
-
Discussion with Niteen for I-9 queries,
Analysis,coding for Citizenship status and documents required as per ICA document by USCIS
-
- Time Spent:
- 3h
-
Working on I9 Data saving at Database
-
- Time Spent:
- 2h
-
Section 2 Document validation while fields are hidden
-
- Time Spent:
- 3h
-
Discussion with Swapnil and Case 5 initial Submission
Time Spent | 170h [ 612000 ] | 173h [ 622800 ] |
Worklog Id | 18285 [ 18285 ] |
Time Spent | 173h [ 622800 ] | 175h [ 630000 ] |
Worklog Id | 18286 [ 18286 ] |
Time Spent | 175h [ 630000 ] | 178h [ 640800 ] |
Worklog Id | 18288 [ 18288 ] |
-
- Time Spent:
- 4h
-
Get employment verification fields coding
-
- Time Spent:
- 2h
-
TnCNotification column adding in DB and Value Objects
-
- Time Spent:
- 2h
-
Working on case five to Submit case from WT UI
Time Spent | 178h [ 640800 ] | 180h [ 648000 ] |
Worklog Id | 18457 [ 18457 ] |
-
- Time Spent:
- 2h
-
Worked on Case five to make next step and Enabling sessions for case number and approval return statuses.
Time Spent | 180h [ 648000 ] | 182h [ 655200 ] |
Worklog Id | 18458 [ 18458 ] |
Time Spent | 182h [ 655200 ] | 184h [ 662400 ] |
Worklog Id | 18461 [ 18461 ] |
-
- Time Spent:
- 4h
-
Getresolvedcases code changes
-
- Time Spent:
- 3.25h
-
Implementation for Save Letter in DB and Uploading Letters into File Server
Time Spent | 184h [ 662400 ] | 187.25h [ 674100 ] |
Worklog Id | 18752 [ 18752 ] |
-
- Time Spent:
- 2h
-
Brought Case five to SSA Referral with DB opreations
-
- Time Spent:
- 2.25h
-
Saving Letter Code to DB and Implementation of SubmitSsaResubmittal()
Time Spent | 187.25h [ 674100 ] | 189.25h [ 681300 ] |
Worklog Id | 18753 [ 18753 ] |
Time Spent | 189.25h [ 681300 ] | 191.5h [ 689400 ] |
Worklog Id | 18754 [ 18754 ] |
Time Spent | 191.5h [ 689400 ] | 195.5h [ 703800 ] |
Worklog Id | 19003 [ 19003 ] |
Worklog Id | 19003 [ 19003 ] |
Time Spent | 195.5h [ 703800 ] | 199.5h [ 718200 ] |
Worklog Id | 19006 [ 19006 ] |
Time Spent | 199.5h [ 718200 ] | 203.5h [ 732600 ] |
Worklog Id | 19007 [ 19007 ] |
Time Spent | 203.5h [ 732600 ] | 207.5h [ 747000 ] |
Worklog Id | 19009 [ 19009 ] |
Time Spent | 207.5h [ 747000 ] | 210.5h [ 757800 ] |
Worklog Id | 19010 [ 19010 ] |
-
- Time Spent:
- 1.25h
-
UI Design for reasoning part of I9 Form
Time Spent | 210.5h [ 757800 ] | 211.5h [ 761400 ] |
Worklog Id | 19131 [ 19131 ] |
Time Spent | 211.5h [ 761400 ] | 211.75h [ 762300 ] |
Worklog Id | 19131 [ 19131 ] |
-
- Time Spent:
- 5h
-
- Completed I9 Case Five
- Worked on Duplicate Reasons fro UI
- Implementation of Photo Matching case (Retrieve and Confirm photo)
Time Spent | 211.75h [ 762300 ] | 216.75h [ 780300 ] |
Worklog Id | 19356 [ 19356 ] |
-
- Time Spent:
- 4.25h
-
Completed Duplicate case through Workterra UI.
Photo Matching cose and Validation for that.
Resubmitting Case 5
Time Spent | 216.75h [ 780300 ] | 220.75h [ 794700 ] |
Worklog Id | 19575 [ 19575 ] |
Time Spent | 220.75h [ 794700 ] | 221h [ 795600 ] |
Worklog Id | 19575 [ 19575 ] |
-
- Time Spent:
- 3.5h
-
Analysis and working on Photo Matching view and other I9 form Validation
Time Spent | 221h [ 795600 ] | 224.5h [ 808200 ] |
Worklog Id | 19785 [ 19785 ] |
Item State | Parent values: Development(10200)Level 1 values: In Progress(10206) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Development(10200)Level 1 values: In Progress(10206) |
-
- Time Spent:
- 6h
-
- Photo Matching Implementation and Validations
- Case Five Completed
- Implementation (Model and Bussiness Logic) Changed for I-9 Approval Status
Time Spent | 224.5h [ 808200 ] | 230.5h [ 829800 ] |
Worklog Id | 19986 [ 19986 ] |
-
- Time Spent:
- 2h
-
Get resolved cases API changes
Time Spent | 230.5h [ 829800 ] | 232.5h [ 837000 ] |
Worklog Id | 20124 [ 20124 ] |
-
- Time Spent:
- 4h
-
- Removing unused sessions from Photo Verification page
- Adding MessageCode to I-9 Approval status View, model and vb.
- other I9 validations and code refacto
-
- Time Spent:
- 1h
-
Checking validations for LB (issuing Authority Error Message and Drop-down problem )
Time Spent | 232.5h [ 837000 ] | 236.5h [ 851400 ] |
Worklog Id | 20363 [ 20363 ] |
Time Spent | 236.5h [ 851400 ] | 237.5h [ 855000 ] |
Worklog Id | 20369 [ 20369 ] |
-
- Time Spent:
- 3.5h
-
Completed Case Five and requirement Analysis for it.
-
- Time Spent:
- 4h
-
Close Case View(Validation, UI), Model(Close case method) and Controller(Action) implemenation
Time Spent | 237.5h [ 855000 ] | 240.5h [ 865800 ] |
Worklog Id | 20807 [ 20807 ] |
Time Spent | 240.5h [ 865800 ] | 244.5h [ 880200 ] |
Worklog Id | 20808 [ 20808 ] |
Time Spent | 244.5h [ 880200 ] | 245h [ 882000 ] |
Worklog Id | 20807 [ 20807 ] |
-
- Time Spent:
- 3.5h
-
Close Case implimenation, validation and testing
-
- Time Spent:
- 3h
-
Close case and Eligibility Statement Implemenation of it
Time Spent | 245h [ 882000 ] | 248.5h [ 894600 ] |
Worklog Id | 21017 [ 21017 ] |
Time Spent | 248.5h [ 894600 ] | 251.5h [ 905400 ] |
Worklog Id | 21018 [ 21018 ] |
-
- Time Spent:
- 1.5h
-
Create E-verify status mapping sheet
Time Spent | 251.5h [ 905400 ] | 253h [ 910800 ] |
Worklog Id | 28176 [ 28176 ] |
-
- Time Spent:
- 1h
-
Analysis and discussion with Developers
-
- Time Spent:
- 4h
-
Check-in (Adding to stage) Project files and Localisation files and writing DDL, DML and Access Right scripts.
Time Spent | 253h [ 910800 ] | 257h [ 925200 ] |
Worklog Id | 28850 [ 28850 ] |
Worklog Id | 28850 [ 28850 ] |
Assignee | Niteen Surwase [ niteen.surwase ] | Sachin Hingole [ sachin.hingole ] |
Status | In Development [ 10007 ] | Mockup Approval [ 10010 ] |
Status | Mockup Approval [ 10010 ] | Mockup Approved [ 10012 ] |
Status | Mockup Approved [ 10012 ] | In Development [ 10007 ] |
Status | In Development [ 10007 ] | Local Testing [ 10200 ] |
Item State | Parent values: Development(10200)Level 1 values: In Progress(10206) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Status | Local Testing [ 10200 ] | Pending for Stage Approval [ 10300 ] |
Status | Pending for Stage Approval [ 10300 ] | Approved for Stage [ 10030 ] |
Status | Approved for Stage [ 10030 ] | Stage Testing [ 10201 ] |
Assignee | Sachin Hingole [ sachin.hingole ] | Rajendra Joshi [ rajendraj ] |
Sprint | NF Sprint 6 [ 47 ] |
Sprint | NF Sprint 6 [ 47 ] | NF Sprint 5 [ 15 ] |
Component/s | OnBoard [ 11200 ] | |
Component/s | I9 Stand Alone [ 10905 ] |
-
- Time Spent:
- 4h
-
Code review and checking password and submit e-verification changes
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
-
- Time Spent:
- 3h
-
DB Scripts creation and Check-in on Local and Stage.
I9 Changes checking-in on stage.
-
- Time Spent:
- 5h
-
Solving download issue for E-verify Letters.
Document validation for sec1 and sec2.
Time Spent | 257h [ 925200 ] | 260h [ 936000 ] |
Worklog Id | 29207 [ 29207 ] |
Time Spent | 260h [ 936000 ] | 265h [ 954000 ] |
Worklog Id | 29208 [ 29208 ] |
Time Spent | 265h [ 954000 ] | 269h [ 968400 ] |
Worklog Id | 29290 [ 29290 ] |
-
- Time Spent:
- 2h
-
Code check-in to stage branch and unit testing of build upload on stage.
Time Spent | 269h [ 968400 ] | 271h [ 975600 ] |
Worklog Id | 29311 [ 29311 ] |
Issue Importance | Q1 [ 14900 ] |
Production Due Date | 23/Jun/2016 | 28/Jun/2016 |
Production Due Date | 28/Jun/2016 | 28/Mar/2017 |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Time Spent | 271h [ 975600 ] | 271.5h [ 977400 ] |
Worklog Id | 30596 [ 30596 ] |
Time Spent | 271.5h [ 977400 ] | 272.5h [ 981000 ] |
Worklog Id | 30600 [ 30600 ] |
-
- Time Spent:
- 4h
-
Document validations and JS Code Refactoring
Time Spent | 272.5h [ 981000 ] | 276.5h [ 995400 ] |
Worklog Id | 30965 [ 30965 ] |
-
- Time Spent:
- 8h
-
E-verify status analysis
-
- Time Spent:
- 3h
-
Production Certification with swapnil
-
- Time Spent:
- 2h
-
KT from Swapnil and Neetin on e-verify service status
Discussion with Hrishikesh and swapnil on stand alone
Time Spent | 276.5h [ 995400 ] | 278.5h [ 1002600 ] |
Worklog Id | 31619 [ 31619 ] |
-
- Time Spent:
- 1h
-
KT to Mahendra and Rajendra
Time Spent | 278.5h [ 1002600 ] | 279.5h [ 1006200 ] |
Worklog Id | 31650 [ 31650 ] |
Worklog Id | 31619 [ 31619 ] |
-
- Time Spent:
- 1.5h
-
KT to Rajendra and Mahendra
Time Spent | 279.5h [ 1006200 ] | 281h [ 1011600 ] |
Worklog Id | 31736 [ 31736 ] |
-
- Time Spent:
- 0.5h
-
Stand-up, Tech discussion with Rajendra and Mahendra
Time Spent | 281h [ 1011600 ] | 281.5h [ 1013400 ] |
Worklog Id | 31820 [ 31820 ] |
-
- Time Spent:
- 8h
-
Use case documentation reading
-
- Time Spent:
- 8h
-
Fixing issue of close case and Unit Testing by close another case.
Production Certification Case closed.
Production another cases completed with Swapnil
Fixing Photo Matching DB saving issue.
Time Spent | 281.5h [ 1013400 ] | 289.5h [ 1042200 ] |
Worklog Id | 32129 [ 32129 ] |
Time Spent | 289.5h [ 1042200 ] | 295.5h [ 1063800 ] |
Worklog Id | 32241 [ 32241 ] |
Time Spent | 295.5h [ 1063800 ] | 303.5h [ 1092600 ] |
Worklog Id | 32247 [ 32247 ] |
Time Spent | 303.5h [ 1092600 ] | 311.5h [ 1121400 ] |
Worklog Id | 32249 [ 32249 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
-
- Time Spent:
- 6h
-
Cod check-in to Stage.
solving Issues check list.
Checking Initial Submission issue
Time Spent | 311.5h [ 1121400 ] | 317.5h [ 1143000 ] |
Worklog Id | 32345 [ 32345 ] |
Time Spent | 317.5h [ 1143000 ] | 319h [ 1148400 ] |
Worklog Id | 32618 [ 32618 ] |
Time Spent | 319h [ 1148400 ] | 320h [ 1152000 ] |
Worklog Id | 32619 [ 32619 ] |
-
- Time Spent:
- 7h
-
Debugging Session issue occurring in Section 1.
List A, B, C and Additional document filtration.
Additional document validation.
Date validation changes
Time Spent | 320h [ 1152000 ] | 327h [ 1177200 ] |
Worklog Id | 32667 [ 32667 ] |
-
- Time Spent:
- 6h
-
List B Issuing Authority and Supporting doc save change.
List A, B, C and Additional doc validation change.
Date validate change
Time Spent | 327h [ 1177200 ] | 333h [ 1198800 ] |
Worklog Id | 33014 [ 33014 ] |
-
- Time Spent:
- 8h
-
COI and IssuingAuthority issue fixing.
List A, B, C and Add docs validation and DB save
Documents filtration, validation and code refactoring
Time Spent | 333h [ 1198800 ] | 341h [ 1227600 ] |
Worklog Id | 33289 [ 33289 ] |
Assignee | Rajendra Joshi [ rajendraj ] | Niteen Surwase [ niteen.surwase ] |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: Stage QA(10202)Level 1 values: On Hold(10215) |
Item State | Parent values: Stage QA(10202)Level 1 values: On Hold(10215) | Parent values: Development(10200) |
Item State | Parent values: Development(10200) | Parent values: Stage QA(10202) |
-
- Time Spent:
- 4h
-
Validation Error Message change on Tab.
Looking for Issuing Authority & COI problem.
Time Spent | 341h [ 1227600 ] | 345h [ 1242000 ] |
Worklog Id | 33501 [ 33501 ] |
-
- Time Spent:
- 1.25h
-
internal discussion
unit testing
trunk and stage check-in
Time Spent | 345h [ 1242000 ] | 346.25h [ 1246500 ] |
Worklog Id | 33692 [ 33692 ] |
Item State | Parent values: Stage QA(10202) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
-
- Time Spent:
- 2h
-
Analysis, discussion and test case writing
Time Spent | 346.25h [ 1246500 ] | 348.25h [ 1253700 ] |
Worklog Id | 34360 [ 34360 ] |
Assignee | Niteen Surwase [ niteen.surwase ] | Rajendra Joshi [ rajendraj ] |
Time Spent | 348.25h [ 1253700 ] | 355.25h [ 1278900 ] |
Worklog Id | 34821 [ 34821 ] |
Time Spent | 355.25h [ 1278900 ] | 362.25h [ 1304100 ] |
Worklog Id | 35268 [ 35268 ] |
Time Spent | 362.25h [ 1304100 ] | 369.75h [ 1331100 ] |
Worklog Id | 35271 [ 35271 ] |
Time Spent | 369.75h [ 1331100 ] | 376.75h [ 1356300 ] |
Worklog Id | 35292 [ 35292 ] |
Time Spent | 376.75h [ 1356300 ] | 378.25h [ 1361700 ] |
Worklog Id | 35330 [ 35330 ] |
Time Spent | 378.25h [ 1361700 ] | 383.25h [ 1379700 ] |
Worklog Id | 35397 [ 35397 ] |
-
- Time Spent:
- 2h
-
Fixing issuing authority issue
Time Spent | 383.25h [ 1379700 ] | 385.25h [ 1386900 ] |
Worklog Id | 35440 [ 35440 ] |
Time Spent | 385.25h [ 1386900 ] | 388.25h [ 1397700 ] |
Worklog Id | 35567 [ 35567 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Status | Stage Testing [ 10201 ] | Pending for Production Approval [ 10301 ] |
Status | Pending for Production Approval [ 10301 ] | Approved for production [ 10034 ] |
Status | Approved for production [ 10034 ] | Production Testing [ 10202 ] |
Status | Production Testing [ 10202 ] | Reopen in Production [ 10027 ] |
Status | Reopen in Production [ 10027 ] | In Development [ 10007 ] |
Status | In Development [ 10007 ] | Local Testing [ 10200 ] |
Status | Local Testing [ 10200 ] | Pending for Stage Approval [ 10300 ] |
Status | Pending for Stage Approval [ 10300 ] | Approved for Stage [ 10030 ] |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
-
- Time Spent:
- 5h
-
Looking into case status update issue.
Tech discussion with mahendra.
Checklist
Time Spent | 388.25h [ 1397700 ] | 393.25h [ 1415700 ] |
Worklog Id | 35785 [ 35785 ] |
-
- Time Spent:
- 2h
-
I9 Tech discussion with Mahendra, Shubhangi and Swpanil
Time Spent | 393.25h [ 1415700 ] | 395.25h [ 1422900 ] |
Worklog Id | 36003 [ 36003 ] |
Time Spent | 395.25h [ 1422900 ] | 398.25h [ 1433700 ] |
Worklog Id | 36025 [ 36025 ] |
Remaining Estimate | 0h [ 0 ] | 3h [ 10800 ] |
Time Spent | 398.25h [ 1433700 ] | 395.25h [ 1422900 ] |
Worklog Id | 36025 [ 36025 ] | |
Worklog Time Spent | 3h [ 10800 ] |
-
- Time Spent:
- 2.5h
-
Late Verification issue analysis fixand tested at local
Remaining Estimate | 3h [ 10800 ] | 0.5h [ 1800 ] |
Time Spent | 395.25h [ 1422900 ] | 397.75h [ 1431900 ] |
Worklog Id | 36210 [ 36210 ] |
-
- Time Spent:
- 8h
-
I9 verification check-ins for UI Refresh and LB Branch
Technical discussion with shubhangi, yogesh, rupesh, sushodhan and pratap.
Remaining Estimate | 0.5h [ 1800 ] | 0h [ 0 ] |
Time Spent | 397.75h [ 1431900 ] | 405.75h [ 1460700 ] |
Worklog Id | 36561 [ 36561 ] |
-
- Time Spent:
- 3h
-
committing Localization changes to UiRefresh branch
internal discussion
Assignee | Rajendra Joshi [ rajendraj ] | Niteen Surwase [ niteen.surwase ] |
Time Spent | 405.75h [ 1460700 ] | 408.75h [ 1471500 ] |
Worklog Id | 36901 [ 36901 ] |
-
- Time Spent:
- 2.5h
-
committing localization changes to LB
internal discussion
Time Spent | 408.75h [ 1471500 ] | 411.25h [ 1480500 ] |
Worklog Id | 36902 [ 36902 ] |
-
- Time Spent:
- 4h
-
Checking-in solving UIRefresh issue
Time Spent | 411.25h [ 1480500 ] | 415.25h [ 1494900 ] |
Worklog Id | 36950 [ 36950 ] |
-
- Time Spent:
- 2h
-
LB check-in and Checking issue for LB
Time Spent | 415.25h [ 1494900 ] | 417.25h [ 1502100 ] |
Worklog Id | 37226 [ 37226 ] |
-
- Time Spent:
- 1.5h
-
localization changes and internal discussion
Time Spent | 417.25h [ 1502100 ] | 418.25h [ 1505700 ] |
Worklog Id | 37583 [ 37583 ] |
Time Spent | 418.25h [ 1505700 ] | 418.75h [ 1507500 ] |
Worklog Id | 37583 [ 37583 ] |
-
- Time Spent:
- 8h
-
I9 Verification Production check-ins
Time Spent | 418.75h [ 1507500 ] | 426.75h [ 1536300 ] |
Worklog Id | 37757 [ 37757 ] |
-
- Time Spent:
- 3h
-
I-9 related localization changes check in from stage to production
internal discussion
Time Spent | 426.75h [ 1536300 ] | 429.75h [ 1547100 ] |
Worklog Id | 37788 [ 37788 ] |
Time Spent | 429.75h [ 1547100 ] | 431.75h [ 1554300 ] |
Worklog Id | 37902 [ 37902 ] |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Status | Approved for Stage [ 10030 ] | Stage Testing [ 10201 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) |
Item State | Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) |
-
- Time Spent:
- 2h
-
sanity testing for Tour functionality on Production
Time Spent | 431.75h [ 1554300 ] | 433.75h [ 1561500 ] |
Worklog Id | 38378 [ 38378 ] |
-
- Time Spent:
- 2h
-
Use case execution on stage
Time Spent | 433.75h [ 1561500 ] | 435.25h [ 1566900 ] |
Worklog Id | 38812 [ 38812 ] |
Item State | Parent values: Production QA(10203)Level 1 values: Production Deployed(10221) | Parent values: LB QA(10201) |
Item State | Parent values: LB QA(10201) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Status | Stage Testing [ 10201 ] | Reopen in Stage [ 10023 ] |
Status | Reopen in Stage [ 10023 ] | In Development [ 10007 ] |
Status | In Development [ 10007 ] | Local Testing [ 10200 ] |
-
- Time Spent:
- 5.5h
-
E-verify use cases execution
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
-
- Time Spent:
- 2.5h
-
Analysis and Checking code changes for I9 Status change.
Updating GSM UI statuses for mahendra.
Time Spent | 435.25h [ 1566900 ] | 437.75h [ 1575900 ] |
Worklog Id | 39090 [ 39090 ] |
-
- Time Spent:
- 1h
-
Completing Yankee Doodle case on I9 service to check document no related issue
Time Spent | 437.75h [ 1575900 ] | 438.75h [ 1579500 ] |
Worklog Id | 39694 [ 39694 ] |
-
- Time Spent:
- 5h
-
Analysis and discussion of Task.
Implementing code for Send Email Notification.
Reject reason Views
Time Spent | 438.75h [ 1579500 ] | 443.75h [ 1597500 ] |
Worklog Id | 39697 [ 39697 ] |
Time Spent | 443.75h [ 1597500 ] | 445.75h [ 1604700 ] |
Worklog Id | 39786 [ 39786 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) |
Item State | Parent values: Stage QA(10202)Level 1 values: Stage Deployed(11602) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Status | Local Testing [ 10200 ] | Pending for Stage Approval [ 10300 ] |
Status | Pending for Stage Approval [ 10300 ] | Approved for Stage [ 10030 ] |
Status | Approved for Stage [ 10030 ] | Stage Testing [ 10201 ] |
Assignee | Niteen Surwase [ niteen.surwase ] | Mahendra Mungase [ mahendra.mungase ] |
Time Spent | 445.75h [ 1604700 ] | 451.25h [ 1624500 ] |
Worklog Id | 41680 [ 41680 ] |
Time Spent | 451.25h [ 1624500 ] | 458.25h [ 1649700 ] |
Worklog Id | 41898 [ 41898 ] |
Time Spent | 458.25h [ 1649700 ] | 461.75h [ 1662300 ] |
Worklog Id | 41933 [ 41933 ] |
Time Spent | 461.75h [ 1662300 ] | 467.75h [ 1683900 ] |
Worklog Id | 41954 [ 41954 ] |
-
- Time Spent:
- 6.5h
-
- Analysis and Implementation of expanding static letters limit to dynamic letter upload/download.
- Changes in Model, View, Controller, Value Object and Business Logic
- Unit Testing of Letter Download
- Checking letter download issue on production by changing File Structure.
Time Spent | 467.75h [ 1683900 ] | 474.25h [ 1707300 ] |
Worklog Id | 42124 [ 42124 ] |
Time Spent | 474.25h [ 1707300 ] | 475.75h [ 1712700 ] |
Worklog Id | 42240 [ 42240 ] |
-
- Time Spent:
- 0.75h
-
WSM GUI cases processed and Tech discussion with mahendra.
Short KT about E-verify service account handling.
Time Spent | 475.75h [ 1712700 ] | 476h [ 1713600 ] |
Worklog Id | 42807 [ 42807 ] |
Time Spent | 476h [ 1713600 ] | 476.5h [ 1715400 ] |
Worklog Id | 42807 [ 42807 ] |
-
- Time Spent:
- 2h
-
1.Onboard demo setup preparation and resolving bugs for demo
-
- Time Spent:
- 2.5h
-
E-verify demo preparation
-
- Time Spent:
- 1h
-
Helptext Popup for I9 form with Chhaya
Time Spent | 476.5h [ 1715400 ] | 477.5h [ 1719000 ] |
Worklog Id | 43208 [ 43208 ] |
Time Spent | 477.5h [ 1719000 ] | 479.5h [ 1726200 ] |
Worklog Id | 43249 [ 43249 ] |
-
- Time Spent:
- 1.25h
-
Boundary condition handled for letter downloading
Time Spent | 479.5h [ 1726200 ] | 480.75h [ 1730700 ] |
Worklog Id | 44159 [ 44159 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Assignee | Mahendra Mungase [ mahendra.mungase ] | Niteen Surwase [ niteen.surwase ] |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Development(10200) |
-
- Time Spent:
- 0.5h
-
Code change and Local LB check-in for download letters
Time Spent | 480.75h [ 1730700 ] | 481.25h [ 1732500 ] |
Worklog Id | 44490 [ 44490 ] |
Time Spent | 481.25h [ 1732500 ] | 483.75h [ 1741500 ] |
Worklog Id | 46563 [ 46563 ] |
Time Spent | 483.75h [ 1741500 ] | 489.75h [ 1763100 ] |
Worklog Id | 46571 [ 46571 ] |
-
- Time Spent:
- 1.5h
-
Changing User Pwd and Update to Stage
I9 Works on UIRefresh
Time Spent | 489.75h [ 1763100 ] | 491.25h [ 1768500 ] |
Worklog Id | 52695 [ 52695 ] |
-
- Time Spent:
- 7.25h
-
2 Cases submitted to E-verify
Fixed Close Case popup issue
Tech discussion with Varsha
Issue solving for Employee Save
Unit Testing
Time Spent | 491.25h [ 1768500 ] | 498.5h [ 1794600 ] |
Worklog Id | 53005 [ 53005 ] |
-
- Time Spent:
- 2h
-
Checking e-verify scenarios on Azure
Time Spent | 498.5h [ 1794600 ] | 500.5h [ 1801800 ] |
Worklog Id | 53936 [ 53936 ] |
Item State | Parent values: Development(10200) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Assignee | Niteen Surwase [ niteen.surwase ] | Mahendra Mungase [ mahendra.mungase ] |
-
- Time Spent:
- 3h
-
Code Check-in on UIRefresh for Download letters and other I9 Changes
Time Spent | 500.5h [ 1801800 ] | 503.5h [ 1812600 ] |
Worklog Id | 56370 [ 56370 ] |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) |
Item State | Parent values: LB QA(10201)Level 1 values: LB Deployed(11600) | Parent values: Stage QA(10202) |
Item State | Parent values: Stage QA(10202) | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) |
Assignee | Mahendra Mungase [ mahendra.mungase ] | Niteen Surwase [ niteen.surwase ] |
Item State | Parent values: Stage QA(10202)Level 1 values: In Testing(10214) | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) |
-
- Time Spent:
- 4h
-
Submitting cases to E-verify to check I-9 works or not
-
- Time Spent:
- 2.5h
-
Testing Stage E-verify service on Production
Completed Get Resolved case
Username and Password Update on production
-
- Time Spent:
- 4.5h
-
Check Live E-verify service on Local to mode on Production
Debugging and R&D
Time Spent | 503.5h [ 1812600 ] | 506h [ 1821600 ] |
Worklog Id | 61737 [ 61737 ] |
Time Spent | 506h [ 1821600 ] | 510.5h [ 1837800 ] |
Worklog Id | 61739 [ 61739 ] |
Worklog Id | 61739 [ 61739 ] |
Assignee | Niteen Surwase [ niteen.surwase ] | Mahendra Mungase [ mahendra.mungase ] |
Item State | Parent values: LB QA(10201)Level 1 values: Ready for Stage(10213) | Parent values: LB QA(10201)Level 1 values: On Hold(10211) |
Time Spent | 510.5h [ 1837800 ] | 514.5h [ 1852200 ] |
Worklog Id | 67347 [ 67347 ] |
Status | Stage Testing [ 10201 ] | Pending for Production Approval [ 10301 ] |
Status | Pending for Production Approval [ 10301 ] | Approved for production [ 10034 ] |
Status | Approved for production [ 10034 ] | In Production Testing [ 10202 ] |
Resolution | Bug Fixed [ 10402 ] | |
Status | In Production Testing [ 10202 ] | Production Complete [ 10028 ] |
Transition | Time In Source Status | Execution Times |
---|
|
8d 23h 58m | 1 |
|
3s | 1 |
|
2s | 1 |
|
275d 1h 4m | 1 |
|
4s | 1 |
|
3s | 1 |
|
3s | 1 |
|
5s | 1 |
|
3d 19h 14m | 1 |
|
4s | 1 |
|
14s | 3 |
|
12d 21h 25m | 3 |
|
20s | 3 |
|
11d 3h 54m | 3 |
|
390d 12h 34m | 2 |
|
1m 49s | 2 |
|
2m 4s | 2 |
|
5m 8s | 1 |
1.Update service to new version.
2. In new updated service all method names are changed working on it.